Line 8 (Shenzhen Metro)
Line 8 of the Shenzhen Metro (also known as the Yantian line) is currently under construction. Line 8 has a length of 12.367 km (7.7 mi) and a total of 7 stations.[2] It connects Liantang station in Luohu District with Yantian Road station in Yantian District. Line 8 is the first line to serve Yantian District.
Construction of Phase 1 started in December 2015, with the line scheduled to open in October 2020.[3][4] Line 8 is planned to connect with Line 2, with trains on Line 2 terminating at Liantang station.
Stations
Phase 1
- Under construction, opening in October 2020
Station name | Connections | Nearby bus stops | Distance km |
Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
Liantang | 莲塘 | 2 (through service) | Luohu | |||
Wutong Mountain South | 梧桐山南 | |||||
Shatoujiao | 沙头角 | Yantian | ||||
Haishan | 海山 | |||||
Yantian Port West | 盐田港西 | |||||
Yantian Foreign Languages School | 深外高中 | |||||
Yantian Road | 盐田路 | |||||
Phase 2
- Under construction, opening in 2024[5]
Station name | Connections | Nearby bus stops | Distance km |
Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
Beishan Street | 北山道 | Yantian | ||||
Yantian Food Street | 盐田食街 | |||||
Dameisha | 大梅沙 | |||||
Xiaomeisha | 小梅沙 | |||||
References
- ^ "深圳地铁8号线将于2020年10月28日正式投入运营". 2019-08-13.
- ^ a b "深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代". 2019-08-01.
- ^ "深圳地铁8号线将于2020年10月28日正式投入运营". 2019-08-13.
- ^ Sasin, Jasmin. "New Metro Lines to Start Construction in September". Shenzhen Standard. Retrieved 23 January 2014.
- ^ "深圳地铁两新线同日开建 _大公网". www.takungpao.com. Retrieved 2019-08-13.