Line 8 (Shenzhen Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 8.210.134.243 (talk) at 17:10, 23 June 2020 (→‎Phase 1). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 8
8
Overview
StatusUnder Construction
LocaleShenzhen, China
Termini
Stations7
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Rolling stockTrains service in Line 2
History
Planned openingOctober 2020[1]
Technical
Line length12.367 km (7.7 mi)[2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Shekou West Depot
Chiwan
Shekou Port
Sea World
Shuiwan
Dongjiaotou
Wanxia
Houhai Stabling Yard
Haiyue
Dengliang
Houhai
13 to Shangwu
Keyuan
Hongshuwan
Window of the World
connection to Line 1
Qiaocheng North
Shenkang
connection to Line 7
Antuo Hill
Qiaoxiang
Xiangmi
Xiangmei North
Jingtian
Lianhua West
Futian
3 11 Futian railway station (Guangdong)
Civic Center
Gangxia North
Huaqiang North
Yannan
Grand Theater
1 to Luohu
Hubei
Huangbeiling
Xinxiu
Liantang Checkpoint
Xianhu Road
Liantang
Up arrow 2/8 Down arrow
Wutong Mountain South
Shatoujiao
Haishan
Yantian Port West
Wangji Lake Stabling Yard
Shenwai Senior Campus
Yantian Road
Honganwei
Yantianxu
Dameisha
Xiaomeisha
Down arrowLine 8 Phase III
(Under Construction)
Xichong Depot
Xichong

Line 8 of the Shenzhen Metro (also known as the Yantian line) is currently under construction. Line 8 has a length of 12.367 km (7.7 mi) and a total of 7 stations.[2] It connects Liantang station in Luohu District with Yantian Road station in Yantian District. Line 8 is the first line to serve Yantian District.

Construction of Phase 1 started in December 2015, with the line scheduled to open in October 2020.[3][4] Line 8 is planned to connect with Line 2, with trains on Line 2 terminating at Liantang station.

Stations

Phase 1

  • Under construction, opening in October 2020
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Liantang 莲塘  2  (through service) Luohu
Wutong Mountain South 梧桐山南
Shatoujiao 沙头角 Yantian
Haishan 海山
Yantian Port West 盐田港西
Yantian Foreign Languages School 深外高中
Yantian Road 盐田路

Phase 2

  • Under construction, opening in 2024[5]
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Beishan Street 北山道 Yantian
Yantian Food Street 盐田食街
Dameisha 大梅沙
Xiaomeisha 小梅沙

References

  1. ^ "深圳地铁8号线将于2020年10月28日正式投入运营". 2019-08-13.
  2. ^ a b "深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代". 2019-08-01.
  3. ^ "深圳地铁8号线将于2020年10月28日正式投入运营". 2019-08-13.
  4. ^ Sasin, Jasmin. "New Metro Lines to Start Construction in September". Shenzhen Standard. Retrieved 23 January 2014.
  5. ^ "深圳地铁两新线同日开建 _大公网". www.takungpao.com. Retrieved 2019-08-13.