Tarlac–Pangasinan–La Union Expressway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Danielle Lenon (talk | contribs) at 05:55, 13 January 2018 (→‎Construction of phase 3 (Urdaneta to Rosario)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Tarlac–Pangasinan–La Union Expressway
Map of expressways in Luzon, with the Tarlac‑Pangasinan‑La Union Expressway in red
Route information
Maintained by Private Infra Dev Inc.
Length88.85 km (55.21 mi)
Component
highways
Major junctions
South end E1 (Subic–Clark–Tarlac Expressway) / N58 (Santa Rosa–Tarlac Road) – La Paz, Tarlac
Major intersections
North end
Location
CountryPhilippines
Major cities
Towns[1]
Highway system
  • Roads in the Philippines

The Tarlac–Pangasinan–La Union Expressway (TPLEx) is an 88.85-kilometre (55.21 mi) four-lane expressway currently under construction north of Manila, in the Philippines. It connects central to northern Luzon,[2] with its southernmost terminal located in Tarlac City, Tarlac and its planned northernmost terminus currently slated to be at Rosario, La Union.[1][3]

The first section of the project, from Tarlac City to Pura, Tarlac, has been operating on a "soft opening" basis since October 31, 2013, and was ready for full operation in November 2013.[4]

Part of the second segment, which will take motorists up to Ramos, Tarlac, opened on December 23, 2013. The remaining section from Anao, Tarlac up to Rosales, Pangasinan, is projected for a mid-2014 opening, and the final section ending in Rosario, La Union, is slated for completion in June 2019.[1][3]

Proposals have also been raised for extending the project all the way to Laoag in Ilocos Norte.[2]

The TPLEX is an extension of North Luzon Expressway and Subic–Clark–Tarlac Expressway from Tarlac to Rosario, La Union.

The expressway crosses the three rivers within the province of Pangasinan. The rivers along the TPLEx area are Agno River, Binalonan River, and Bued River.

Route description

TPLEX follows a route that parallels the MacArthur Highway from Tarlac City in Tarlac to Binalonan in Pangasinan. The whole expressway has four lanes, with two lanes per direction, separated by a concrete barrier. Sections on the exits and their approaches are illuminated with street lights at night. Significant sections of the expressway are built on raised land overlooking rice paddy fields. The whole expressway is designated as part of expressway E1 of the Department of Public Works and Highways Route Numbering System[5] High voltage power lines, primarily transmission and subtransmission lines which are operated and maintained by National Grid Corporation of the Philippines (NGCP) and various distribution companies, respectively, run parallel or cross the expressway.

Tarlac

Travelling north on the TPLEx towards Pura

The Tarlac–Pangasinan–La Union Expressway starts in Tarlac City as a physical extension of the Subic–Clark–Tarlac Expressway. The expressway passes through the municipalities of Victoria, Pura, Ramos, and Anao. Significant portions of the expressway in Tarlac are built on raised land or embankments, and existing roads cross through underpasses built on cuts on the embankment. The road enters Cuyapo in Nueva Ecija without any major junction, before entering Pangasinan, at the municipality of Rosales.

Pangasinan

The viaduct over Agno River in the Rosales–Villasis boundary. The San Manuel–Concepcion–Mexico transmission line of National Grid Corporation of the Philippines can be seen on its right side.

The Pangasinan segment of TPLEX starts at the municipality of Rosales, which has two exits, named Rosales and Carmen, with the former remaining unopened. The expressway the crosses through a viaduct over the Agno River, alongside with the San Manuel–Concepcion–Mexico transmission line of NGCP. An abandoned steel lattice tower is visible from the viaduct and is located at the middle of a grassland. The road then enters Urdaneta, which is served by a single interchange that connects with MacArthur Highway. The Urdaneta exit served as the expressway's northern terminus until the extension to Binalonan opened. Past Urdaneta Exit, TPLEX crosses above the Manila North Road and under a 500,000 kilovolt transmission line from Kadampat, then ends at a partially opened trumpet interchange with Route 210 to Manaoag and Mangaldan.

History

Conception and early development

Although calls for the creation of an expressway system that would stretch from the Philippine Capital of Manila all the way to Rosario, the southernmost town of the province of La Union, had been raised even before the turn of the millennium,[6] these calls first actually began to bear concrete fruit in the mid-2000s.

In 2005, construction began on the Subic–Clark–Tarlac Expressway (SCTEx), creating a linked expressway system which reached all the way to Tarlac City, Tarlac - an improvement over the North Luzon Expressway's terminus which reached only up to Mabalacat, Pampanga.

In 2006, Congressional representatives from Northern Luzon took advantage of the final reading of House Bill 5749[7] to lobby for a project that would extend the expressway system to Rosario, as a means to boost trade, tourism, and speed up transportation in the provinces of Tarlac, Eastern Pangasinan, and La Union.[8] As a result of this lobbying, the Arroyo administration announced in October 2006 a ten-year period in which the North Luzon Expressway (NLEX) would be extended from Mabalacat, Pampanga, to Rosario, La Union, and the South Luzon Expressway (SLEX) would be extended from Calamba, Laguna, to Lucena in Quezon, and eventually up to Matnog, Sorsogon.[9]

In 2008, the SCTEx was formally opened, setting the stage for the development of the TPLEx, which would extend beyond the SCTEx' terminus in Tarlac City.

The initial plan for the construction of the TPLEx was that it would be carried out in two phases: The first phase would involve the construction of two lanes while the second phase entailed its expansion into four lanes to accommodate 25,000 vehicles.

The proposed superhighway would be built parallel to MacArthur Highway, passing through the city of Tarlac and the municipalities of La Paz, Gerona, Victoria, Pura, Anao, and Ramos in Tarlac, Nampicuan and Cuyapo in Nueva Ecija and Rosales, Villasis, Urdaneta, Binalonan, Pozorrubio and Sison in Pangasinan, and Rosario, La Union.[10]

Development stage Tollway alignment
Phase 1 Tarlac City, Tarlac, to Rosales, Pangasinan
Phase 2 Rosales, Pangasinan, to Urdaneta City, Pangasinan
Phase 3 Urdaneta City, Pangasinan, to Rosario, La Union
Extension Rosario, La Union, to San Fernando, La Union

The financing, design, construction, operation, and maintenance of the Tarlac–La Union Toll Expressway phase 1 was eventually awarded to Private Infra Dev Corporation (PIDC)[11][12]

Project financing

Three local banks undertook the financing of the TPLEX: BDO Unibank, Development Bank of the Philippines, and Land Bank of the Philippines. This made TPLEX notable in the Infrastructure and Development Financing industry "the first Public-Private Partnership project in the Philippines to feature an all-domestic cast of sponsors and lenders.” London-based Project Finance Magazine named the TPLEX as its "Asia Pacific Transport Deal of the Year" for 2011.[13]

The project is being implemented through public-private partnership using the build–operate–transfer (BOT) scheme in which the project proponent is responsible for the design, financing, and construction of the initial two-lane expressway.

As each section of the toll road is completed, it is turned over to the government. The government then grants the proponent the franchise to operate and maintain the toll road, after which the proponent, after a certificate to commence toll operation issued by the Toll Regulatory Board, operates the road on behalf of the government under a long term concession agreement.

Development disputes

Alignment dispute over San Fabian and Pozorrubio routes, both in Pangasinan

Land acquisition

A contributor to delays in the early development of the TPLEX was the acquisition of the Right of Way for the project. With the TPLEX identified as a high priority government project,[14] the Department of Public Works and Highways (DPWH) was given the task of acquiring the Right of Way for the project's proposed alignment, and was allocated P793 million in the hope that the process could be expedited.[15] However, numerous legal disputes regarding affected properties, notably in the Tarlac segment of the project,[16] meant delays in the negotiation process being undertaken by the DPWH.[17][18]

Alignment of the Rosario interchange

The expected completion of the entire expressway caused a major delay when an unsolicited proposal was brought up to change the alignment of the project to change the location of the final interchange in Rosario, La Union.[19][20][21] Former Pangasinan 5th District Representative Mark Cojuangco proposed three alignments: one would pass through Urdaneta City, then San Fabian, and exits Brgy. Cataguintingan of Rosario, La Union. This is about 1.48 kilometers longer from the original TPLEX end at Barangay Subusob, Rosario. The second proposal will also pass through San Fabian but will end at the original TPLEX end at Barangay Subusob. The first two proposals skips Pozorrubio. The third proposal will pass through Pozorrubio, San Fabian, and then end at Barangay Subusub. All proposals intend to skip the municipality of Sison. The Cordillera Administrative Region Development Council has rejected the idea.[22] The target completion date had been moved from end of April 2017 to end April 2018.[23]

Construction of phase 1 (Tarlac City to Rosales)

Approaching Victoria exit. The first phase (Tarlac City–Victoria–Pura) was opened to motorists in November 2013

The first phase of the Tarlac-La Union Toll Expressway started in January 2010.[24][25]

The new TPLEX Logo as a part of SMC Infrastructure

In April 2013, San Miguel Corporation announced that the segment from Tarlac City up to Urdaneta will be built with four lanes, instead of the initial plan of two lanes only. However, this also pushed back the opening day of the expressway from June 2013 to November 2013.[26]

Tarlac City–Pura segment opening

On October 25, 2013, the Toll Regulatory Board authorized the issuance of the Toll Operation Permit for the Tarlac CityPura segment of the TPLEX after the construction of that segment was completed by Private Infra Dev Corp. (PIDC), the all-Filipino consortium backed by conglomerates San Miguel Corp. (SMC) and DMCI Holdings Inc.[4]

This first phase, referred to as section 1A, begins with a connection to SCTEX, then stretches 17 kilometres (11 miles) from Tarlac City to Victoria, and then to Pura, Tarlac. It is expected to cut current travel time to Baguio by as much as 40 minutes.[4]

Pura–Ramos segment opening

On December 23, 2013, the expressway opened up to Ramos, Tarlac, bringing TPLEX up to 23 kilometres (14 mi) of its operational length.

Ramos–Carmen/Rosales segment opening

On April 16, 2014, phase 1 of the project was completed when the Rosales section was opened in time for the Lenten traffic and it is the halfway to go to Baguio.

Construction of phase 2 (Rosales to Urdaneta)

Carmen–Urdaneta segment opening

In December 2014, section 2 of the project, covering 13.72 km from Carmen to Urdaneta, was opened to traffic, as what PIDC president Mark Dumol had announced on the day the completion of phase 1 was announced.

Construction of phase 3 (Urdaneta to Rosario)

In the December 2014 announcement for the opening of phase 2, Dumol also projected that the last section, covering 25.83 km from Urdaneta to Rosario and including an exit in Pozorrubio, would be completed some time in 2015.[27] However, there were delays in the implementation of the project, which included a highly disputed proposal to divert the exit 7 kilometres (4.3 miles) away to San Fabian in Pangasinan.

The DPWH and the PIDC announced in July 2015 that they will continue to follow the original plan for the last phase exiting in Rosario, adding that this last phase would be completed by the following year, 2016.[28]

This development phase was further subdivided into phase 3A, from Urdaneta to Pozorrubio, and phase 3B, Pozorrubio to Rosario. Section 3A would include trumpet-type interchanges at Binalonan and Pozorrubio, while section 3B include an interchange at Sison and the roundabout-style terminus interchange in Rosario, La Union.[29]

After the opening of the exit at Binalonan in December 2017, the DPWH said segment 3B from Pozorrubio to Rosario is expected to be completed in June 2019.[30]

Urdaneta to Binalonan segment opening

By mid-August 2016, the first exit of section 3A, at Binalonan, Pangasinan, had been opened to the driving public. Notably, this created easy access to the Minor Basilica of Our Lady of Manaoag, located only 10 minutes away from the new Binalonan exit plaza.[31]

Binalonan to Pozzorubio segment opening

Pozorrubio Interchange under construction in MacArthur Highway in the town of Pozorrubio, Pangasinan

By December 6, 2017, the last exit of section 3A, at Pozzorubio, Pangasinan, had been opened to the driving public. In September 2016, DPWH said this exit of section 3A, which covers the 7.53-km from Binalonan to Pozorrubio, was supposed to open in December 2016. The Binalonan to Pozorrubio section was expected to open around October 27, 2017, but the section did not open on that date due to the minor right-of-way issues on the missing 1-kilometer fence. [32]

Future

Pozorrubio to Sison and Rosario Terminus

With the opening of the Pozzorubio exit on December 6, 2017 and the decision with DPWH to stick with the original alignment, the PIDC has announced the construction of another exit in Sison which was not included in the original proposal.[33] The segment from Pozzorubio to Sison is expected to be completed in March or April 2018 while due to the dispute caused by the unsolicited San Fabian realignment proposal, the project target completion towards the Rosario terminus is on June 2019.

Extension to Laoag

On June 11, 2013, at the Annual Stockholders Meeting of San Miguel Corporation, its Chairman, Eduardo Cojuangco Jr., revealed plans of extending the expressway north to Laoag, Ilocos Norte. He said that the extension of the toll will road business to Laoag has been raised during the Arroyo administration.[34]

Extension to San Fernando, La Union

As a part of the project of increasing the 200 km radius of High Standard Highways of the Japan International Cooperation Agency (JICA) into a 300 km radius from Metro Manila, the expressway will be extended to the city of San Fernando, La Union.[35]

Technical specifications

  • Name: Tarlac–Pangasinan–La Union Expressway
  • Concession holder: Private Infra Dev Corporation
  • Operator: Private Infra Dev Corporation
  • Length: 88.85 kilometres (55.21 miles) (Including the extension)
  • Concession starting date: October 2013
  • Concession ending date: February 2044
  • Highway exits: 11
  • Lanes: 4 Lanes (2 Lanes each direction)
  • Toll plazas: 2
  • Rest and service areas: 2
  • Minimum height clearance on underpasses: 4.28 metres (14.0 feet)

Toll

The Tarlac–Pangasinan–La Union Expressway uses a closed road tolling system where motorists get a card upon entry and surrender it on exit. The toll fee is per kilometer travelled, and divided by vehicle class. No electronic toll collection (ETC) system is used on TPLEX, despite the connection with SCTEX, which started to use the Easytrip ETC system after a toll system integration with NLEX, but a proposal for a unified ETC system will starts its use on the expressway.

Class Toll[36]
Class 1
(cars, motorcycles, SUVs, jeepneys)
3.50/km
Class 2
(buses, light trucks)
₱8.70/km
Class 3
(heavy trucks)
₱10.50/km

Features

Special features of the expressway will include:[37]

  • A fleet of patrol cars and emergency assistance vehicles that can respond to motorists anywhere along the stretch within 10 minutes
  • Rumble strips
  • Concrete barriers
  • Guardrails
  • Lay by
  • Lighting and cameras in all toll plazas
  • Signs and pavement markings with powdered glass beads for enhanced visibility
  • Speed sensors to ensure motorists will keep to the 100-kilometers per hour limit
  • Toll plazas in major entry points will be equipped with electronic card dispensing machines
  • Toll fare display are identical to Skyway-NAIA Interchange display in all toll plazas
  • All installations will be fiber optic, internet-enabled

Exits

Current exits

Exits are numbered by kilometer post, with Rizal Park in Manila designated as Kilometer 0. Exits start at 124 because the SCTEX is connected with TPLEX. Thus, the last exit of SCTEX will be succeeded by an exit in TPLEX.

ProvinceCity/MunicipalitykmmiExitNameDestinationsNotes
TarlacTarlac City12477124Tarlac City E1 (SCTEX), Tarlac City, La Paz, CabanatuanFolded diamond interchange. Road continues south as Subic–Clark–Tarlac Expressway. To be demolished for the construction of a new interchange for the future CLLEX.
12678Tarlac toll plaza (cash payments)
Victoria13081VictoriaVictoria, TalaveraTrumpet interchange.
Gerona13483Petron TPLEX (northbound and southbound)
Pura13886PuraGerona, Pura, GuimbaTrumpet interchange.
Ramos14489RamosPaniqui, Ramos, GuimbaTrumpet interchange.
Anao15093AnaoAnao, MoncadaTrumpet interchange.
Nueva EcijaCuyapoNo major junctions
PangasinanRosales169105CarmenCarmen, RosalesTrumpet interchange. Access to Manila North Road.
169105Carmen Toll plaza (Demolished)
171106TomanaCarmen, RosalesNorthbound exit and southbound entrance. Access to Carmen–Poblacion Rosales Road. When the Carmen Exit was opened, the exit is permanently closed.
RosalesVillasis boundaryAgno Viaduct
VillasisNo major junctions
Urdaneta184114UrdanetaUrdaneta, DagupanTrumpet interchange.
Binalonan189117BinalonanBinalonan, Manaoag, MangaldanTrumpet interchange. Access to the Our Lady of Manaoag shrine.
Pozorrubio199124PozorrubioPozorrubioTrumpet interchange. Access to Manila North Road. Current North end of expressway.
Sison204127SisonSison
La UnionRosario209130Rosario toll plaza (cash payments)
210130RosarioRosario, Kennon Road, Aspiras–Palispis HighwayRoundabout interchange. Future north end of expressway.
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Future Extension Exits

These are the proposed exits for the San Fernando, La Union Extension Proposal

ProvinceCity/MunicipalitykmmiExitNameDestinationsNotes
La UnionSanto TomasSanto Tomas
AgooAgoo
AringayAringay
CabaCaba
BauangBauang
San FernandoSan Fernando toll plaza
San Fernando CityConnects with F. Ortega Highway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ a b c Arcangel, Xianne (October 29, 2013). "First phase of TPLEX to begin operations Wednesday". GMA News Online. GMA Network Inc. Retrieved October 29, 2013.
  2. ^ a b Lowe, Aya (June 12, 2013). "TPLEx may extend up to Laoag — Cojuangco". Rappler.com. Ortigas Center, Pasig City: Rappler, Inc. Retrieved October 30, 2013.
  3. ^ a b Rebuyas, Michael (November 2, 2013). "17-km stretch of TPLEx now open to motorists". The Philippine Star. Mandaluyong City, Philippines. Retrieved November 2, 2013.
  4. ^ a b c Camus, Miguel R. (October 27, 2013). "First phase of TPLEx set to open on Oct. 30". Philippine Daily Inquirer. Makati, Metro Manila: Inquirer.net. Retrieved October 27, 2013. {{cite news}}: Cite has empty unknown parameter: |coauthors= (help)
  5. ^ "Route Numbering System 2016: Region III" (Map). 2016 DPWH Atlas. 1:975000. Department of Public Works and Highways. 2016. Retrieved May 25, 2017.
  6. ^ "Tarlac–Pangasinan–La Union Expressway (TPLEx) Fact Sheet" (PDF). PUBLIC-PRIVATE PARTNERSHIP (PPP) CENTER FOR PUBLIC INFORMATION. Retrieved October 30, 2013.
  7. ^ "PNCC to extend NLEX to Rosario in La Union". Business Mirror. Makati City, Philippines: Philippine Business Daily Mirror Publishing Inc. Retrieved October 30, 2013.
  8. ^ "NEDA BOARD APPROVES TPLEX, INCREASES FINANCING FOR ARMM SOCIAL FUND". National Economic and Development Authority (Philippines). February 2, 2010. Archived from the original on November 4, 2013. Retrieved November 30, 2013.
  9. ^ Diaz, Jess (October 7, 2006). "Malacañang approves extension of NLEX, SLEX". The Philippine Star. Mandaluyong, Philippines: Philstar. Retrieved October 30, 2013.
  10. ^ NEDA Project Proposal Monitoring
  11. ^ "San Miguel acquires 35% stake in Tarlac-La Union road project". abs-cbnNEWS.com. August 27, 2009. Retrieved October 30, 2013.
  12. ^ Zurbano, Joel (February 4, 2008). "Up Ahead: Fast Road to Baguio". Manila Standard. City of Manila, Philippines: Kamahalan Publishing Corporation. Archived from the original on February 5, 2008.
  13. ^ Zurbano, Joel (April 22, 2012). "Tollway is 'deal of the year'". The Manila Standard. City of Manila, Philippines: Kamahalan Publishing Corporation. Archived from the original on April 22, 2012.
  14. ^ "PGMA lauds private sector for joining TPLEX project". balita.ph. Philippine News Agency. March 1, 2010. Retrieved May 30, 2011.
  15. ^ "DPWH speeds up TPLEX construction". Manila Bulletin. Intramuros, Manila, Philippines: Manila Bulletin Publishing Corporation. September 14, 2011. Archived from the original on September 14, 2011. Retrieved October 30, 2013.
  16. ^ Cervantes, Ding (January 4, 2013). "TARLAC-LA UNION EXPRESSWAY PROJECT -- Farmer groups: DPWH paying 'fake' claimants". Punto! Central Luzon. City of San Fernando, Pampanga, Philippines: LLL Trimedia Coordinators. Retrieved October 30, 2013.
  17. ^ Sotelo, Yolanda (January 6, 2013). "TPLEX opens in June, cuts travel time by one hour". Northern Watch. Dagupan City, Pangasinan. Retrieved September 30, 2013.
  18. ^ http://newsinfo.inquirer.net/668390/tplex-rerouting-squabble-sizzles
  19. ^ Palangchao, Harley (May 1, 2011). "Solons bat for original TPLEX plan to boost tourism, economy". Baguio Midland Courier. Baguio, Philippines.
  20. ^ http://newsinfo.inquirer.net/16628/a-hump-at-expressway%E2%80%99s-endpoint
  21. ^ See, Dexter A. (March 6, 2015). "Tplex exit re-do costly — Cosalan". Manila Standard. Retrieved May 29, 2017.
  22. ^ "RDC ExCom nixes bid to realign TPLEX". National Economic and Development Authority Cordillera Administrative Region. Baguio, Philippines. January 27, 2015.
  23. ^ http://build.gov.ph/Home/Summary/43?Agency=DPWH
  24. ^ Role, Jennilyne C. (January 27, 2010). "PGMA leads TPLEX groundbreaking". Retrieved May 30, 2011.
  25. ^ "Arroyo to lead expressway groundbreaking". Sun Star Pangasinan. Ortigas Center, Pasig City, Philippines: Sun Star Publishing Inc. February 28, 2010. Retrieved May 30, 2011.
  26. ^ Hermoso, Tito (April 24, 2013). "What happens next?". AutoIndustriya.com. AutoIndustriya. Retrieved May 3, 2013.
  27. ^ Agcaoili, Lawrence (April 14, 2014). "SMC to open new segment of TPLEx". philstar.com. The Philippine Star. Retrieved May 29, 2017.
  28. ^ Dumlao, Artemio (July 13, 2015). "TPLEX exit in La Union to go on as planned". philstar.com. The Philippine Star. Retrieved May 29, 2017.
  29. ^ http://www.dpwh.gov.ph/PPP/projs/tplex.htm accessed September 1, 2016.
  30. ^ http://newsinfo.inquirer.net/816473/new-tplex-exit-shortens-travel-to-pilgrim-site
  31. ^ TPLEX'S BINALONAN TOLL PLAZA NOW OPEN. The Philippine Star, August 16, 2016. http://www.pressreader.com/philippines/the-philippine-star/20160816/282187945419851 accessed September 1, 2016.
  32. ^ BUSINESS TPLEX now extended to Pozorrubio in Pangasinan. Rappler, December 7, 2017. https://www.rappler.com/business/190689-tplex-binalonan-pozorrubio-segment-pangasinan-opening-dpwh accessed December 8, 2017.
  33. ^ https://newsinfo.inquirer.net/950418/tplex-exit-opens-but-gridlock-still-seen-as-problem-in-n-luzon
  34. ^ http://www.rappler.com/business/industries/208-infrastructure/31131-tplex-may-extend-up-to-laoag
  35. ^ "TPLEX Extension | Department of Public Works and Highways". www.dpwh.gov.ph. Retrieved May 4, 2017.
  36. ^ http://www.dpwh.gov.ph/ppp/main2.asp?page=a18
  37. ^ Agcaoili, Lawrence (October 28, 2013). "SMC to open Tarlac portion of P24-B TPLEX". The Philippine Star. Mandaluyong City, Philippines. Retrieved September 30, 2013.

External links

Template:PhilExpwy