Mississauga Transitway
Mississauga Transitway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Mississauga, Ontario, Canada | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit type | Bus rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Began operation | November 17, 2014 – November 22, 2017 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | MiWay GO Transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System length | 18 km (11 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Mississauga Transitway is a bus rapid transit (BRT) system in Mississauga, Ontario, Canada. It comprises a series of purpose-constructed bus-only roadways, as well as reserved lanes on existing city streets and portions of Highway 403, that together form a continuous 18 km (11 mi) route spanning most of the city from Winston Churchill Boulevard in the west to the junction of Highways 401 and 427 in the east on the border with Toronto. Service on the Transitway is provided by MiWay and GO Transit, with some stations providing connections to Brampton Transit and Toronto Transit Commission (TTC) bus services.
Originally proposed in the 1970s, the Mississauga Transit plan has evolved over time. A minimum of eighteen studies were made between 1970 and 1992. In the 1990s, a serious proposal intended to build a "transitway" from Ridgeway Drive at the very western edge of the city;[1] this was eventually revised to its current state, with construction beginning in November 2010.[2][3] The first stretch of the present Transitway opened between Hurontario Street and Dixie Road on November 17, 2014.[4] Other remaining sections faced delays, and were open in stages until the eastern terminus, Renforth, was opened on November 22, 2017.[5][6] There were plans to eventually extend Transitway service to a new regional bus terminal at the Kipling subway station in southern Etobicoke,[7] which came to fruition with the opening of the terminal on January 4, 2021.[8][9]
Design and operation
The Mississauga Transitway consists of two busways and bus-priority lanes. The western busway segment parallels Highway 403 from the western terminus at Winston Churchill Boulevard to Erin Mills Parkway. From there, buses use dedicated shoulder lanes on Highway 403 and Centre View Drive to reach MiWay's City Centre Transit Terminal on Rathburn Road. The longer eastern busway begins east of Hurontario Street, paralleling Highway 403 to Cawthra Road and then following Eastgate Parkway on its north and west side to Eglinton Avenue, and Eglinton on its north side to the eastern terminus at Renforth Drive at the boundary with Toronto.
Bus services along the Mississauga Transitway operate similarly to that of the Ottawa Transitway network, using a mixture of express and local routes that call at intermediate stations constructed along the route. Because the Transitway does not directly connect to any major transit hubs other than the City Centre Terminal, all routes that use the Transitway travel in mixed traffic to reach other outlying termini such as Kipling subway station.
The Transitway is shared by MiWay standard and articulated buses for intra-city travel, along with GO Transit-operated highway coaches and double-decker buses along inter-city routes. The busways have a maximum speed of 80 km/h (50 mph) on the dedicated roadway between stations, and 50 km/h (31 mph) in the vicinity of stations. MiWay buses operating along the Transitway stop at all stations by request, while GO Transit routes only make stops at Winston Churchill, Erin Mills, Dixie, and Renforth stations (depending on the route).[1][10]
Funding and construction
The Transitway project, estimated to cost $259 million,[3] was funded as part of the Government of Ontario's MoveOntario 2020 plan, with both the federal and provincial governments contributing up to a total of $173 million.[11] Construction responsibilities were divided between Metrolinx and the City of Mississauga: Metrolinx was responsible for the western segment between Winston Churchill and Erin Mills, a portion of the eastern segment between Hurontario and Cawthra, and Renforth Station; while the city was responsible for all other stations and segments.[6] Construction on the eastern segment began in November 2010,[3] while Metrolinx launched construction of the western segment in November 2013.[12]
Including construction, land, design and bus acquisition, Mississauga’s cost was at least $328 million. Metrolinx 's cost was over $200 million. The federal government contributed $83 million, bringing the total to approximately $611 million.[13]
Routes using the transitway
MiWay
With the opening of the first phase on November 17, 2014, MiWay adjusted three of its routes to use the eastern section of the corridor, with service initially operating Monday to Saturday from 4:30 AM to 10:30 PM. A fourth route, 110 University, began using the Transitway lanes on Highway 403 on September 7, 2015 with the opening of Erin Mills station, which is the only Transitway station served by this route.
On January 8, 2017, with the opening of the new Winston Churchill station, new Sunday service was implemented on 109 Meadowvale Express, expanding service along the full length of the Mississauga Transitway to 7 days a week.
Route | Service Type | Terminus | Service Span | |
---|---|---|---|---|
87 Meadowvale-Skymark | Local | Meadowvale Town Centre Bus Terminal | Renforth | Rush hour |
100 Airport Express | Express | Winston Churchill | Toronto Pearson International Airport | Monday–Friday |
107 Malton Express | Express | City Centre Transit Terminal | Humber College | September–April: Monday–Friday |
Westwood Mall Bus Terminal | September–April: Saturdays, Sundays and Holidays May–August: all week | |||
109 Meadowvale Express | Express | Meadowvale Town Centre Bus Terminal | Kipling subway station | All week |
110 University Express | Express | City Centre Transit Terminal | Clarkson GO Station | All week |
University of Toronto Mississauga (short turn) | Monday–Friday |
GO Transit
Current GO Transit bus routes that use the Transitway include the following:
Route | Stations used | |
---|---|---|
19 | Mississauga / North York | Dixie, Renforth |
25 | Waterloo / Mississauga | Erin Mills, Winston Churchill |
29 | Guelph / Mississauga | Erin Mills, Winston Churchill |
40 | Hamilton / Richmond Hill | Dixie, Renforth |
45/46/47 | 407 West | Erin Mills |
Stations
Access to the stations along the BRT portion of the route is by means of pedestrian walkways, with Kiss & Ride areas at most stations and Park & Ride lots at selected stations. All stations are wheelchair-accessible (), have heated waiting areas, and similar to the Züm service operated by Brampton Transit, loading platforms designed for level boarding.[14] Transitway stations are unstaffed and there are no faregates or fare-paid areas within them. Fare payment is done upon boarding buses as with on-street routes.
The following is a list of stations, from west to east:[10]
Station | Opened[15] | GO Transit Stop | Park and Ride | Kiss and Ride | Notes |
---|---|---|---|---|---|
Winston Churchill | January 2, 2017[16] | Yes | 300 spaces | Yes | |
Erin Mills | September 7, 2015 | Yes | 300 spaces | Yes |
|
City Centre | November 1997 | Yes[a] | 200 spaces | Yes |
|
Central Parkway | November 17, 2014[4] | No | Yes | ||
Cawthra | No | 60 spaces | Yes | ||
Tomken | No | Yes | |||
Dixie | Yes | 170 spaces | Yes |
| |
Tahoe | February 16, 2016[17][18] | No | No |
| |
Etobicoke Creek | No | No |
| ||
Spectrum | May 1, 2017[19] | No | No | ||
Orbitor | No | No | |||
Renforth | November 22, 2017[20] | Yes | No |
|
A multi-modal interchange with the western extension of the TTC's Line 5 Eglinton is currently under construction at Renforth station.[21] A later phase will terminate at the nearby Pearson International Airport. Originally proposed in 2007 under the city of Toronto's Transit City plan, the first phase of Line 5 will open as far west as Mount Dennis station at Weston Road in 2023. The Renforth interchange would open later, pending the financing for the project,[22] and would feature a full-service below grade BRT station, but only an at-grade median surface stop for the LRT, requiring transferring passengers to cross Commerce Boulevard and descend a set of stairs to access the BRT.[23]
As of 2020 however, in an addendum to the Line 5 extension, the addendum showed the future Renforth LRT station partially at-grade and the station located off-street on the north side of Eglinton, north of the transitway terminal.[24]
Ridership
Year | Ridership[25] |
---|---|
2017 | At least 5 million[25] |
2019 | 6,083,846 [25] |
2020 | 574,956[25] |
2021 | 2,266,910[25] |
Criticism
Due to the bankruptcy of contractor B. Gottardo, some stations were not complete 2 years after officially opening.[26]
Gil Peñalosa, a former business analyst Mississauga, considered the Transitway's location a mistake. "It should have been built along Burnamthorpe, the heart of the city.”[27]
Looking at the Erin Mills station, Amar Shubhanan Lad comments that "Pedestrian and cycling connections in particular are poor, inaccessible and uninviting to try." Lad also found that a previously existing pedestrian shortcut to the station had been closed at local resident's request.[28]
See also
Notes
- ^ Connects to GO Transit at Square One Bus Terminal across the road
References
- ^ a b c d "The Mississauga Transitway". Transit Toronto. 2006-11-10. Archived from the original on 2008-06-15. Retrieved 2008-04-26.
- ^ "Rapid - Mississauga Bus Rapid Transit News" (PDF). 3. Mississauga. Fall 2009. Retrieved 2009-11-08.
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ a b c Joseph Chin (2010-11-19). "City breaks ground on BRT station". Mississauga News. Retrieved 2014-05-24.
- ^ a b "Mississauga opens 4 Transitway stations". CBC News. 2014-11-17. Retrieved 2014-11-21.
- ^ Tess Kalinowski (2014-05-06). "Key transit projects facing delays". Torstar Network, via Mississauga News. Retrieved 2014-05-24.
- ^ a b "Mississauga Transitway Project". GO Transit. Archived from the original on 2014-08-21. Retrieved 2014-05-24.
- ^ Mackenzie, Robert (August 18, 2017). "From Drawing Boards to Reality: More GO Train and Bus Service". Urban Toronto. Retrieved 2017-10-27.
- ^ "New Kipling Bus Terminal". City of Mississauga. 2020-01-29. Retrieved 2021-01-17.
- ^ metrolinx (2020-12-14). "Making way for MiWay service with new bus terminal opening at Kipling Transit Hub". Metrolinx News. Retrieved 2021-01-17.
- ^ a b "Rapid - Mississauga Bus Rapid Transit News" (PDF). 1. Mississauga. Spring 2008. Retrieved 2009-11-08.
{{cite journal}}
: Cite journal requires|journal=
(help) - ^ "Mississauga Receives Federal Funding for Bus Rapid Transit Program". City of Mississauga press release. 2007-03-06. Retrieved 2008-04-26.
- ^ Louie Rosella (2013-11-29). "Phase 2 of Mississauga Transitway begins". Mississauga News. Retrieved 2014-05-24.
- ^ Williams, Rachael (2017-12-18). "Amid cost overruns and project delays, the Mississauga Transitway is complete". Mississauga News. Retrieved 2022-07-18.
- ^ "Mississauga Transitway". City of Mississauga. Retrieved 24 November 2018.
- ^ "MiWay Five Transit Service Plan". City of Mississauga. Retrieved 25 November 2018.
- ^ "MiWay service at Winston Churchill Station starts on January 2". MiWay Blog. City of Mississauga. December 20, 2016. Archived from the original on January 4, 2017. Retrieved 25 November 2018.
- ^ MiWay will Service Two New Mississauga Transitway Stations February 16
- ^ Williams, Rachael (16 February 2016). "Two new Transitway stations open today". Mississauga News. Retrieved 2018-01-19.
With new stations located at Tahoe and Etobicoke Creek, Transitway service will now extend from Dixie station to the Mississauga Airport Corporate Centre
- ^ "MiWay will Service Two New Mississauga Transitway Stations May 1". MiWay Blog. City of Mississauga. 2017-04-25. Retrieved 2018-01-19.
- ^ Newport, Ashley (November 21, 2017). "MiWay to Begin Servicing New Station Tomorrow". Insauga. Retrieved November 24, 2017.
- ^ "Second tunnel starts as Rexy joins Renny in tunnelling the Eglinton Crosstown West Extension". Metrolinx. August 5, 2022. Archived from the original on August 6, 2022.
- ^ San Grewal (November 2, 2016). "Mississauga fumes over $470 million Toronto LRT funding assumption". Toronto Star. Retrieved November 2, 2016.
- ^ "Welcome to our Public Open House: Eglinton Crosstown Light Rail Transit (LRT)" (PDF). Archived from the original (PDF) on 2011-06-07. Retrieved 2009-11-29.
- ^ "ENVIRONMENTAL PROJECT REPORT – 2020 ADDENDUM APPENDIX A DESIGN PLATES" (PDF). Metrolinx. Retrieved 7 July 2020.
- ^ a b c d e Longwell, Karen (2022-07-07). "$528 million Mississauga Transitway ridership dropped by 91% during the pandemic". Insauga. Retrieved 2022-07-17.
- ^ Williams, Rachael (2016-04-19). ""Disgusting" Transitway stations hit a nerve for Mississauga city councillor". Mississauga News Tuesday, April 19, 2016. Retrieved 2022-07-18.
- ^ Williams, Rachael (2016-03-01). "Mississauga's Transitway a white elephant in the eyes of city-building expert Gil Penalosa". Mississauga News. Retrieved 2022-07-17.
- ^ Lad, Amar Shubhanan (2018-11-18). "Planning for the First Mile & Last Mile in the Greater Toronto and Hamilton Area" (PDF). Retrieved 2022-07-17.
External links
- Official website
- Mississauga Bus Rapid Transit (BRT)
- Mississauga MiWay and GO Transit Route and Stations
- BRT Detailed Design Concept Plans
- BRT Detail Design - Winston Churchill to Erin Mills Parkway (DRAFT)
- BRT Detail Design - Hurontario to Cawthra
- BRT Design Plan - Eastgate Pkwy - Cawthra to Fieldgate Section
- BRT Detail Design - Fieldgate to Renforth