Jump to content

Line 1 (Nanjing Metro)

From Wikipedia, the free encyclopedia
Line 1
A Line 1 train approaching Sanshanjie
Overview
Other name(s)Tianyin Line
StatusIn operation
LocaleJiangning, Yuhuatai, Qinhuai, Gulou, Xuanwu and Qixia districts
Nanjing, Jiangsu
Termini
Stations32
Service
TypeRapid transit
Rolling stockAlstom Metropolis
Daily ridership763,000 (2014 Avg.)
1.207 million (2019 Peak)[1]
History
OpenedAugust 12, 2005; 19 years ago (2005-08-12)
Technical
Line length45.4 km (28.2 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed65km/h (Normal), 80km/h (Maximum)
Route map

Erqiaogongyuan Depot
Baguazhoudaqiaonan
Badoushan
Yanziji
Jixiang'an
Xiaozhuang 7 
Maigaoqiao
Hongshan Zoo
Left arrow Linchang  3 
Nanjing railway station 3  9 China Railway
Xinmofan­malu
Xuanwumen
Gulou 4 
Zhujianglu
Xinjiekou 2 
Zhangfuyuan
Sanshanjie 5 
Zhonghuamen
China Railway
 10  Phase 2 Right arrow
Andemen 10 
to  10 
Left arrow  10  to Yushanlu
Xiaohang Depot
Tianlongsi
Ruanjian­dadao
Huashenmiao
Nanjing South Railway Station  3  6  S1  S3 
(Left arrow Gaojiachong  S3 
Shuanglong­dadao
Hedingqiao
Shengtailu
Baijiahu
Xiaolongwan
Zhushanlu 5 
Tianyin­dadao
Longmian­dadao
NMU - JIETT
NJCI
CPU
CPU Depot

Line 1 of the Nanjing Metro (Chinese: 南京地铁1号线; pinyin: Nánjīng Dìtiě Yī Hào Xiàn) is a north-south line and the first operating metro line in the Nanjing Metro system, inaugurated on September 3, 2005. After the opening of the 25.08 km (15.58 mi)-long south extension line on May 28, 2010,[2] the total length of Line 1 is now 37.9 km (23.5 mi),[3] running from CPU to Maigaoqiao.

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
Maigaoqiao — Andemen 27 August 2005 21.72 km (13.50 mi) 12 Phase 1 (1st section)
Andemen — Xiaohang 27 August 2005 2.1 km (1.30 mi) 1 Phase 1 (2nd section)
Xiaohang — Olympic Stadium 3 September 2005 4.6 km (2.86 mi) 3 Phase 1 (3rd section)
Andemen — CPU 28 May 2010 25.08 km (15.58 mi) 14 Southern extension
Nanjing South 28 June 2011 Infill station 1
Andemen[a] — Olympic Stadium 1 July 2014 −6.7 km (−4.16 mi) -4 Line 1 & 10 realignment project
Baguazhoudaqiaonan — Maigaoqiao 28 December 2022 6.524 km (4.05 mi) 5 Northern extension
  1. ^ Not including Andemen (elevated) station.

Route

[edit]

This line mainly runs in a north-south direction. It starts at Baguazhoudaqiaonan station in the north, and continues southwards towards CPU station which is located at the southeastern side of Nanjing.

Of the total 21.72 km (13.50 mi) of the main line track, 14.33 km (8.90 mi) of the Line 1 track runs underground, while 7.39 km (4.59 mi) of the track run on or above the ground. Of the total 16 stations, 11 of them are underground stations while the other 5 are either ground or elevated stations. The southern extension line of Metro Line 1 has a total length of 25.08 km (15.58 mi) with 15 stations (excluding Andemen station). Of the total 15 stations, 8 of them are underground and the other 7 are all elevated stations.[4]

The northern extension covers a length of 7.2 km (4.5 mi) (6.7 km (4.2 mi) underground and 0.5 km (0.31 mi) elevated) with 5 underground stations(excluding Maigaoqiao station).[5] It's completed in 2022.[6]

Stations

[edit]
Service
routes
Station name Connections Distance
km
Location
English Chinese
Baguazhoudaqiaonan 八卦洲大桥南 --- 0.000 Qixia
Badoushan 笆斗山 1.370 1.370
Yanziji 燕子矶 1.292 2.662
Jixiang'an 吉祥庵 1.115 3.777
Xiaozhuang 晓庄  7  1.007 4.784
Maigaoqiao 迈皋桥 1.910 6.694
Hongshan Zoo 红山动物园 1.142 7.836 Xuanwu
Nanjing Railway Station 南京站  3   9 
Nanjing railway station Nanjing railway station NJH
1.123 8.959 Gulou / Xuanwu
Xinmofan­malu 新模范马路 1.691 10.650
Xuanwumen 玄武门 1.061 11.711
Gulou 鼓楼  4  1.254 12.965
Zhujianglu 珠江路 0.862 13.827
Xinjiekou 新街口  2  1.147 14.974 Gulou / Xuanwu / Qinhuai
Zhangfuyuan 张府园 1.125 16.099 Qinhuai
Sanshanjie 三山街  5  0.909 17.008
Zhonghuamen 中华门 1.914 18.922 Qinhuai / Yuhuatai
Andemen 安德门  10  2.093 21.015 Yuhuatai
Tianlongsi 天隆寺 1.455 22.470
Ruanjian­dadao 软件大道 1.283 23.753
Huashenmiao 花神庙 1.076 24.829
Nanjing South Railway Station 南京南站  3   6   S1   S3  Nanjing South railway station NKH 1.853 26.682 Yuhuatai / Jiangning
Shuanglong­dadao 双龙大道 2.276 28.958 Jiangning
Hedingqiao 河定桥 1.345 30.303
Shengtailu 胜太路 0.904 31.207
Baijiahu 百家湖 1.332 32.539
Xiaolongwan 小龙湾 1.475 34.014
Zhushanlu 竹山路  5 [i] 1.135 35.149
Tianyin­dadao 天印大道 1.919 37.068
Longmian­dadao 龙眠大道 1.312 38.380
NMU / JIETT 南医大·江苏经贸学院 1.550 39.930
NJCI 南京交院 2.720 42.650
CPU 中国药科大学 1.964 34.614
  1. ^ Virtual transfer with line 5 – For passengers transfer within 30 minutes after exiting with a Passenger Code or a Public Transit Card, continuous billing is adopted; Passengers with token need to transfer just by putting the ticket into recycling port and afterwards repurchase a ticket; Passengers with UnionPay Quick Pass Card headed by 62 or Mobile Pay can transfer just by tapping in again after exiting.

References

[edit]
  1. ^ 南京地铁 (2019-03-09). 【刷新纪录!妇女节南京地铁客流突破408万人次】. 新浪微博 (in Chinese). Retrieved 2019-03-12.
  2. ^ "Nanjing Metro places €85·5m train order". Railway Gazette International. 2008-01-25. Archived from the original on 2016-10-22.
  3. ^ 南京地铁. www.nj-dt.com. Archived from the original on 2013-11-06. Retrieved 2010-05-27.
  4. ^ "南京地铁". www.nj-dt.com. Retrieved 2010-05-27.
  5. ^ "苦等多时,1号线北延迎来重要进展,开通时间……". 南京地铁1号线北延线工程南起地铁1号线迈皋桥站,北至二桥公园站,线路全长7.2km,其中高架线0.5km,地下线6.7km,全线设5座地下站
  6. ^ "1号线北延线、7号线北段今日12时开通初期运营". 2022-12-28.
[edit]
  • Line 1 on the official Nanjing Metro website (includes route map) (in Chinese)