The Turkish State Railways started building high-speed rail lines in 2003. The first line, which has a length of 533 km from Istanbul (Turkey's largest metropolis) via Eskişehir to Ankara (the capital) is under construction and will reduce the travelling time from 6–7 hours to 3 hours 10 minutes. The first phase of this project, the Ankara - Eskişehir line which has a length of 245 km and some 1h 05m of projected travel time. Trials began on April 23, 2007 but revenue earning service has yet to commence. The rest of the project, the Eskişehir - İstanbul line, is scheduled to be completed by 2009; including the Marmaray tunnel (Bosporus undersea railway tunnel) which will establish the first ever railway connection between Europe and Anatolia, and eventually Asia.

High-speed rail lines

File:ETR 500 train sets used for testing the Turkish high speed railway network.jpg
Two ETR 500 train sets have been used for testing the first completed part of the Turkish high speed railway network on April 23, 2007

The construction of the Ankara - Konya line (300km) began in 2006. A travel time of 70 minutes is projected for this track, which will also be connected with the Ankara - Eskişehir line in Polatlı.

Other projected high speed rail lines include:

High-speed train sets

File:TUVASAS-ROTEM HSR-350X.jpg
Inauguration ceremony of the EUROTEM (TÜVASAŞ-ROTEM) factory in Adapazarı, Turkey, which will licence build the HSR-350x trains that can reach a maximum speed of 352.4 km/h
File:TCDD Hızlı Tren.png
An HT65000 train set, purchased from CAF of Spain

The commercial high speed trains are expected to reach top speeds of 250-300 km/h (150-200 mph) on these tracks.

The first ten TCDD HT65000 high-speed train sets were purchased from CAF of Spain, and have a maximum speed of 250 km/h. In addition, two ETR 500 train sets, which can reach a top speed of 300 km/h, have been rented from Italy and were used for testing the first completed part of the high speed railway network, between Eskişehir and Ankara, on April 23, 2007.[1]

For further sets to be used on new planned tracks and the current ones under construction, a joint enterprise (EUROTEM) between the South Korean ROTEM and Turkish TÜVASAŞ has been established, and a factory in Adapazarı, Sakarya Province has been constructed to licence build the HSR-350x trains which can reach a maximum speed of 352.4 km/h.