Melbourne Star

Coordinates: 37°48′40″S 144°56′13″E / 37.8110723°S 144.9368763°E / -37.8110723; 144.9368763
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by JJMC89 bot (talk | contribs) at 09:48, 21 November 2016 (Migrate {{Infobox building}} coordinates parameters to {{Coord}}, see Help:Coordinates in infoboxes). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Melbourne Star
Melbourne Star in December 2013
Map
Former namesSouthern Star[1]
General information
StatusOperational
TypeFerris wheel
LocationMelbourne Docklands, Australia
Coordinates37°48′40″S 144°56′13″E / 37.8110723°S 144.9368763°E / -37.8110723; 144.9368763
Construction started30 June 2006[2]
OpenedOriginal wheel: 20 December 2008[3]
Replacement wheel: 23 December 2013[4]
CostA$100 million (estimate)[5]
OwnerSanoyas Rides Australia Pty. Ltd.[6]
Height120 m (394 ft)[3]
Design and construction
Architect(s)Sanoyas[7]
Main contractorHansen Yuncken[8]

The Melbourne Star (previously Southern Star) is a giant Ferris wheel in the Waterfront City precinct in the Docklands area of Melbourne, the state capital of Victoria, Australia.

Described by its operators as "the Southern Hemisphere's only giant observation wheel",[9] it is 120 m (394 ft) tall and has seven spokes, reflecting the seven-pointed star of the Australian flag.[10]

It opened two years behind schedule in December 2008, but closed 40 days later due to structural defects, and was subsequently dismantled for major repairs. The wheel itself was scrapped and replaced, but the original support structure and passenger cabins were retained. It was originally thought that reconstruction might be completed in late 2010, but repeated delays meant it did not reopen until 23 December 2013.

A ride (one complete rotation) takes 30 minutes and, according to the Star's website, provides uninterrupted 360-degree views of up to 40 kilometres (25 mi) "encompassing the Docklands precinct, Melbourne’s CBD, Port Phillip Bay and as far as Mount Macedon, Arthur’s Seat and the Dandenong Ranges."[11]

2006-2009

Construction

The project was undertaken by ING Real Estate and the construction consultant was Hansen Yuncken. The wheel was designed and built by Sanoyas Rides Corporation, a wholly owned subsidiary of the Japanese ship and amusement park ride builder Sanoyas Holdings Corporation, and the steel builder was Alfasi Steel Constructions.[7][12]

Construction began in 2006.[7] By 1 March 2008 the outer rim had been completed,[13] and by 21 October air-conditioned enclosed passenger cabins, built in Osaka, Japan,[2] were receiving their fit out.[5] Each cabin weighs 13 tonnes, is 5.7 m (19 ft) long and 3.7 m (12 ft) high, has floor to ceiling glass walls, and can accommodate up to 20 passengers.[14][15]

Opening

Southern Star prior to its 2009 closure
Failed joint from the 2009 wheel

The wheel first opened to the public on 20 December 2008,[3] two years behind schedule.[16] Its most recently postponed opening ceremony, scheduled for 28 November 2008,[17] had been cancelled due to bad weather and delays in procuring parts.[3] It had cost an estimated A$100 million to construct and was expected to attract more than one million visitors annually. Tickets cost $29 for adults and $17 for children.[5]

Closure

On 30 January 2009,[18] 40 days after opening,[19] the wheel was shut down by WorkSafe after cracks up to three metres (9.8 ft) long were inadvertently discovered by a contract worker installing LED lighting. One node was almost completely torn from its welded joint.[20] Initially the operators blamed the 2009 Southeastern Australia heat wave for causing the damage and it was not known when the wheel would reopen.[18]

Upon further investigation, engineers working on the wheel discovered the cracks were not caused by the heatwave but rather a problem in the original design. Fourteen cracks were found in the steel.[21]

An undated press release on the operator's official website stated: "The Southern Star Observation Wheel was temporarily closed in January 2009. As a result of extensive design and technical reviews a conclusion was reached to build a new wheel."[1]

Sanoyas, who designed and built the wheel, accepted responsibility for the cracks and undertook its reconstruction under warranty. Consulting engineers Arup, steel builder Alfasi, and construction consultant Hansen Yuncken signed confidentiality agreements preventing them from commenting publicly. Most of the original wheel was sold for scrap, but the main support columns and the passenger cabins were retained and reused.[12]

The reconstruction process began in a factory in South Dandenong in December 2009, at which time it was expected that a year would pass before the wheel would reopen.[12]

2010

In October it was reported that the viability of the wheel was in doubt after contractors stopped work because they had not been paid, although a spokeswoman for Southern Star Management Group denied this, stating that "the construction process is extremely intricate and highly influenced by adverse weather conditions, including rain, wind, [and] hot and cold weather[.]"[22]

2011

In January the first of the seven replacement spokes, manufactured by BMC in the Latrobe Valley, was delivered to Docklands.[23] In July the wheel was expected to be turning again by the end of the year.[24]

On 28 November reconstruction work was in progress when the wheel broke free from its restraints and began turning in strong winds, resulting in minor injuries for one of the workers as they fled the site. The next day, Southern Star Management issued a statement saying that bracing used to erect the wheel had failed, and that no final completion date for the wheel had yet been confirmed.[25][26] In December it was reported that the wheel was not expected to reopen before Easter 2012.[27]

2012

In January it was reported that an international team of experts including Arup (who were involved in both the London Eye and the Singapore Flyer projects) and Hyder Consulting had been engaged in the redesign, and that reconstruction was now expected to be completed before the end of the year.[28][29] In June it was reported that the then owner ING Real Estate had repeatedly refused to announce an estimated completion date, but that an estimated date might be given at a briefing of state government officials planned for July.[19]

In August it was reported that the wheel could reopen in January 2013, but only if there was "no wind, no rain for the next four months" - an unlikely scenario for Melbourne, "a city renowned for extremely windy springs and rain that washes out the first cricket matches". According to spokesman Ken Davis, 70 per cent of available construction time was being lost each week as cranes and lifts on the site could not operate in bad weather. He also stated that "due to the complexity of the construction process, we are not in a position to make any announcements regarding a 2013 opening date".[30] However, later that same month, after the final section of the rim was installed, he stated "we're hoping it will be completed by the middle of next year".[31]

2013

In January, ING Real Estate advised that the wheel would not reopen until the second half of the year,[32] and on 27 April it was renamed as the Melbourne Star. On 25 August the opening was put back yet again, to March 2014.[33] Three days later the first of the original cabins, which had been in storage since the original wheel was dismantled, was reinstalled. This took up to three-quarters of a day each, depending on weather conditions. The only substantial modification was an upgrade of their audio systems.[14]

The first cars being reattached during the restoration in August 2013

On 11 October it was announced that Sanoyas had purchased the wheel from ING Real Estate for an undisclosed price, and that Melbourne Star Management Group would continue to manage it.[7][34] On 25 October, Sanoyas Holdings Corporation president Takashi Ueda announced that the company was aiming to reopen the attraction in ten weeks time. Advertisements for approximately 100 jobs began appearing on the Melbourne Star website and on the 'SEEK' recruiting website.[35]

Reopening

Original passenger cabins fitted to the new wheel

On 6 December 2013 it was reported that construction work had been completed,[36] and an announcement on the Star's website stated that the reopening would be in late December. Melbourne Star Management Group CEO Chris Kelly was quoted as saying "We are working to the earliest possible opening date. We are now well into the commissioning process, which is the final stage before opening, but some activities do remain weather dependent."[11]

On 15 December a promotional television advertising campaign commenced, and three days later it was announced that "The Melbourne Star Observation Wheel will open for guests at 12 noon on Monday, December 23, 2013"[37] - almost five years after the original wheel was shut down in January 2009.[38]

On the evening of 26 December, three days after the reopening, the wheel was stopped for several minutes while a cabin was inspected and taken out of service after passenger Marco Bresciani discovered a cracked window. CEO Chris Kelly described the damage as a "very minor cosmetic issue" caused by a bird strike. "The glass has been inspected and our advice is that it is cosmetic and doesn't present any safety issues. It is in the process of being repaired."[39]

On the afternoon of 28 December the wheel was evacuated to allow a "full inspection" after the wheel unexpectedly stopped rotating. It was restarted 15 minutes later. Spokeswoman Sally Abbott said technicians had identified an "isolated incident" but refused to provide any details.[40]

The Victorian Workcover Authority subsequently investigated safety complaints by several visitors.[41] Two families were reported to have been traumatised and left "shaking and in tears" after cabin eight became stuck and began tilting as the wheel turned. The operators confirmed that an alarm was triggered on both occasions but refused to say what triggered it, whether the two incidents were connected, if the same cabin was involved, if cabin eight remained in service, or whether it had been serviced between the two incidents. CEO Chris Kelly said the wheel remained open and safe for tourists even though one of the cabins had been taken out of service, and insisted that the cabin "did not tilt or rock at any stage". He refused to answer questions about the mechanics of the wheel or the cabins, or to confirm that the same cabin was involved in both incidents, saying: "It is not our policy to comment on the specifics due to the highly complex engineering and electrical systems that operate the Star" and "It is not our policy to divulge this information as we don't want people to needlessly avoid specific cabins in the future."[41][42][43]

2014

On 24 January the Star was again unexpectedly closed. Visitors arriving at the wheel were told the closure was due to "windy conditions", however a spokeswoman said "operations have been temporarily suspended due to a software problem. Our technical services team are undertaking a comprehensive investigation to identify and correct the issue and we are expecting to resume operations later today."[44] The wheel was closed from 11:00 until the following morning.[45]

References

  1. ^ a b "Melbourne Star Observation Wheel". Only Melbourne. Retrieved 6 December 2013.
  2. ^ a b "Work to spin Ferris wheel". Herald Sun. 30 May 2006. Retrieved 25 October 2013.
  3. ^ a b c d Rennie, Reko (19 December 2008). "After the spin, Melbourne's wheel ready to turn". The Age. Retrieved 19 December 2008.
  4. ^ Minear, Tom (23 December 2013). "Melbourne Star Observation Wheel spins back into action". Herald Sun. Retrieved 23 December 2013.
  5. ^ a b c Royall, Ian; Johnston, Matt (20 October 2008). "Man seeks to propose to girlfriend in new Southern Star wheel". Herald Sun. Retrieved 25 October 2008.
  6. ^ Greetings | Our Company | Sanoyas Rides Australia Pty Ltd
  7. ^ a b c d Stephen Cauchi (11 October 2013). "Melbourne Star bought by its Japanese builder". The Age. Retrieved 1 November 2013.
  8. ^ "The Southern Star". The Southern Star. Retrieved 1 July 2008.
  9. ^ "Melbourne Star". Melbourne Star. Retrieved 31 August 2013.
  10. ^ "Docklands Science". Docklands News. March 2013.
  11. ^ a b "Melbourne Star news". Melbourne Star. Melbourne Star Observation Wheel. 6 December 2013. Retrieved 6 December 2013.
  12. ^ a b c "Year-long wait as scrapped wheel is rebuilt". The Age. 27 December 2009.
  13. ^ Look at me, I'm a big wheel now
  14. ^ a b "Long-delayed milestone for Docklands wheel as first cabin attached". The Age. 28 August 2013. Retrieved 31 August 2013.
  15. ^ "The Southern Star Observation Wheel". The Southern Star. 28 April 2008. Archived from the original on 19 July 2008. Retrieved 13 March 2011. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  16. ^ "Opening Date For Melbourne's Southern Star Wheel (Mark 2) Imminent". DesignBuildSource. 8 March 2013.
  17. ^ Rennie, Reko (27 October 2008). "Melbourne's big wheel to open next month". The Age. Retrieved 27 October 2008.
  18. ^ a b Cooper, Mex (2 February 2009). "Heat Closes Melbourne's Southern Star". The Age. Retrieved 2 February 2009.
  19. ^ a b "$100m Southern Star Observation Wheel a broken wreck". Herald Sun. 13 June 2012.
  20. ^ Houston, Cameron (5 July 2009). "Huge cracks in wheel of misfortune". The Age. Retrieved 7 December 2013.
  21. ^ "Design fault to keep wheel shut". The Age. 2 March 2009. Retrieved 2 March 2009.
  22. ^ Work grinds to halt on Southern Star Observation Wheel
  23. ^ "Observation wheel at a turning point". Herald Sun. 11 January 2011.
  24. ^ "Docklands attraction making wheel progress". Herald Sun. 31 July 2011.
  25. ^ "Union blames Government for Southern Star Observation Wheel accident". Herald Sun. 29 November 2011.
  26. ^ "More trouble for Docklands observation wheel". ABC Online. 29 November 2011. Retrieved 29 November 2011.
  27. ^ "Wheel's safety in doubt: union". The Age. 5 December 2011.
  28. ^ "Melbourne's big wheel of misfortune". Smart Planet. 28 January 2012.
  29. ^ "Melbourne's Southern Star Wheel To Get 'World First LED Lighting System'". Gizmodo. 30 January 2012.
  30. ^ "Wheel's misfortune continues, and traders are not happy". The Age. 8 October 2012.
  31. ^ "Circle complete as Southern Star reinvents the wheel". The Age. 18 October 2012.
  32. ^ "Wheel's reopening at least six months away". The Age. 22 January 2013. Retrieved 9 May 2013.
  33. ^ "Docklands traders in spin over 1800-day wait for Melbourne Star wheel fix". Herald Sun 25 August 2013. Retrieved 26 August 2013.
  34. ^ "Japanese breathe new life into Docklands ferris wheel project". Herald Sun. 11 October 2013. Retrieved 11 October 2013.
  35. ^ "Docklands' trouble-plagued observation wheel set to open in ten weeks". Herald Sun. 25 October 2013. Retrieved 25 October 2013.
  36. ^ "Melbourne Star observation wheel set to reopen soon, pending final tests". ABC News. 6 December 2013.
  37. ^ "Melbourne Star advertisement". Melbourne. 15 December 2013. Event occurs at 2pm & 9.11pm (0.5 minutes). Nine Network & Seven Network. Nine Melbourne and Seven Melbourne. {{cite episode}}: Cite has empty unknown parameters: |began=, |episodelink=, |transcripturl=, |serieslink=, |ended=, and |seriesno= (help); Missing or empty |series= (help)
  38. ^ Masanauskas, John (18 December 2013). "Melbourne's observation wheel opens next week". News. News Ltd. Retrieved 18 December 2013.
  39. ^ Mickelburough, Peter (29 December 2013). "Bird strike cause of crack on Melbourne Star Observation Wheel pod window". Herald Sun. News Ltd. Retrieved 30 December 2013.
  40. ^ Melbourne Star Observation Wheel spins into trouble again
  41. ^ a b WorkSafe to probe Melbourne Star Observation Wheel
  42. ^ Melbourne Star Observation Wheel cabin out of action amid WorkSafe probe
  43. ^ Melbourne Star Observation Wheel pod fails to keep level, says family
  44. ^ Troubled wheel halted again
  45. ^ Melbourne's Docklands observation wheel reopens after software glitch