Jump to content

Line 10 (Shenzhen Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Cyfal (talk | contribs) at 16:43, 6 January 2021 (spelling (WP:Typo Team)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 10
10
Overview
StatusIn operation
LocaleShenzhen, China
Termini
Stations24
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Liangmao Hill Depot
Yitian stabling yard
Rolling stockCRRC Changchun (1001-1035) (Type A, 8 cars)
History
Opened18 August 2020[1]
Technical
Line length29.3 km (18.2 mi)[2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, 1,500 V DC
Operating speed80 km/h (50 mph)
Route map

Huanggekeng
Dynamic Town
Guanjingtou
Youganpu
Longping Road
Shuangyong Street
Pinghu
Pinghu railway station
Hehua
Huanancheng
Mugu
Shanglilang
Liangmao Hill
Liangmao Hill Depot
Gankeng
Xuexiang
Gangtou
Huawei
Bei'er Road
Bantian North
Wuhe
Guangyayuan
Nankeng
Yabao
6
UpperLeft arrow to Songgang
 
connection to Line 9
Maling
Donggualing
connection to Line 3
Lianhuacun
Gangxia North
Gangxia
4 Up arrow to Niuhu
Fumin
Futian Checkpoint
4OSI
Yitian Stabling yard

Line 10 (simplified Chinese: 十号线; traditional Chinese: 十號線; pinyin: Shíhào Xiàn), also known as the Bantian line (坂田线; 坂田線; Bǎntián Xiàn) of the Shenzhen Metro began construction at the end of 2015.[3] The line opened on 18 August 2020.[1] Line 10 has a length of 29.3 km (18.2 mi) and a total of 24 stations.[2] It connects the Futian Checkpoint to Shuangyong Street. In the southern terminus of the line, a 555 meters long and 50.5 meters wide double deck underground depot capable of storing 16 trains will be constructed.[4]

History

Line 10 was originally a low priority line to be constructed in the long term future called Line 16. In 2011, the Shenzhen Municipal Government approved the Longgang District Government to start the preliminary work on Line 10.[5] On 2013, the Shenzhen Municipal Government renumbered Line 16 into Line 10 and included it in the Phase III expansion.[6][7] The original Shenzhen Metro Line 10 was renumbered to Line 12 planned to be built in Phase IV.[8] This was done to fast track the construction of the line to ease the pressure on Line 4 and accommodate further growth of the Longgang area.[9][10] According to the original plan, the northern section of Line 10 runs through Fenggang town of the neighboring Dongguan City. Due to legal and government coordination problems, Line 10 will temporarily terminate in Pinghu, with capability to extend further north into Dongguan in the future.[11] Further into construction, the line was redesigned to handle 8 car trains instead of the original specification of 6 cars to increase the line's ability to handle the growing transport demand in Shenzhen.[12]

Service routes

Stations

Service
routes
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Line 10 Northern Extension (Under planning)
Huangge 黄阁 16 Longgang
Dynamic Town 大远城邦 Fenggang, Dongguan
Guanjingtou 官井头
Youganpu 油甘埔
Longping Road 龙平路
Line 10 (In operation)
Shuangyong Street 双拥街 17 Longgang
Pinghu 平湖 China Railway PHQ 18
Hehua 禾花
Huanancheng 华南城
Mugu 木古
Shanglilang 上李朗 17
Liangmao Hill 凉帽山
Gankeng 甘坑
Xuexiang 雪象
Gangtou 岗头
Huawei 华为
Bei'er Road 贝尔路
Bantian North 坂田北
Wuhe 五和 5
Guangyayuan 光雅园
Nankeng 南坑
Yabao 雅宝
Maling 孖岭 9 Futian
Donggualing 冬瓜岭
Lianhuacun 莲花村 3
Gangxia North 岗厦北[a] 2 14
Gangxia 岗厦 1
Fumin 福民 4 7
Futian Checkpoint 福田口岸 4[b] (File:MTR logo.svg
East Rail line[c])
Line 10 Southern Extension (Under Planning)
Lanhua Road 蓝花道 Futian
Jinhu Road 金琥道
  1. ^ Do not open to transfer Line 2 at the initial stage.
  2. ^ Out-of-station interchange.
  3. ^ System transfer via Lok Ma Chau [thru border check].

Southern extension (under planning)

The southern extension of Line 10 will add two stations.[13]

Northern extension (under planning)

The northern extension of Line 10 will add five stations.

References

  1. ^ a b "官宣!深圳地铁6、10号线8月18日开通初期运营". Shenzhen Metro. 2020-08-16.
  2. ^ a b "地铁6号、10号线传喜讯,计划明年年中迎客". 2019-12-03.
  3. ^ "Archived copy" 地铁10号线拟于本月动工 深圳东部将增添轨道大动脉 - 深视新闻 - 城市联合网络电视台. www.cutv.com. Archived from the original on 2016-06-01. Retrieved 2016-12-13.{{cite web}}: CS1 maint: archived copy as title (link)
  4. ^ "深圳将有国内最大地铁停车场 可同时停16列车_广深新闻_新闻_星岛环球网". news.stnn.cc (in Chinese (China)). Retrieved 2018-07-21.
  5. ^ Huang Chun (黄淳). "Archived copy" 地铁16号线有望2015年提前开工建设 设26站_深圳新闻_深圳新闻网. www.sznews.com. Archived from the original on 2015-09-24. Retrieved 2016-12-13.{{cite web}}: CS1 maint: archived copy as title (link)
  6. ^ "Archived copy" 地铁10号线 终点在平湖---深圳都市报. dtzbd.sznews.com. Archived from the original on 2014-02-25. Retrieved 2016-12-13.{{cite web}}: CS1 maint: archived copy as title (link)
  7. ^ 原地铁10号线将何去何从?. Archived from the original on 2016-08-03.
  8. ^ "Archived copy" 深圳原地铁10号线没有取消 只是建设时序调整_深圳新闻_最全最迅速的深圳资讯—深圳新闻网. www.sznews.com. Archived from the original on 2014-02-25. Retrieved 2016-12-13.{{cite web}}: CS1 maint: archived copy as title (link)
  9. ^ 深圳交委称早7点以前或实行地铁票价优惠. Ifeng Guangzhou. December 5, 2012. Archived from the original on December 4, 2014.
  10. ^ 我市召开轨道交通建设指挥部会议,地铁16号线有望提前开工. 深圳市交通运输委员会 [Shenzhen Municipal Transportation Committee]. January 7, 2013. Archived from the original on January 4, 2015.
  11. ^ "市地铁集团首席规划师刘卡丁:16号线力争提前建设,暂时不到龙岗中心城". 南方日报. December 5, 2012.
  12. ^ "深圳地铁10号线这个站厉害了:710米,亚洲第一长!". sz.news.fang.com. Retrieved 2019-05-13.
  13. ^ "深圳轨道四期拟增加建设87公里". 2019-02-26.