eBART
eBART | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | East Contra Costa County BART extension | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Bay Area Rapid Transit District | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | East Contra Costa County | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 3 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | Official website | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Diesel MU light rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Bay Area Rapid Transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Bay Area Rapid Transit District | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Antioch Maintenance Yard | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 8 Stadler GTW | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | May 26, 2018[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 10.1 mi (16.3 km) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Grade separated in highway median | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | No | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 75 mph (121 km/h)[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
eBART (East Contra Costa County BART extension)[3][4] is the project name[5] for a diesel multiple unit (DMU) light rail branch line of the Bay Area Rapid Transit (BART) system in eastern Contra Costa County, California, United States. Service starts at Pittsburg/Bay Point station and extends to Antioch station.
eBART tracks and trains are incompatible with those of the main BART rapid transit system, making it impossible for trains to move between the two systems;[6] instead, passengers transfer via a cross platform interchange at an auxiliary BART stop at Pittsburg/Bay Point – the eBART platform is accessible only via an intra-station ride from the main station to this auxiliary stop. The first extension proceeds 10.1 miles (16.3 kilometres)[2] east along the State Route 4 corridor to the city of Antioch[7] at a Hillcrest Avenue station.
The BART map does not differentiate between this service and the Antioch–SFO line;[8] as such, the color associated with the entire line is yellow.[9][10]
History
This section needs expansion with: Commentary and criticism on decisions to use different gauge and rolling stock, placement in freeway median, and funding of Pittsburg Center station. You can help by adding to it. (January 2018) |
Planning
For further extension into Contra Costa County and to extend the Pittsburg/Bay Point–SFO/Millbrae line, the DMU system was chosen[by whom?] as an alternative to the existing BART infrastructure because it was claimed to be both less expensive to implement[7] and would more easily allow further extensions.[citation needed]
Initial plans had trains utilizing the Union Pacific Railroad right-of-way that runs parallel to State Route 4. After Union Pacific declined to grant trackage rights or allow laying of new tracks, the line was merged with a construction project already in the process of widening the adjacent freeway, by laying tracks in its median.[11] Construction of the Railroad Avenue station in Pittsburg had been uncertain as planning and construction progressed but was fully funded by the city to open with the rest of the extension.[12]
Initial ridership projections for the service were initially estimated at 5600 trips per weekday (supposing an opening date of 2015).[13]
Funding and construction
A sales tax increase was approved by Contra Costa voters in 2004 in order to fund the expansion.[14] The expansion was approved by the BART board in April 2009.[15] Costs were set at $463 million (equivalent to $658 million in 2023), compared to an estimated $1.2 billion (equivalent to $1.7 billion in 2023) for full BART buildout.[7] On October 14, 2010, BART issued a press release announcing that the agency had awarded a $26 million (equivalent to $36.3 million in 2023) contract to West Bay Builders, of Novato, California, "to build the transfer platform and make some of the necessary rail improvements to begin extending the line to a terminus station at Hillcrest Avenue in Antioch."[16]
Construction on the line began in early 2011.[4] Funding for the Pittsburg station was secured in early 2015, and the station opened with the commencement of operations.[12]
Start of service
Revenue service began on May 26, 2018.[1] Within two weeks of opening, the new stations had seen as many as 7,441 customer entrances and exits daily. Correspondingly, ridership and parking levels at Pittsburg–Bay Point station reduced dramatically after being replaced as the terminus of service.[13]
Future
While not fully planned or funded as of 2018[update], expansions of the DMU system could connect eBART service to Oakley, Byron,[11][17] or the Brentwood Transit Center in Brentwood.[18] In 2017, the San Joaquin Regional Rail Commission indicated that eBART could be extended to Tracy, where it would connect with the Altamont Corridor Express and a proposed line.[19]
Stations
All eBART stations are in Contra Costa County.
Station | City | Opened | Other BART lines |
---|---|---|---|
Antioch | Antioch | May 26, 2018 | |
Pittsburg Center | Pittsburg | ||
Pittsburg / Bay Point | December 7, 1996 |
Rolling stock
Trains servicing the line include eight Stadler GTW coupled pairs. The first were delivered in June 2016,[2] and the agency has two options to procure six more sets.[20] The Stadler GTW trains are diesel multiple units with 2/6 articulated power units, and are based on models previously used in Austin (Capital MetroRail), Denton (A-train), and New Jersey (River Line).[6][21]
See also
References
- ^ a b "East Contra Costa BART Extension (eBART)". BART. Retrieved April 25, 2018.
- ^ a b c COETSEE, ROWENA (June 30, 2017). "Local pols get sneak peek at eBART train". The Mercury News. Retrieved November 25, 2016.
- ^ Roth, Rob. "BART unveils diesel-powered eBART Antioch extension". KTVU. Retrieved October 18, 2016.
- ^ a b "East Contra Costa BART Extension (eBART)". Bay Area Rapid Transit (BART). April 3, 2013. Retrieved August 12, 2015.
- ^ "East Contra Costa BART Extension FAQ | bart.gov". bart.gov. BART. Retrieved May 31, 2018.
- ^ a b "Stadler awarded eBART train contract". Railway Gazette. DVV Media UK. April 28, 2014. Retrieved November 18, 2015.
- ^ a b c Padilla, Dave (September 18, 2012). "BART Official Says eBART Rail Project Set To Open In 2016". KCBS SF Bay Area. Retrieved May 27, 2016.
- ^ "Station List". BART. BART.
- ^ "BART SCOA Final Report June 2013" (PDF). BART.gov. BART. Retrieved May 28, 2017.
- ^ BART staff. BART http://www.bart.gov/about/projects/ecc. Retrieved May 31, 2018.
{{cite web}}
: Missing or empty|title=
(help) - ^ a b Szymanski, Kyle. "eBART extension to Brentwood still a distant idea". The Press. Brentwood, California: Brentwood Press & Publishing. Retrieved May 27, 2016.
- ^ a b Gartrell, Nate (January 22, 2015). "Pittsburg secures last piece of funding for eBART, expect new station in 2018". Contra Costa Times. Digital First Media. Retrieved November 18, 2015.
- ^ a b Brekke, Dan (June 1, 2018). "BART's New Antioch Station Is Very Popular -- and Doesn't Have Enough Parking". KQED. Retrieved June 2, 2018.
- ^ Guevarra, Ericka Cruz (November 12, 2015). "Officials to Celebrate BART's Eastward Expansion in Contra Costa County". KQED. Retrieved May 27, 2016.
- ^ "BART moves forward with $1 billion in extension projects". Bay Area Rapid Transit (BART). April 27, 2009. Retrieved July 15, 2014.
- ^ "BART Board approves contract on Eastern Contra Costa County extension". Bay Area Rapid Transit (BART). October 14, 2010. Retrieved July 15, 2014.
- ^ CDM Smith. "eBART Next Segment Study" (pdf). Bay Area Rapid Transit (BART). Retrieved January 19, 2016.
- ^ "BART: Board vote brings commuter rail closer to Brentwood". The Mercury News. May 12, 2017. Retrieved May 15, 2017.
- ^ "Altamont DMU Study: March 2017" (PDF). San Joaquin Regional Rail Commission. March 8, 2017. p. 3.
- ^ "East Contra Costa BART Extension (eBART) Implementation". Bay Area Rapid Transit (BART). May 19, 2015. Retrieved August 9, 2015.
- ^ "Stadler Rail delivers trains to Oakland". Stadler Rail. April 26, 2014. Archived from the original on March 4, 2016. Retrieved August 9, 2015.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help)
External links
"Contra Costa County, California" is an invalid category parameter for Template:Coord missing.
The problem is usually caused either by a spelling mistake or by an-over-precise category.
For a full list of categories, see Category:Unclassified articles missing geocoordinate data and its subcategories.
- Contra Costa County, California articles missing geocoordinate data
- Bay Area Rapid Transit
- Antioch, California
- Bay Point, California
- Brentwood, California
- California railroads
- Light rail in California
- Pittsburg, California
- Public transportation in the San Francisco Bay Area
- Railway lines in highway medians
- Railway lines opened in 2018
- Standard gauge railways in the United States
- Transportation in Contra Costa County, California