Jump to content

Chongming line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Qui1che (talk | contribs) at 02:15, 11 August 2020 (Improved English text; added Convert templates). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chongming line
 Chongming 
Overview
StatusPlanned
LocaleShanghai, China
Termini
Stations8
Service
TypeRapid transit
Rolling stock6-car Type A[1]
Technical
Line length42.8 km
Operating speed120 km/h[1]

The Chongming line (Chinese: 崇明线; pinyin: Chóngmíng xiàn) is a rapid transit line on the Shanghai Metro that is part of the 2018–2023 Shanghai Metro plan.[2] The Chongming line was previously treated as the last phase of Line 9, and was Line 19 until 2016, when it was renamed the Chongming line.

The Chongming line will start at Template:SHM stations in Pudong and end at Template:SHM stations in Chongming District,[3] and will interchange with Lines 9 and 12.[3] It will be 42.8 kilometres (26.6 mi) long, including a 40.7-kilometre (25.3 mi) underground section.

Planned stations

Station names according to an April 2019 planning document.[3]

Station name Connections Distance
km
Location
English Chinese
Template:SHM stations 金吉路  9 
Template:SHM stations 申江路  12 
Template:SHM stations 高宝路
Template:SHM stations 凌空北路
Template:SHM stations 长兴岛
Template:SHM stations 陈家镇
Template:SHM stations 东滩
Template:SHM stations 裕安

References

  1. ^ a b "上海市轨道交通崇明线工程环境影响评价咨询项目招标公告". 2019-05-27. Archived from the original on 2019-05-27. Retrieved 2019-09-15.
  2. ^ "国家发展改革委关于上海市城市轨道交通第三期建设规划(2018~2023年)的批复". Archived from the original on 2018-12-19. Retrieved 2018-12-19.
  3. ^ a b c "上海市轨道交通崇明线选线专项规划(草案公示)" (PDF). Archived (PDF) from the original on 2019-04-27. Retrieved 2019-04-27.