Beijing–Lanzhou corridor
Appearance
Beijing-Lanzhou Passageway 京兰通道 | |
---|---|
Overview | |
Status | Partly operational |
Locale | People's Republic of China |
Termini | |
Service | |
Type | High-speed rail |
Operator(s) | China Railway High-speed |
Technical | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50Hz 25,000V |
Operating speed | 200 to 350 km/h (124 to 217 mph) |
The Beijing-Lanzhou Passageway is a high-speed rail corridor running from Beijing through Hohhot and Yinchuan to Lanzhou. It was announced in 2016 as part of the "Eight Verticals and Eight Horizontals" railway network plan.
Sections
Section Railway line |
Description | Designed speed (km/h) |
Length (km) |
Construction start date |
Open date |
---|---|---|---|---|---|
Beijing-Zhangjiakou Beijing–Zhangjiakou Intercity Railway |
Intercity railway between Beijing to Zhangjiakou. | 250 | 174 | 2014 | |
Zhangjiakou-Hohhot Zhangjiakou–Hohhot High-Speed Railway |
HSR connecting Hohhot with Zhangjiakou. | 250 | 287 | 2014-04-28 [1] | 2018-03-31 |
Hohhot-Baotou Jining–Baotou Railway (section) |
Section of larger railway connecting Jining with Baotou. | ||||
Baotou-Lanzhou Baotou–Lanzhou Railway |
Upgraded conventional rail line from Baotou to Lanzhou. | 995 |
References
- ^ "内蒙古首条高铁预计2017年建成". 光明日报.