Line 15 (Shanghai Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by T09 (talk | contribs) at 07:38, 27 January 2021. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 15
 15 
Construction site of Shanghai Metro Line 15 at Guilin Park station
Overview
Other name(s)L1 (planned name)
StatusIn service
LocaleShanghai
Termini
Stations30
Service
TypeRapid transit
SystemShanghai Metro
History
OpenedJanuary 23, 2021; 3 years ago (2021-01-23)
Technical
Line length42.3 km (26.3 mi)
Track gauge1,435 mm (4 ft 8+12 in)

Line 15 of the Shanghai Metro is a metro line in the city of Shanghai that opened on 23 January 2021.[1] The line begins at Template:SHM stations in Baoshan District at its northern end, and terminates at Template:SHM stations[2] in Minhang District at its southern end, via Template:SHM stations and Template:SHM stations. It will be 42.3 kilometres (26.3 mi) in length and have 30 stations.[3][4] Line 15 interchanges with lines 1, 2, 3, 7, 9, 11, 12, 13 and 14.[5] The line is the 4th Shanghai Metro line to be fully automated and driverless, after Line 10, Pujiang line and Line 18.

History

The line was originally scheduled to open by the end of 2020.[6] However, on 24 December 2020, Shanghai Metro officials announced that the opening would take place in 2021, prior to the start of the Chinese New Year on 12 February 2021. Additionally, Line 15's Template:SHM stations station will not open until later in the year, meaning an interchange to Line 9 will not be possible initially.

On January 19, 2021, there is a partial collapse in an under-construction entrance and exit 9 of the Zizhu Hi-tech Zone station. There were no casualties at the scene, no impact on the surrounding environment, and no impact on the opening of Line 15.

Stations

Service
routes
Station name[2] Connections Distance
km
Location
English Chinese
Template:SHM stations 顾村公园  7  0.0 0.0 Baoshan
Template:SHM stations 锦秋路 3.09 3.09
Template:SHM stations 丰翔路 1.21 4.30
Template:SHM stations 南大路 1.00 5.30
Template:SHM stations 祁安路 1.40 6.70 Putuo
Template:SHM stations 古浪路 1.49 8.19
Template:SHM stations 武威东路 0.70 8.89
Template:SHM stations 上海西站  11  Shanghai West railway station SXH 1.63 10.52
Template:SHM stations 铜川路 1.40 11.92
Template:SHM stations 梅岭北路 0.67 12.59
Template:SHM stations 大渡河路  13  1.42 14.02
Template:SHM stations 长风公园 0.88 14.90
Template:SHM stations 娄山关路  2 [a] 1.42 16.32 Changning
Template:SHM stations 红宝石路 1.37 17.69
Template:SHM stations 姚虹路 1.71 19.50
Template:SHM stations 吴中路 0.86 20.36 Minhang
Template:SHM stations 桂林路  9  1.41 21.77 Xuhui
Template:SHM stations 桂林公园  12  0.86 22.64
Template:SHM stations 上海南站  1   3   Jinshan  Shanghai South railway station SNH 1.86 24.50
Template:SHM stations 华东理工大学 1.16 25.66
Template:SHM stations 罗秀路 1.36 27.02
Template:SHM stations 朱梅路 1.04 28.06
Template:SHM stations 华泾西 0.76 28.82
Template:SHM stations 虹梅南路 1.58 30.40 Minhang
Template:SHM stations 景西路 1.17 31.57
Template:SHM stations 曙建路 1.37 32.94
Template:SHM stations 双柏路 0.95 33.89
Template:SHM stations 元江路 2.80 36.69
Template:SHM stations 永德路 2.66 39.35
Template:SHM stations 紫竹高新区 1.87 41.22

Controversy

On 28 December 2011, the northern terminus of the line was shifted from Template:SHM stations station to an independent station called Template:SHM stations, located near Line 7 between Qihua and Template:SHM stations but with no direct interchange to Line 7.[7] This has stirred controversy among residents over Line 15's already lack of convenient connections with other major subway lines such as Line 2 and Line 10.[8] Planners reconsidered and extended Line 15 north of Jinqiu Road to connect with Line 7 at Template:SHM stations.[9] In December 2019, the line was further revised to provide an interchange with Line 2 at Template:SHM stations station. However, there is still no interchange planned with Line 10, as the Line 15 Template:SHM stations station is located mid-way between Template:SHM stations and Template:SHM stations stations on Line 10.[10]

Notes

  1. ^ Out of system transfer with Line 2.

References

  1. ^ 1月23日起上海地铁15号线开通初期运营 [Shanghai Metro Line 15 to open on 23 January]. www.shmetro.com (in Chinese). 21 January 2021. Retrieved 21 January 2021.
  2. ^ a b "上海轨交15号线途经5区,30座车站站名公布".
  3. ^ 关于轨道交通15号线专项规划(草案)的公示. www.shgtj.gov.cn (in Chinese (China)). Retrieved 2017-08-06.
  4. ^ 上海轨交15号线开始盾构施工 跨宝山至闵行5个区设30站. NetEase (in Chinese). 2017-09-08. Retrieved 2018-01-16.
  5. ^ 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
  6. ^ Chen Huizhi (2020-06-19). "Metro Line 15 one step closer to completion". Shine.cn. Retrieved 2020-12-14.
  7. ^ "关于轨道交通15号线(祁华路停车场—南大路段)专项规划(调整)的公示". 上海规划和国土资源. 2011-12-28.
  8. ^ 实习生叶页. "无法与多线换乘引热议 换乘方案未定或进一步优化修改-换乘 公示 天山路 规划 线 该图 网友 车站 市民 推说-上海频道-东方网". sh.eastday.com. Retrieved 2017-08-06.
  9. ^ "关于轨道交通15号线南段车辆基地选址专项规划调整的公示". 2015-02-17.
  10. ^ "【喜提新车】集颜值内涵与智慧"意识"于一身的15号线首列车今日抵沪" (in Chinese). 上海地铁shmetro. 2019-12-20. Archived from the original on 2019-12-25. Retrieved 2019-12-25.