Southern Ontario Railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by KReiss (talk | contribs) at 02:20, 11 September 2014 (Added SOR Hagersville Subdivision template). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Southern Ontario Railway
Southern Ontario Railway #2211 in RailAmerica paint at London, ON in May 2011.
Overview
HeadquartersHamilton, Ontario
Reporting markSOR
LocaleSouthern Ontario
Dates of operation1998–Present
PredecessorCanadian National Railway
Technical
Length69 miles (111 km)
Other
WebsiteOfficial website
Southern Ontario Railway
Hagersville Subdivision
CN Brantford
35.1
Simpson
33.5
ECP Spur
31.5
Blastech Spur
31.0
Rembos Spur
27.3
Onondaga
Wesont Lumber Spur
18.7
Caledonia
Nestle Purina Spur
13.0
CGC spur
9.0
Hagersville
old CN CASO Sub
4.7
Garnet
4.4
old CN Cayuga Sub
0.0
Nanticoke
Lake Erie Works Spur
3.17-mile (5.10 km) Hydro Spur
SOR Logo Pre-Genesee & Wyoming Purchase
Logo Pre-G&W

The Southern Ontario Railway (reporting mark SOR) is a shortline railroad in the province of Ontario, owned and operated by Genesee & Wyoming Canada Inc., the Canadian subsidiary of Genesee & Wyoming Inc.. It operates 69 miles (111 km) of track from Brantford to Nanticoke, Ontario.[1] The railroad began operations in 1998, and was acquired by RailAmerica two years later.[2] It has interchanges with the Canadian National Railway at Hamilton via trackage rights, Brantford and Paris, and interchanges with the Canadian Pacific Railway at Hamilton.[1]

On July 23, 2012, Genesee & Wyoming Inc. announced that it intended to purchase RailAmerica in a deal valued at $1.39 billion.[3][4] Approval of the purchase was granted by the U.S. Surface Transportation Board on December 19, 2012.[5]

The railroad's traffic comes mainly from steel, agricultural products, petroleum products, and chemicals. The SOR carries more than 44,000 carloads a year.[1]

Hagersville Subdivision

The SOR Hagersville Subdivision extends from Nanticoke (Mile 0.0) to Simpson (Mile 35.0). Rail movements on this subdivision are governed by the Occupancy Control System of the Canadian Rail Operating Rules (CROR) and supervised by a rail traffic controller in North Bay, Ontario. The maximum authorized speed on this line is 30 miles per hour (48 km/h). Two or more trains operate daily on the Subdivision. The Hydro Spur (Mile 0.0) extends south off of the Hagersville Subdivision and descends southward to Lake Erie at a 1% grade. An Imperial Oil refinery is located just south and east of Mile 0.0 and an Ontario Hydro facility is located at the southern extremity of the spur (Mile 3.17). Train movements on the spur are governed by CROR Rule 105 and have a maximum authorized speed of 10 mph.[6]

References

  1. ^ a b c "Southern Ontario Railway". Genesee & Wyoming Canada Inc. 2014-08-04. Retrieved 2014-09-10.
  2. ^ "RailAmerica's Empire". Trains Magazine. Kalmbach Publishing. June 2010.
  3. ^ Associated Press (July 23, 2012). "Genesee & Wyoming to pay $1.39B for RailAmerica". STL Today.com. Retrieved July 23, 2012.
  4. ^ "UPDATE 4-Genesee & Wyoming to buy RailAmerica for $1.4 billion". Reuters. July 23, 2012. Retrieved July 23, 2012.
  5. ^ Surface Transportation Board, Decision, Case No. 42772, December 19, 2012
  6. ^ "RAILWAY INVESTIGATION REPORT R09T0057" (PDF). The Transportation Safety Board of Canada (TSB). 2010-08-04. Retrieved 2014-09-10. {{cite web}}: line feed character in |title= at position 30 (help)

External links

Media related to Southern Ontario Railway at Wikimedia Commons