Jump to content

Daxing line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Tree-and-tree (talk | contribs) at 07:38, 13 October 2018 (→‎History). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Daxing line
 Daxing 
Beijing MTR
Overview
Other name(s)M4 South / S4 (planned name)
Line 4 South
StatusOperational
LocaleFengtai and Daxing districts
Beijing
Termini
Stations11
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing MTR Corporation Limited
Depot(s)Nanzhaolu
Daily ridership310,000 (2014 Avg. Daxing Line only)[1]
376,000 (2014 Peak Daxing Line only)[a][2]
History
Opened30 December 2010
Technical
Line length21.7 km (13.5 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed100 km/h (maximum service speed)
Route map

Gongyi Xiqiao
above is line 4
Xingong
Xihongmen
Gaomidianbei
Xinfeng river
Gaomidiannan
Zaoyuan
Qingyuan Lu
Huangcun Xidajie
Huangcun Railway Station (subway)
Huangcun railway station (China Railway)
Jinghu,
Jingjiu railways etc.
Beijingdaxing
Xiaolong river
Yihezhuang
Tiantang river
Biomedical Base
Tiangongyuan
Nanzhaolu depot

The Daxing Line of the Beijing Subway (simplified Chinese: 北京地铁大兴线; traditional Chinese: 北京地鐵大興線; pinyin: Běijīng Dìtiě Dàxīng Xiàn) is a rapid transit line that connects the southern Daxing District of the city with the subway network. It extends Line 4 south from its southern terminus at Gongyixiqiao, on the 4th Ring Road in Fengtai District, to Nanzhao Lu, beyond the 6th Ring Road in Daxing District. The Daxing Line is about 21.7 km (13.5 mi) in length with 18 km (11 mi) underground.[3][4] Daxing line contains 12 stations and is about 21.7 km (13.5 mi). Intitally Daxing line decided to have 4 ground stations. However, due to a lack of space, only Xihongmen is above the surface.[5] Full-scale construction began in 2007 and the line was opened on December 30, 2010, 14:00 local time.[6]

Route & Service

Though the Daxing Line is classified as a distinct line,[7] the Beijing MTR Corporation Limited operates through-train service on Lines 4 and Daxing, making the two lines effectively one line for travelers.[b] With the opening of the Daxing Line on December 30, 2010, the Beijing MTR Corporation Limited now runs two types of train service on the combined Line 4-Daxing Line route:

  • A full-route loop that covers the entire Line 4 and Daxing Lines. This train service runs from Anheqiao North, the northern terminus of Line 4, to Tiangongyuan, the southern terminus of the Daxing Line.
  • A partial-route loop that covers the entire Line 4 route plus one stop on the Daxing Line. This service runs from Anheqiao North to Xingong, the northernmost stop on the newly opened Daxing Line. Travelers wishing to proceed further south on the Daxing Line would have to switch to a south-bound full-route service train.

Service routes

Stations

Daxing Line and Line 4 stations, from north to south (with transfer points):

Service
routes
Station Name Connections Nearby Bus Stops Distance
km
Location
English Chinese
Template:BJS stations 安河桥北 437 575 专28 see
Line 4
Haidian
Template:BJS stations 北宫门 303 331 332 346 384 394 563 584 594 601 观光3 夜8
Template:BJS stations 西苑  16  303 331 332 333 346 384 393 394 432 437 438 476 498 508 534 563 579 584 594 601 610 636 671 特19 夜8 运通106 运通108 运通114 运通118
Template:BJS stations 圆明园 331 432 438 498 508 579 594 601 664 观光3 特19 运通124
Template:BJS stations 北京大学东门 307 320 331 355 365 375 438 498 549 579 594 601 614 681 982 观光3 特4 特19 运通105 运通110 运通126
Template:BJS stations 中关村 26 302 307 320 332 355 365 384 392 466 498 549 579 584 601 614 681740 982 983 特4 特9 夜8 运通105 运通106 运通110 运通113
Template:BJS stations 海淀黄庄  10  302 304 307 320 332 355 365 386 584 611 614 630 634 653 671 681 特4 特15 夜8 夜9 运通105 运通106 运通109
Template:BJS stations 人民大学 26 79 300 300快 302 320 323 332 355 361 365 425 549 584 614 651 653 658 660 695 特4 特8 特15 夜8 夜30 运通101 运通105 运通106 运通201
Template:BJS stations 魏公村 26 320 332 563 645 651 653 658 660 695 特4 特15 夜8 运通103 运通105 运通106
Template:BJS stations 国家图书馆  9  86 92 320 332 481 563 653 658 695 特4 特19 夜8 运通105 运通106
Template:BJS stations 动物园 7 15 16 19 27 45 65 87 102 103 105 107 111 332 334 347 360 360快 362 534 563 632 695 特4 特19 夜8 运通104 运通105 运通106
Template:BJS stations 西直门  2   13  Beijing North railway station VAP 7 16 21 26 27 44 80 87 105 111 332 347 360 362 375 387 438 534 563 618 632 651 691 693 694 特12 特15 夜8 夜14 夜20 夜21 运通104 运通105 运通106 专6 Xicheng
Template:BJS stations 新街口 7 47 105 111 508 夜36
Template:BJS stations 平安里  6  3 13 22 38 42 88 105 107 111 118 332 409 701 特13 夜3 夜4 夜10 夜21
Template:BJS stations 西四 3 13 22 38 42 88 101 102 103 105 109 124 332 409 612 特13 夜4 夜10 夜13
Template:BJS stations 灵境胡同 22 38 46 68 88 102 105 109 特13 夜4 夜10
Template:BJS stations 西单  1  1 15 22 52 70 83 88 102 105 109 332 特13 夜1 夜4 夜10
Template:BJS stations 宣武门  2  7 9 15 22 44 67 70 83 102 105 109 332 特2 特4 特7 特13 特14 夜4 夜5 夜10
Template:BJS stations 菜市口  7  5 6 48 57 70 83 102 105 109 381 特14 夜4 夜7 夜10 夜18 专13
Template:BJS stations 陶然亭 40 59 83 133 381 特14 夜4 夜18 夜23 专13
Beijing South Railway Station 北京南站  14  Beijing South railway station VNP 20 102 106 133 343 381 458 485 529 652 665 特17 夜15 夜17 夜24 Fengtai
Template:BJS stations 马家堡 51 66 72 485 501 529 998 特14 夜18 运通103 运通125
Template:BJS stations 角门西  10  51 72 474 501 529 556 646 998 特14 夜18 运通125 专26
style = "background:#Template:BJS color; height: 2pt" colspan = "6" |
Template:BJS stations 公益西桥 377 474 511 556 646 825 990 运通125 运通129 专26 0.00 0.00
Template:BJS stations 新宫 343 353 369 474 556 827 829 954 运通115 运通129 专59 专67 2.82 2.82
Template:BJS stations 西红门 381 454 470 474 483 646 829 993 专84 专97 专169 5.05 7.87 Daxing
Template:BJS stations 高米店北 631 1.76 9.63
Template:BJS stations 高米店南 937 专24 1.17 10.80
Template:BJS stations 枣园 410 631快 829 841 842 844 937 940 954 968 1.11 11.91
Template:BJS stations 清源路 456 631 631快 829 841 940 947 954 968 969 专23 1.19 13.10
Template:BJS stations 黄村西大街 456 631 631快 829 840 940 947 954 968 1.24 14.34
Huangcun Railway Station 黄村火车站 Huangcun railway station HCP 366 366快 369 631 631快 827 829 840 947 957 968 969 0.97 15.31
Template:BJS stations 义和庄 456 1.80 17.11
Template:BJS stations 生物医药基地 456 827 842 2.93 20.04
Template:BJS stations 天宫院 456 827 829 842 1.81 21.85

History

  • June 1, 2008: Construction began on Daxing Line. Completion set for the end of 2011.[8]
  • November 16, 2008: Completion date moved up to December 28, 2010.[9]
  • April 20, 2010: Completion date moved again to October 28, 2010.[6]
  • December 28, 2010: Daxing Line opened.
Segment Commencement Length Station(s) Name
Gongyixiqiao — Tiangongyuan 30 December 2010 21.7 km (13.48 mi) 11 (initial phase)
Anheqiao North — Gongyixiqiao 28 September 2009 see Line 4 (through services)

Notes

a. ^ Line 4 ridership included.
b. ^ See 北京京港地铁有限公司 (in Simplified Chinese). Beijing MTR Corporation Limited. 2010-12-29. Archived from the original on 2011-01-01. Retrieved 2011-01-05. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help) & "Beijing MTR Corporation Limited". Mtr.bj.cn. 2010-09-27. Archived from the original on 2011-10-09. Retrieved 2011-01-05. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help) (English)

  1. ^ 我市轨道交通网络化运营效果凸显. Beijing Municipal Transportation Committee (北京市交通委员会). 2012-09-17. Archived from the original on 2014-09-03. Retrieved 2013-09-15. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help); templatestyles stripmarker in |publisher= at position 45 (help)
  2. ^ Liu Mian (刘冕). 地铁日客流突破1100万人次. Archived from the original on 2013-07-18. Retrieved 2013-07-15. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  3. ^ 地铁大兴线01号标段(义和庄站)开工建设 (in Simplified Chinese). Daxing News. December 21, 2007.
  4. ^ 地铁大兴线各站年底全封顶. Beijing Times (in Simplified Chinese). October 8, 2009.
  5. ^ 北京地铁大兴线6月1日开工 计划2011年底通车 (in Simplified Chinese). Beijing Evening News. May 15, 2008.
  6. ^ a b (Chinese) [1] Apr. 20, 2010
  7. ^ 北京地铁4号线今年年底将与大兴线贯通运营. news.china.com.cn (in Simplified Chinese). 23 May 2010. Retrieved 4 July 2010.
  8. ^ 北京地铁大兴线将开工 将建6个公交枢纽 (in Simplified Chinese). Beijing Morning News. June 1, 2008.
  9. ^ 北京地铁大兴线义和庄车站开始盾构施工 (in Simplified Chinese). Xinhua News. November 16, 2008.