Harbin–Qiqihar intercity railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by DePiep (talk | contribs) at 17:26, 20 April 2016 (Template:Infobox rail line: fix bad parameters, use alt parameters (via AWB script)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Harbin–Qiqihar

Intercity Railway

哈齐客运专线
Overview
StatusUnder Construction
LocaleHarbin, Qiqihar
Termini
Stations9
Service
Services1
Operator(s)China Railway High-speed
Technical
Line length281.5 km (175 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (155 mph)

Template:BS-map Harbin–Qiqihar Intercity Railway, also known as Ha Qi Passenger Dedicated Line, is a high-speed railway located with in Heilongjiang province, China. It will connect the provincial capital Harbin and the second largest city in the province of Qiqihar. Total length of the railway is 286 km with a design speed 250–300 km/h. It will travel from Harbin, via Suihua and Daqing, to Qiqihar. On July 5, 2009 construction started and it is expected for construction to be completed by the end of 2014, to be opened to revenue traffic in 2015.[1] This line opened on August 17, 2015.[2]

Overview

Harbin–Qiqihar Intercity Railway will feature 281.5 kilometers of new trackage, costing an estimated 35.5 billion yuan. It will be built as a passenger dedicated line, double-tracked electrified railway with a design speed of 250 km/h, but with allowances for a future speed of 300 km/h. Initial planning allows for 97 pairs of trains per day, transporting about 2,172,000 annually. Into the future with long-term planning predictions are for 129 pairs of trains daily, carrying 2,904,000 passengers each year.[3] The rail line uses slab track, bridge or embankments for about 50% of the railway's length. After completion, it will take small groups with high-density runs. In the future, services will traverse the Harbin-Dalian High-Speed Railway and the under construction Harbin-Mudanjing & Harbin-Jiamusi Intercity Railways providing for a fast rail link across the province.

Harbin–Qiqihar Intercity Railway runs through Hadaqi Industrial Corridor, when completed, it is hoped to help revitalize the north-eastern old industrial base, which has become rundown and outdated in recent years.

Route

Since the beginning of the railway at Harbin Railway Station it will progress, with the existing conventional lines to the right, along the Songhua River. After crossing on the new Harbin to Qiqihar Railway Passenger Dedicated Line Songhua River Bridge to Harbin North Railway Station, following along to the right side of the existing conventioanl railway lines in the urban areas, progressing north then north-west through Hulan District before entering Zhaodong.[4] Afterwards it continues north-west to Anda, Daqing and finally to the Qiqihar.

Stations

Harbin, Harbin North, Zhaodong, Anda, Daqing East, Daqing West, Taikang, Hongqiying East(overtaking station) and Qiqihar South

History

Planning Phase

  • March 7, 2006 - Ministry of Railways and the Heilongjiang Provincial Government signed the "High-speed railway construction in Heilongjiang province summary of the talks", determining that the "Eleventh Five-Year Plan" will see the construction of a Harbin to Qiqihar Intercity Railway.[5]
  • October 2007 - Tenders called for the design, financing and other prelimary activities.[6]
  • March 2008 - Ha Qi Passenger Dedicated Railway Project Expert Group meet in Daqing.[7]
  • April 2008 - A third of the preliminary work has been completed and the Ministry of Railways releases a summary of the talks on the Ha Qi Passenger Line .[8]
  • October 2008 - Ha Qi Passenger Dedicated Railway Project Expert Group conduct Qiqihar City and Zhaodong research.
  • November 2008 - Land survey began.[9]
  • November 2008 - Demolition work began.[4]
  • July 2009 - Ha Qi Passenger Dedicated feasibility study report has been formally approved by NDRC.

Construction Phase

  • July 5, 2009, officially started construction.

Opening

  • August 17, 2015, entered into operation.

Controversy

Original plans called for the demolition of nearly century-old Ji Hongqiao, causing Harbin conservation experts and the public to bring attention to the issue, with some people and experts recommending design changes, related to heritage protection.[10]

The original design of the project planned to demolish and rebuild the century-old railway bridge at Binzhou, through the joint efforts of conservation workers and volunteers, they eventually changed the original design, retaining the old bridge and a new railway bridge for the Harbin–Qiqihar Intercity Railway.[11][12]

References

  1. ^ 哈齐客专:2014年底开通 冰城至鹤城只需一个半小时
  2. ^ 哈齐高铁客专开通 “长客造”向北飞驰再创纪录
  3. ^ "2012年年底乘火车哈尔滨至大庆只需40分钟". Retrieved 2010-11-22.
  4. ^ a b 昨日哈齊鐵路客運專線征地拆遷工作啟動
  5. ^ 黑龙江与铁道部签署加快十一五铁路建设的会谈纪要
  6. ^ 哈大齐工业走廊铁路工程前期工作现已启动
  7. ^ 哈大齐城际铁路项目专家组来我市调研 大庆市政府
  8. ^ 哈齐客运专线 力争下半年开建全长约285公里 黑龙江省人民政府
  9. ^ 哈齐铁路专线开始勘测路标
  10. ^ 东北网:霁虹桥是否应该拆?
  11. ^ 哈报新闻网:百岁滨洲桥将卸载变身景观桥
  12. ^ 大话哈尔滨:永远的滨洲铁路桥