Jump to content

Kiata Wind Farm

Coordinates: 36°24′07″S 141°45′07″E / 36.402°S 141.752°E / -36.402; 141.752
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by BrownHairedGirl (talk | contribs) at 10:58, 13 October 2019 (replace links to deleted portals: Portal:VictoriaPortal:Australia). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Kiata Wind Farm
Map
CountryAustralia
LocationKiata, Victoria
Coordinates36°24′07″S 141°45′07″E / 36.402°S 141.752°E / -36.402; 141.752
StatusOperational
Construction beganMarch 2017 (2017-03)[1]
Commission dateJanuary 2018 (2018-01)[2]
Construction cost$75,000,000[3]
Owner(s)Windlab and John Laing Group[3]
Operator(s)Windlab
Wind farm
TypeOnshore
Hub height117 m (384 ft)
Rotor diameter126 m (413 ft)
Rated wind speed57 km/h (15.8 m/s)
Site elevation400 m (1,312 ft)
Power generation
Units operational9
Make and modelVestas: V126[3]
Nameplate capacity31.5 MW[3]
Annual net output0 GWh
External links
Websitewww.kiatawindfarm.com.au

Kiata Wind Farm is a small wind farm located along the Western Highway north of Nhill.[1] The wind farm is owned by Windlab, the John Laing Group and some local shareholders.[3] The turbines were built by Keppel Prince and assembled at the site by Windlab.[3] It was "officially opened" by Lily D'Ambrosio on Australia Day 2018.[2] According to Kiata Wind Farm director Rob Fisher, the Kiata turbines "are the biggest turbines operating in Australia to date."[2] The ABC reported that some of the local landholders would become part owners "via a community investment model."[4]

See also

References

  1. ^ a b "Kiata Wind Farm Begins Construction". kiatawindfarm.com.au. Kiata Wind Farm. 21 March 2017. Retrieved 28 June 2018.
  2. ^ a b c Oliver, Daina (25 January 2018). "New Kiata wind farm is powering ahead". Wimmera Mail Times. Horsham. Retrieved 28 June 2018.
  3. ^ a b c d e f "Kiata Wind Farm". windlab.com. Wind Lab. 2018. Retrieved 28 June 2018.
  4. ^ Lamacraft, Tim (28 March 2016). "Kiata wind farm investment option to be offered to nearby landholders". ABC. Horsham. Retrieved 28 June 2018.