GE Hitachi Nuclear Energy: Difference between revisions
No edit summary Tags: Mobile edit Mobile app edit |
Sehlangford (talk | contribs) mNo edit summary |
||
(74 intermediate revisions by 35 users not shown) | |||
Line 1: | Line 1: | ||
{{short description|American nuclear technology company}} |
|||
{{refimprove|date=March 2011}} |
|||
{{Infobox company |
{{Infobox company |
||
| name |
| name = GE Hitachi Nuclear Energy |
||
| logo |
| logo = GE Hitachi.svg |
||
| type |
| type = [[Joint venture]] |
||
| foundation |
| foundation = {{Start date and age|2007|06}} |
||
| location |
| location = [[Wilmington, North Carolina]], US |
||
| area_served |
| area_served = Worldwide |
||
| key_people |
| key_people = Jay Wileman ([[President (corporate title)|president]] & [[Chief Executive Officer|CEO]]) |
||
| industry |
| industry = [[Nuclear power]] |
||
| products |
| products = |
||
| services |
| services = |
||
| revenue |
| revenue = |
||
| operating_income = |
| operating_income = |
||
| net_income |
| net_income = |
||
| aum = |
|||
| |
| assets = |
||
| |
| equity = |
||
| owner = {{ubl|[[GE Vernova]]|[[Hitachi]]}} |
|||
| equity = |
|||
⚫ | |||
| owner = |
|||
| parent = |
|||
⚫ | |||
| divisions = |
|||
| parent = [[General Electric]]<br />[[Hitachi]] |
|||
| |
| subsid = |
||
⚫ | |||
| subsid = |
|||
| footnotes = |
|||
⚫ | |||
| |
| intl = |
||
| intl = |
|||
}} |
}} |
||
'''GE Hitachi Nuclear Energy''' ('''GEH''') is a provider of [[nuclear reactor technology|advanced reactors]] and nuclear services. |
'''GE Hitachi Nuclear Energy''' ('''GEH''') is a provider of [[nuclear reactor technology|advanced reactors]] and nuclear services. It is headquartered in [[Wilmington, North Carolina]], United States. Established in June 2007, GEH is a nuclear alliance created by [[General Electric]] and [[Hitachi]]. In Japan, the alliance is [[:ja:日立GEニュークリア・エナジー|Hitachi-GE Nuclear Energy]].<ref>{{cite web |title=Our Global Nuclear Alliance: Delivering Solutions Based On Experience, Reliability, and Innovation |url=http://www.ge-energy.com/content/multimedia/_files/downloads/geh_glance.pdf |url-status=dead |archive-url=https://web.archive.org/web/20110930161554/http://www.ge-energy.com/content/multimedia/_files/downloads/geh_glance.pdf |archive-date=2011-09-30 |access-date=2011-07-20}}</ref> In November 2015, Jay Wileman was appointed CEO.<ref>{{Cite web|title = GE Hitachi names new CEO|url = http://www.starnewsonline.com/article/20151102/ARTICLES/151109960|website = StarNewsOnline.com|access-date = 2015-11-02}}</ref> |
||
==History== |
==History== |
||
*1955: Atomic Power Equipment Department established by GE |
|||
In 1955, the Atomic Power Equipment Department was established by GE. Two years later, in 1957, GE's first privately financed nuclear power reactor provided electricity for commercial use in [[Vallecitos Nuclear Center|Vallecitos, California]]. Additionally, in 1960, GE made and contributed to the [[Dresden Generating Station|Dresden Nuclear Power Station]] in Chicago. In the 1960s, it got involved in constructing and building the [[Boiling water reactor]] (BWR). The research into the project continued in the next 50 years resulting in production of 6 different BWR generations.<ref name="PM">{{cite web|url=https://www.powermag.com/the-evolution-of-the-esbwr/|title=The Evolution of the ESBWR|work=[[Power Magazine]]|date=November 1, 2010|access-date=December 4, 2020}}</ref> In 1997, the GE-Hitachi U.S. [[Advanced boiling water reactor]] (ABWR) design was certified as a final design in final form by the [[U.S. Nuclear Regulatory Commission]].<ref name="USNRC-ABWRDCInfoPage">{{cite web|url=https://www.nrc.gov/reactors/new-reactors/design-cert/abwr.html|title=Design Certification Information Page - ABWR|date=June 3, 2009|work=Design Certification Applications|publisher=[[Federal Government of the United States]], [[U.S. Nuclear Regulatory Commission]], [[Rockville, MD|Rockville]], [[Maryland|MD]], USA|access-date=2009-08-28}}</ref> |
|||
*1957: GE's first privately financed nuclear power reactor provides electricity for commercial use in [[Vallecitos Nuclear Center|Vallecitos, California]] |
|||
*1960s: BWR 1 and 2 constructed and begin operation |
|||
GE and Hitachi officially established the GE Hitachi Nuclear Energy (GEH) global alliance in 2007 by combining parts of their respective power businesses. Based in [[Wilmington, North Carolina]] is creating and supplying BWRs and giving assistance with boiling water and pressurized water reactors. In Canada, the organization was known as GE Hitachi Nuclear Energy Canada and its purpose is to provide fuel and service nuclear power plants that operate on heavy water reactors made by Atomic Energy Canada.<ref name="PM"/> In 2016, GE and Hitachi sold GE Hitachi Nuclear Energy Canada to BWXT Canada Ltd. and renamed BWXT Nuclear Energy Canada<ref>{{Cite news | url=https://www.bloomberg.com/press-releases/2016-12-19/bwxt-completes-acquisition-of-ge-hitachi-nuclear-energy-canada-inc | title=BWXT Completes Acquisition of GE Hitachi Nuclear Energy Canada Inc | newspaper=Bloomberg.com | date=19 December 2016 }}</ref><ref>{{Cite web|url=https://www.ge.com/news/press-releases/ge-and-hitachi-alliance-announces-sale-ge-hitachi-nuclear-energy-canada|title = GE and Hitachi Alliance Announces Sale of GE Hitachi Nuclear Energy Canada | GE News}}</ref><ref>{{Cite web|url=https://www.bwxt.com/news/2016/12/19/BWXT-Completes-Acquisition-of--GE-Hitachi-Nuclear-Energy-Canada-Inc|title = BWX Technologies, Inc. | People Strong, Innovation Driven}}</ref><ref>{{Cite web|url=https://www.thepeterboroughexaminer.com/news/peterborough-region/2016/12/22/ge-hitachi-nuclear-energy-canada-now-bwxt-nuclear-energy-canada-in-peterborough-after-sale-deal-closes.html|title=GE Hitachi Nuclear Energy Canada now BWXT Nuclear Energy Canada in Peterborough after sale deal closes|date=22 December 2016}}</ref> |
|||
*1970s: BWR 2 through 4 constructed and begin operation |
|||
*1980s: BWR 5 and 6 constructed and begin operation |
|||
In 2005, GE Hitachi filed design certification by NRC for their [[Economic Simplified Boiling Water Reactor]] (ESBWR). The ESBWR received a positive Safety Evaluation Report<ref>{{cite web |url=http://pbadupws.nrc.gov/docs/ML1034/ML103470210.html |title=Package ML103470210 - ESBWR FSER Final Chapters |publisher=[[Nuclear Regulatory Commission]] |access-date=2012-03-14}}</ref> and Final Design Approval<ref>{{cite web |url=http://pbadupws.nrc.gov/docs/ML1105/ML110540310.pdf |title=Final Design Approval for the Economic Simplified Boiling Water Reactor |first=Michael R. |last=Johnson |publisher=[[United States Department of Energy]] |date=9 March 2011 |access-date=2012-03-14}}</ref> on March 9, 2011. On June 7, 2011, the NRC completed its public comment period.<ref>{{cite press release |url=http://www.genewscenter.com/content/Detail.aspx?ReleaseID=12722&NewsAreaID=2 |title=NRC's Public Comment Period Ends on GE Hitachi Nuclear Energy's Application for ESBWR Reactor Certification |publisher=Genewscenter.com |date=23 June 2011 |access-date=2012-03-14 |archive-url=https://web.archive.org/web/20120324122813/http://www.genewscenter.com/content/Detail.aspx?ReleaseID=12722&NewsAreaID=2 |archive-date=2012-03-24 |url-status=dead }}</ref> Final rule was issued on September 16, 2014, after two outstanding problems with GE-Hitachi's modeling of loads on the steam dryer were solved.<ref>{{cite web |url=https://www.nrc.gov/reactors/new-reactors/design-cert/esbwr/review-schedule.html |title=ESBWR Application Review Schedule |publisher=[[Nuclear Regulatory Commission]] |date=17 July 2012 |access-date=2012-11-04}}</ref><ref>{{cite web |url=https://www.nrc.gov/reading-rm/doc-collections/news/2014/14-060.pdf |title=NRC Certifies GE-Hitachi New Reactor Design |publisher=[[Nuclear Regulatory Commission]] |date=16 September 2014 |access-date=2014-09-16}}</ref> In 2013, following its purchase of [[Horizon Nuclear Power]], [[Hitachi]] began the process of generic design assessment of the Hitachi-GE ABWR with the UK [[Office for Nuclear Regulation]].<ref>{{cite news|url=https://www.neimagazine.com/news/newsabwr-set-for-uk-design-assessment |title=ABWR set for UK design assessment |publisher=Nuclear Engineering International |date=January 16, 2013 |access-date=January 26, 2013 }}</ref> The process was completed in December 2017.<ref name=wnn-20171214>{{cite news |url=http://www.world-nuclear-news.org/RS-Hitachi-GE-ABWR-design-cleared-for-use-in-UK-1412174.html |title=Hitachi-GE ABWR design cleared for use in UK |publisher=World Nuclear News |date=14 December 2017 |access-date=3 January 2018}}</ref> In January 2020, the company started the regulatory licensing process for the [[BWRX-300]] with the U.S. [[Nuclear Regulatory Commission]].<ref name=wnn-20200131>{{cite news |url=https://www.world-nuclear-news.org/Articles/GE-Hitachi-initiates-US-licensing-of-BWRX-300 |title=GE Hitachi initiates US licensing of BWRX-300 |publisher=World Nuclear News |date=31 January 2020 |access-date=31 January 2020}}</ref> |
|||
*1997: [[Advanced boiling water reactor|ABWR]] design certified by the NRC |
|||
*2005: [[Economic Simplified Boiling Water Reactor|ESBWR]] design certification filed by NRC |
|||
Tennessee Valley Authority (TVA) is undertaking preliminary licensing in collaboration with OPG. SaskPower is considering a deployment, and ORLEN Synthos Green Energy (OSGE) and partners is in pre-licensing in Poland. GEH has memoranda of understanding with companies in Canada, Poland, UK, US, and Sweden, among others, and has begun the licensing process in the UK.<ref name=":0">{{Cite web |title=GE Hitachi Signs Contract for the First North American Small Modular Reactor {{!}} GE News |url=https://www.ge.com/news/press-releases/ge-hitachi-signs-contract-for-the-first-north-american-small-modular-reactor |access-date=2023-01-30 |website=www.ge.com |language=en}}</ref> |
|||
*2014: [[Economic Simplified Boiling Water Reactor|ESBWR]] design certified by NRC |
|||
In 2023, the company signed a contract with [[Ontario Power Generation]] (OPG), [[SNC-Lavalin]], and [[Aecon]] to deploy a [[BWRX-300]] [[small modular reactor]] (SMR) at OPG's Darlington New Nuclear Project site, the first contract for a North American grid-scale SMR.<ref name=":0" /> |
|||
==Reactors == |
==Reactors == |
||
The [[ABWR|Advanced Boiling Water Reactor (ABWR)]] is the world's first operational Generation III Class advanced light water reactor design. |
The [[ABWR|Advanced Boiling Water Reactor (ABWR)]] is the world's first operational Generation III Class advanced light water reactor design. The NRC has registered GEH's petition for renewal of ABWR certification.<ref>{{cite web | url=http://federalregister.gov/a/2011-3734 | title=Federal Register :: Request Access }}</ref> The [[Economic Simplified Boiling Water Reactor]] (ESBWR), the Generation III+ Class design reactor, received a positive final safety evaluation report and final design approval in March 2011, and is expected to receive a license from the NRC by September 2011.{{needs update|date=February 2024}}<ref name=street> |
||
{{cite news |
{{cite news |
||
| url = http://www.thestreet.com/story/11037277/1/ge-hitachi-nuclear-energy8217s-esbwr-reactor-design-receives-nrc8217s-final-design-approval-clearing-the-way-for-global-sales.html |
| url = http://www.thestreet.com/story/11037277/1/ge-hitachi-nuclear-energy8217s-esbwr-reactor-design-receives-nrc8217s-final-design-approval-clearing-the-way-for-global-sales.html |
||
| work= The Street |
| work= The Street |
||
| date=2011-03-09 |
| date=2011-03-09 |
||
| title= GE Hitachi Nuclear |
| title= GE Hitachi Nuclear Energy's ESBWR Reactor Design Receives NRC's Final Design Approval, Clearing The Way For Global Sales |
||
| |
| access-date=March 12, 2011}} |
||
</ref><ref>https://www.nrc.gov/reactors/new-reactors/design-cert/esbwr/review-schedule.html</ref> |
</ref><ref>{{cite web |url=https://www.nrc.gov/reactors/new-reactors/design-cert/esbwr/review-schedule.html |title=NRC: ESBWR Application Review Schedule |website=www.nrc.gov |url-status=dead |archive-url=https://web.archive.org/web/20090514012638/http://www.nrc.gov/reactors/new-reactors/design-cert/esbwr/review-schedule.html |archive-date=2009-05-14}} </ref> |
||
GEH's [[PRISM (reactor)|Power Reactor Innovative Small Modular]] (PRISM) is a Generation IV reactor that uses liquid sodium as a coolant. |
GEH's [[PRISM (reactor)|Power Reactor Innovative Small Modular]] (PRISM) is a Generation IV reactor that uses liquid sodium as a coolant. In 2020 GEH partnered with [[TerraPower]] to develop a Natrium reactor.<ref>{{cite web | url=https://neutronbytes.com/2020/08/29/terrapower-partners-with-ge-hitachi-to-develop-a-commercial-sodium-cooled-faster-reactor-that-leverages-a-molten-salt-thermal-system/ | title=TerraPower Partners with GE Hitachi to Develop a Commercial Sodium Cooled Faster Reactor that Leverages a Molten Salt Thermal System | date=29 August 2020 }}</ref> |
||
In 2018 GEH agreed to collaborate with [[Holtec International]] on the commercialization of the Holtec SMR-160, a 160 [[Watt|MWe]] [[pressurized water reactor]] (PWR) [[small modular reactor]].<ref name=wnn-20180215>{{cite news |url=http://www.world-nuclear-news.org/NN-Holtec-and-GEH-team-up-on-advancing-SMR-160-1502184.html |title=Holtec and GEH team up on advancing SMR-160 |publisher=World Nuclear News |date=15 February 2018 | |
In 2018, GEH agreed to collaborate with [[Holtec International]] on the commercialization of the Holtec SMR-160, a 160 [[Watt|MWe]] [[pressurized water reactor]] (PWR) [[small modular reactor]].<ref name=wnn-20180215>{{cite news |url=http://www.world-nuclear-news.org/NN-Holtec-and-GEH-team-up-on-advancing-SMR-160-1502184.html |title=Holtec and GEH team up on advancing SMR-160 |publisher=World Nuclear News |date=15 February 2018 |access-date=19 February 2018}}</ref> |
||
==Nuclear services== |
==Nuclear services== |
||
As nuclear plants get older and worldwide demand for energy increases, GEH offers |
As nuclear plants get older and worldwide demand for energy increases, GEH offers services for adapting plant performance and power output as well as maintenance for extending plant life. |
||
==Fuel services== |
==Fuel services== |
||
GEH’s fuel cycle business supplies fuel products and services to customers around the world. GE Hitachi Nuclear Energy owns the [[Morris Operation]] |
GEH’s fuel cycle business supplies fuel products and services to customers around the world. GE Hitachi Nuclear Energy owns the [[Morris Operation]]—the only de facto high-level radioactive waste storage site in the United States.<ref>{{cite web|url=https://www.federalregister.gov/documents/2017/07/19/2017-15146/ge-hitachi-nuclear-energy-americas-llc-ge-hitachi-morris-operation-independent-spent-fuel-storage|title=GE-Hitachi Nuclear Energy Americas, LLC; GE-Hitachi Morris Operation Independent Spent Fuel Storage Installation|publisher=[[Federal Register]]|access-date=December 6, 2020|date=July 19, 2017}}</ref> |
||
==See also== |
|||
*[[Horizon Nuclear Power]] |
|||
== References == |
== References == |
||
{{Reflist}} |
{{Reflist|30em}} |
||
== External links == |
|||
* [https://www.lib.ncsu.edu/findingaids/mc00595 Guide to the GE Nuclear Energy Standard Safety Analysis Reports 1994] |
|||
{{General Electric}} |
{{General Electric}} |
||
{{Hitachi}} |
{{Hitachi}} |
||
Line 69: | Line 77: | ||
[[Category:Nuclear technology companies of Japan]] |
[[Category:Nuclear technology companies of Japan]] |
||
[[Category:General Electric subsidiaries]] |
[[Category:General Electric subsidiaries]] |
||
[[Category:Hitachi]] |
[[Category:Hitachi subsidiaries]] |
||
[[Category: |
[[Category:Multinational joint-venture companies]] |
||
[[Category:Electronics companies established in 2007]] |
Revision as of 10:54, 3 April 2024
Company type | Joint venture |
---|---|
Industry | Nuclear power |
Founded | June 2007 |
Headquarters | Wilmington, North Carolina, US |
Area served | Worldwide |
Key people | Jay Wileman (president & CEO) |
Owner | |
Number of employees | 3,000 |
Website | gevernova |
GE Hitachi Nuclear Energy (GEH) is a provider of advanced reactors and nuclear services. It is headquartered in Wilmington, North Carolina, United States. Established in June 2007, GEH is a nuclear alliance created by General Electric and Hitachi. In Japan, the alliance is Hitachi-GE Nuclear Energy.[1] In November 2015, Jay Wileman was appointed CEO.[2]
History
In 1955, the Atomic Power Equipment Department was established by GE. Two years later, in 1957, GE's first privately financed nuclear power reactor provided electricity for commercial use in Vallecitos, California. Additionally, in 1960, GE made and contributed to the Dresden Nuclear Power Station in Chicago. In the 1960s, it got involved in constructing and building the Boiling water reactor (BWR). The research into the project continued in the next 50 years resulting in production of 6 different BWR generations.[3] In 1997, the GE-Hitachi U.S. Advanced boiling water reactor (ABWR) design was certified as a final design in final form by the U.S. Nuclear Regulatory Commission.[4]
GE and Hitachi officially established the GE Hitachi Nuclear Energy (GEH) global alliance in 2007 by combining parts of their respective power businesses. Based in Wilmington, North Carolina is creating and supplying BWRs and giving assistance with boiling water and pressurized water reactors. In Canada, the organization was known as GE Hitachi Nuclear Energy Canada and its purpose is to provide fuel and service nuclear power plants that operate on heavy water reactors made by Atomic Energy Canada.[3] In 2016, GE and Hitachi sold GE Hitachi Nuclear Energy Canada to BWXT Canada Ltd. and renamed BWXT Nuclear Energy Canada[5][6][7][8]
In 2005, GE Hitachi filed design certification by NRC for their Economic Simplified Boiling Water Reactor (ESBWR). The ESBWR received a positive Safety Evaluation Report[9] and Final Design Approval[10] on March 9, 2011. On June 7, 2011, the NRC completed its public comment period.[11] Final rule was issued on September 16, 2014, after two outstanding problems with GE-Hitachi's modeling of loads on the steam dryer were solved.[12][13] In 2013, following its purchase of Horizon Nuclear Power, Hitachi began the process of generic design assessment of the Hitachi-GE ABWR with the UK Office for Nuclear Regulation.[14] The process was completed in December 2017.[15] In January 2020, the company started the regulatory licensing process for the BWRX-300 with the U.S. Nuclear Regulatory Commission.[16]
Tennessee Valley Authority (TVA) is undertaking preliminary licensing in collaboration with OPG. SaskPower is considering a deployment, and ORLEN Synthos Green Energy (OSGE) and partners is in pre-licensing in Poland. GEH has memoranda of understanding with companies in Canada, Poland, UK, US, and Sweden, among others, and has begun the licensing process in the UK.[17]
In 2023, the company signed a contract with Ontario Power Generation (OPG), SNC-Lavalin, and Aecon to deploy a BWRX-300 small modular reactor (SMR) at OPG's Darlington New Nuclear Project site, the first contract for a North American grid-scale SMR.[17]
Reactors
The Advanced Boiling Water Reactor (ABWR) is the world's first operational Generation III Class advanced light water reactor design. The NRC has registered GEH's petition for renewal of ABWR certification.[18] The Economic Simplified Boiling Water Reactor (ESBWR), the Generation III+ Class design reactor, received a positive final safety evaluation report and final design approval in March 2011, and is expected to receive a license from the NRC by September 2011.[needs update][19][20]
GEH's Power Reactor Innovative Small Modular (PRISM) is a Generation IV reactor that uses liquid sodium as a coolant. In 2020 GEH partnered with TerraPower to develop a Natrium reactor.[21]
In 2018, GEH agreed to collaborate with Holtec International on the commercialization of the Holtec SMR-160, a 160 MWe pressurized water reactor (PWR) small modular reactor.[22]
Nuclear services
As nuclear plants get older and worldwide demand for energy increases, GEH offers services for adapting plant performance and power output as well as maintenance for extending plant life.
Fuel services
GEH’s fuel cycle business supplies fuel products and services to customers around the world. GE Hitachi Nuclear Energy owns the Morris Operation—the only de facto high-level radioactive waste storage site in the United States.[23]
See also
References
- ^ "Our Global Nuclear Alliance: Delivering Solutions Based On Experience, Reliability, and Innovation" (PDF). Archived from the original (PDF) on 2011-09-30. Retrieved 2011-07-20.
- ^ "GE Hitachi names new CEO". StarNewsOnline.com. Retrieved 2015-11-02.
- ^ a b "The Evolution of the ESBWR". Power Magazine. November 1, 2010. Retrieved December 4, 2020.
- ^ "Design Certification Information Page - ABWR". Design Certification Applications. Federal Government of the United States, U.S. Nuclear Regulatory Commission, Rockville, MD, USA. June 3, 2009. Retrieved 2009-08-28.
- ^ "BWXT Completes Acquisition of GE Hitachi Nuclear Energy Canada Inc". Bloomberg.com. 19 December 2016.
- ^ "GE and Hitachi Alliance Announces Sale of GE Hitachi Nuclear Energy Canada | GE News".
- ^ "BWX Technologies, Inc. | People Strong, Innovation Driven".
- ^ "GE Hitachi Nuclear Energy Canada now BWXT Nuclear Energy Canada in Peterborough after sale deal closes". 22 December 2016.
- ^ "Package ML103470210 - ESBWR FSER Final Chapters". Nuclear Regulatory Commission. Retrieved 2012-03-14.
- ^ Johnson, Michael R. (9 March 2011). "Final Design Approval for the Economic Simplified Boiling Water Reactor" (PDF). United States Department of Energy. Retrieved 2012-03-14.
- ^ "NRC's Public Comment Period Ends on GE Hitachi Nuclear Energy's Application for ESBWR Reactor Certification" (Press release). Genewscenter.com. 23 June 2011. Archived from the original on 2012-03-24. Retrieved 2012-03-14.
- ^ "ESBWR Application Review Schedule". Nuclear Regulatory Commission. 17 July 2012. Retrieved 2012-11-04.
- ^ "NRC Certifies GE-Hitachi New Reactor Design" (PDF). Nuclear Regulatory Commission. 16 September 2014. Retrieved 2014-09-16.
- ^ "ABWR set for UK design assessment". Nuclear Engineering International. January 16, 2013. Retrieved January 26, 2013.
- ^ "Hitachi-GE ABWR design cleared for use in UK". World Nuclear News. 14 December 2017. Retrieved 3 January 2018.
- ^ "GE Hitachi initiates US licensing of BWRX-300". World Nuclear News. 31 January 2020. Retrieved 31 January 2020.
- ^ a b "GE Hitachi Signs Contract for the First North American Small Modular Reactor | GE News". www.ge.com. Retrieved 2023-01-30.
- ^ "Federal Register :: Request Access".
- ^ "GE Hitachi Nuclear Energy's ESBWR Reactor Design Receives NRC's Final Design Approval, Clearing The Way For Global Sales". The Street. 2011-03-09. Retrieved March 12, 2011.
- ^ "NRC: ESBWR Application Review Schedule". www.nrc.gov. Archived from the original on 2009-05-14.
- ^ "TerraPower Partners with GE Hitachi to Develop a Commercial Sodium Cooled Faster Reactor that Leverages a Molten Salt Thermal System". 29 August 2020.
- ^ "Holtec and GEH team up on advancing SMR-160". World Nuclear News. 15 February 2018. Retrieved 19 February 2018.
- ^ "GE-Hitachi Nuclear Energy Americas, LLC; GE-Hitachi Morris Operation Independent Spent Fuel Storage Installation". Federal Register. July 19, 2017. Retrieved December 6, 2020.