Jump to content

Line 2 (Shenzhen Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Nwaiotbaw (talk | contribs) at 09:24, 12 September 2023. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 2
Interior of CRRC Changchun train
Overview
Other name(s)Shekou line
(蛇口线; 蛇口線; Shékǒu xiàn; Se4 Hau2 Sin3)
Native name二号线; 二號線; Èrhào Xiàn; Ji6 Hou6 Sin3
StatusOperational
LocaleShenzhen, China
Termini
Stations32
Color on map     Orange (#db6d1c)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Shekou West depot
Houhai stabling yard
Rolling stockCRRC Changchun (201–252) (6A)
CRRC Zhuzhou (253–257) (6A)
Daily ridership717,000 (2018 Peak)[1]
History
Opened28 December 2010; 13 years ago (2010-12-28)
Last extension28 October 2020; 4 years ago (2020-10-28)
Technical
Line length39.6 km (24.61 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (overhead lines)
Operating speed80 km/h (50 mph)
SignallingCBTC Moving block
Urbalis 888
Route map

Shekou West Depot
Chiwan
Shekou Port
Sea World
Shuiwan
Dongjiaotou
Wanxia
Houhai Stabling Yard
Haiyue
Dengliang
Houhai
13 to Shangwu
Keyuan
Hongshuwan
Window of the World
connection to Line 1
Qiaocheng North
Shenkang
connection to Line 7
Antuo Hill
Qiaoxiang
Xiangmi
Xiangmei North
Jingtian
Lianhua West
Futian
3 11 Futian railway station (Guangdong)
Civic Center
Gangxia North
Huaqiang North
Yannan
Grand Theater
1 to Luohu
Hubei
Huangbeiling
Xinxiu
Liantang Checkpoint
Xianhu Road
Liantang
Up arrow 2/8 Down arrow
Wutong Mountain South
Shatoujiao
Haishan
Yantian Port West
Wangji Lake Stabling Yard
Shenwai Senior Campus
Yantian Road
Hong'anwei
Yantianxu
Dameisha
Xiaomeisha
Down arrowLine 8 Phase III
(Under Construction)
Xichong Depot
Xichong
Train exterior

Shenzhen Metro Line 2 (formerly branded as Shekou line), runs West–East from Chiwan to Liantang. It opened on 28 December 2010. Line 2 merges into Line 8 at Liantang station, with trains on Line 2 continue service to Yantian Road station. Line 2's color is orange.[2][3]

History

First stage

The first section of Line 2 runs from Chiwan to Window of the World, it is 15.514 km (9.640 mi) long, and these 12 stations are all underground. This section opened on 28 December 2010.

Second stage

The second section runs from Window of the World to Xinxiu, it is 20.65 km (12.83 mi) long, and has 17 stations. The second stage of Line 2 opened on 28 June 2011.

Third stage

The third section runs from Xinxiu to Liantang, it is 3.82 km (2.37 mi) long, and has 3 stations. The third stage of Line 2 opened on 28 October 2020.

Timeline

Segment Commencement Length Station(s) Name
Chiwan — Window of the World 28 December 2010 15.514 km (9.64 mi) 12 Phase 1
Window of the World — Xinxiu 28 June 2011 20.266 km (12.59 mi) 17 Phase 2
Xinxiu — Liantang 28 October 2020 3.82 km (2.37 mi) 3 Phase 3

Service routes

Stations

Service
routes
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Chiwan 赤湾 5 79 80 B945 M489 N4 N8 0.00 0.00 Nanshan
Shekou Port 蛇口港 22 70 79 80 113 122 204 226 233 328 331 332 K105 K113 K204 M371 M400 M409 M430 M448 N4 N8 1.85 1.85
Sea World 海上世界 12 37 122 204 226 233 328 331 332 B816 K105 K113 K204 M371 M400 M409 M430 M448 M493 M519 N4 N4区间 Airport 10(机场10) Q-H 8(前海行8) 1.10 2.95
Shuiwan 水湾 204 226 233 331 K105 K204 M241 M371 M400 M430 M519 N4 N4区间 Q-H 8(前海行8) 0.62 3.57
Dongjiaotou 东角头  13  22 37 72 79 80 B737 M241 M519 N8 Peak-time 7(高峰7) Seaside Leisure Line 1.20 4.77
Wanxia 湾厦 M493 1.55 6.32
Haiyue 海月 B737 B817 M418 M430 0.75 7.07
Dengliang 登良 M474 1.02 8.09
Houhai 后海 11  13  229 B964 M299 M429 M467 M474 M483 M493 M519 N24 Peak-time 10(高峰10) 0.95 9.04
Keyuan 科苑  13  72 B682 B964 E19 M299 M429 M474 Peak-time 10(高峰10) Peak-time 92(高峰92) Peak-time 94(高峰94) Peak-time 120(高峰120) Peak-time 121(高峰121) Peak-time 122(高峰122) Peak-time 138(高峰138) 1.35 10.39
Hongshuwan 红树湾 58 B795 B911 M313 M355 M486 M487 Peak-time 30(高峰30) Peak-time 135(高峰135) 2.25 12.64
Window of the World 世界之窗 1 21 26 32 42 43 66 70 79 90 101 113 123 204 209 222 223 234 323 324 327 338 365 369 373 383 390 392 392区间 395 B795 E10 K578 M222 M372 M388 M398 M413 M425 M433 M435 M448 M486 M487 M488 N4 N4区间 N6 N24 Peak-time 8(高峰8) Peak-time 12(高峰12) Peak-time 74(高峰74) Peak-time 93(高峰93) Peak-time 134(高峰134) Sightseeing 1(观光1) Sightseeing 4(观光4) 1.80 14.44
Qiaocheng North 侨城北 72 104 237 325 326 390 B706 B729 M486 Peak-time 62(高峰62) Peak-time 119(高峰119) 2.25 16.69
Shenkang 深康 70 72 M500 N24 1.20 17.89 Futian
Antuo Hill 安托山 7 374 0.80 18.69
Qiaoxiang 侨香 45 73 104 323 325 B611 B729 B968 M222 M312 M398 Peak-time 12(高峰12) 0.88 19.57
Xiangmi 香蜜 45 73 104 316 323 325 B689 M312 M369 M398 Peak-time 38(高峰38) 1.05 20.62
Xiangmei North 香梅北  22  38 41 45 73 104 316 323 325 B689 E12 M312 M369 M398 M441 Peak-time 38(高峰38) 1.00 21.62
Jingtian 景田 9 11 21 38 41 45 73 79 104 213 222 316 323 328 365 B613 E12 M369 M391 M392 N6 1.00 22.62
Lianhua West 莲花西 14 38 41 46 60 65 71 73 107 108 111 215 235 236 237 322 324 325 374 383 B613 K105 K359 M372 M390 M488 M499 N9 Peak-time 19(高峰19) Peak-time 38(高峰38) Peak-time 123(高峰123) 1.37 23.99
Futian 福田 3 11  GSH  Futian railway station NZQ 9 32 38 60 71 101 107 113 123 204 223 234 235 236 320 326 327 330/Airport 1(机场1) 374 395 398 B613 B709 E18 E28 K204 K318 K578 M221 M262 M363 M390 M413 M414 M435 M447 M448 N3 N4 N4区间 N9 Peak-express 18(高快18) Peak-express 20(高快20) Peak-time 15(高峰15) Peak-time 18(高峰18) Peak-time 38(高峰38) Peak-time 49(高峰49) Peak-time 58(高峰58) Peak-time 62(高峰62) Peak-time 119(高峰119) Peak-time 134(高峰134) Sightseeing 1(观光1) 0.95 24.94
Civic Center 市民中心 4 34 38 60 64 326 371 373 398 E28 M347 M390 M435 M454 M459 M500 N3 N9 Peak-express 18(高快18) Peak-express 26(高快26) Peak-time 17(高峰17) 0.88 25.82
Gangxia North 岗厦北 10 11 14 4 101 103 113 202 203 204 223 303 320 326 395 K113 K204 M363 M414 M435 M447 M448 N4 Peak-express 20(高快20) Peak-time 38(高峰38) Peak-time 49(高峰49) Peak-time 119(高峰119) 0.75 26.57
Huaqiang North 华强北 7
1 (via Huaqiang Road)[note 1]
65 67 75 80 302区间 M202 M389 M476 Peak-time 119(高峰119) 1.75 28.32
Yannan 燕南 65 80 M389 M476 0.75 29.07
Grand Theater 大剧院 1  5 
9  11  (via Hongling South)[note 2]
3 10 12 29 85 101 103 104 113 203 204 214 215 223 302 E8 K113 K204 M481 N3 N4 Sightseeing 1(观光1) Sightseeing 2(观光2) 1.60 30.67 Luohu
Hubei 湖贝  5 [a] 2 10 17 29 85 104 205 214 220 223 K113 M290 M373 M383 N21 Peak-time 73(高峰73) Sightseeing 1(观光1) 1.85 32.52
Huangbeiling 黄贝岭 5 10 27 69 85 111 205 220 223 336 363 381 382 387 E26 K113 M290 M348 M383 M445 M511 N14 N18 N21 Dameisha-holiday 1(大梅沙假日1) Peak-time 32(高峰32) Peak-time 58(高峰58) Peak-time 97(高峰97)Sightseeing 1(观光1) 1.20 33.72
Xinxiu 新秀 69 85 111 220 381 B621 K113 M383 N14 1.35 35.07
Liantang Checkpoint 莲塘口岸 1.1 36.17
Xianhu Road 仙湖路 1.9 38.07
Liantang 莲塘 8[b] 0.9 38.97
Wutong Mountain South 梧桐山南 1.7 40.67
Shatoujiao 沙头角 4.2 44.87 Yantian
Haishan 海山 1.5 46.37
Yantian Port West 盐田港西 1.2 47.57
Shenwai Senior Campus 深外高中 2.9 50.47
Yantian Road 盐田路 1.3 51.77
  1. ^ Out-of-station interchange.
  2. ^ Line 2 connects with Line 8 at Liantang station, trains on Line 2 continue their service to Yantian Road station.

Rolling Stock

Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2010–2011 Type A stock 35 201–235 Tc+Mp+M+M+Mp+Tc Manufactured by Changchun Railway Vehicles, Bombardier MITRAC traction system
Type A 2012–2015 Type A stock 17 236–252 Tc+Mp+M+M+Mp+Tc Manufactured by Changchun Railway Vehicles, Bombardier MITRAC traction system (236–239、241–252) and CRRC Qingdao Sifang traction system (240)
Type A 2019 Type A stock 5 253–257 Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Zhuzhou Electric Locomotive Works

Notes

  1. ^ Out-of-station virtual transfer to Line 1 at Huaqiang Road. This transfer will be counted as two separate journeys requiring two fares.
  2. ^ Out-of-station virtual transfer to Line 9 at Hongling South. This transfer will be counted as two separate journeys requiring two fares.

References

  1. ^ "创历史新高!21日深圳地铁总客流量达646.9万人次". stnn.cc. 2018-07-21.
  2. ^ "Caopu and Yitian Village in Futian District open June 2011". Archived from the original on 2010-12-27. Retrieved 2011-01-25.
  3. ^ "photo of ongoing construction in Shekou". Archived from the original on 2013-09-25. Retrieved 2011-01-25.