Jump to content

Walnut Creek station

Coordinates: 37°54′21″N 122°04′02″W / 37.905724°N 122.067332°W / 37.905724; -122.067332
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Brandon5485 (talk | contribs) at 03:09, 8 February 2017 (reorganize bus section). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Walnut Creek
Bay Area Rapid Transit
Parking garage at Walnut Creek station
General information
Location200 Ygnacio Valley Road
Walnut Creek, CA 94596
Owned byBART
Line(s)
Platforms2 side platforms
Tracks2
ConnectionsCounty Connection: 1, 1M, 2, 4, 5, 9, 15, 21, 25, 93X, 95X, 96X, 98X, 301*, 311*, 321*, ACR
FAST: 40
SolTrans: 78
WHEELS: 70X
*Weekends only
Construction
Parking2089 spaces - Monthly Reserved, Daily ($1.50/day), Extended Weekend (free), Midday (free after 3pm), Carpool, Long Term[1]
Bicycle facilities64 lockers
AccessibleYes
History
OpenedMay 21, 1973 (51 years ago)
Passengers
FY 20167,138 exits/day[2]Increase 4.53%
Services
Preceding station   BART   Following station
Template:BART lines

Walnut Creek is an elevated BART station in Walnut Creek, California, on the Pittsburg/Bay Point – SFO/Millbrae line of the Bay Area Rapid Transit (BART) system.

Location

Walnut Creek station is in Walnut Creek, a major suburb in the East Bay area of the San Francisco Bay Area, one of the largest metropolitan areas of the United States. The station itself is at the intersection of three major roads - Ygnacio Valley Road, Hillside Avenue, Riviera Avenue - and an off-ramp from Interstate 680.

Transit-oriented development

Due to Walnut Creek's high ridership and large catchment area, BART has proposed that the station be the center of a 5.3-acre (2.1-ha) transit-oriented development scheme which includes 440 residential units, 8,700 sq ft (810 m2) of office space, 33,000 sq ft (3,100 m2) of retail space, and 1,373 parking spaces.[3]

History

Walnut Creek station opened on 21 May 1973 as part of an extension from MacArthur to Concord.

Ridership

With 7,138 exits each weekday as of 2016, Walnut Creek is the third-busiest in Contra Costa County, surpassed by Pleasant Hill and El Cerrito del Norte stations.[2] In its 2004 comprehensive station plan for Walnut Creek, BART predicted a massive increase in ridership by 2025, estimating that over 18,000 passengers would use the station daily (both entries and exits).

Service

Walnut Creek station is on the Pittsburg/Bay Point – SFO/Millbrae line, the busiest line of the BART system, with trains heading southwest to Oakland, downtown San Francisco, and San Francisco International Airport (SFO) and northeast to Concord and Bay Point. During peak hours trains arrive at frequent intervals of up to 4–6 minutes; during off-peak hours this is reduced to 15-20 minutes.[4] Transfers to the Richmond-Millbrae and Richmond-Fremont lines are available at MacArthur and a transfer to the Dublin/Pleasanton line is available at West Oakland.

Station layout

P
Platform
level
Side platform, doors will open on the right
Southbound Template:BART icon toward San Francisco International Airport weekdays, Millbrae weekends (Lafayette)
Northbound Template:BART icon toward Pittsburg / Bay Point (Pleasant Hill)
Side platform, doors will open on the right
M Mezzanine One-way faregates, ticket machines, station agent
G Street Level Exits/Entrances

Walnut Creek utilizes a simple side platform layout with two tracks. Access to the tracks is provided by a staircase, escalator, and elevator from the mezzanine, which houses nine faregates.[3] Sustained patronage at the station has caused it to become overcrowded; BART is planning on building a second entrance, including new faregates and platform access to relieve possible emergency hazards.[3]

Bus connections

County Connection:

  • Daily service:
    • 4: Broadway Plaza, Downtown Walnut Creek (free) (schedule)
    • ACR: Alamo Creek Shuttle (free, reservations required) (schedule)
  • (Monday-Friday) Weekdays only:
  • (Saturday-Sunday) Weekends only:
    • 301: Rossmoor (westbound) / John Muir Medical Center (eastbound) (schedule)
    • 311: Concord BART via Pleasant Hill BART, Treat Blvd, and Oak Grove Rd (schedule)
    • 321: Bishop Ranch, San Ramon, Danville, Alamo via Danville Blvd (schedule)

Fairfield and Suisun Transit:

SolTrans:

WHEELS:

  • (Monday-Friday) Weekdays only:

See also

References

  1. ^ http://www.bart.gov/stations/wcrk/index.aspx#parking
  2. ^ a b Bay Area Rapid Transit District. "Monthly Ridership Reports". Retrieved 6 February 2017.
  3. ^ a b c Walnut Creek comprehensive station plan BART Retrieved 2009-11-01
  4. ^ Pittsburg/Bay Point-SFO/Millbrae line schedule BART Retrieved 2009-11-01

37°54′21″N 122°04′02″W / 37.905724°N 122.067332°W / 37.905724; -122.067332