Templin Solar Park

Coordinates: 53°01′54″N 13°32′19″E / 53.03167°N 13.53861°E / 53.03167; 13.53861
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by BrownHairedGirl (talk | contribs) at 03:36, 29 August 2019 (remove links to deleted Portal:Sustainable development). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Templin Solar Park
Map
CountryGermany
LocationTemplin
Coordinates53°01′54″N 13°32′19″E / 53.03167°N 13.53861°E / 53.03167; 13.53861
StatusOperational
Commission date30 September 2012
Construction cost€205 million[1]
Owner(s)Commerz Real
Solar farm
TypeFlat-panel PV
Site area214 ha[2]
Power generation
Units operational1,500,000
Nameplate capacity128.48 MW

Templin Solar Park is a 128 megawatt (MW) photovoltaic power station, located at the former Templin military airport.[3]

History

The plant was built between 5 June and 30 September 2012. The electrical connection to the 110 kV network, via two substations operated by e.dis AG, was made in April 2013. The plant covers an area of approximately 214 ha. It consists of 1.5 million thin-film modules from the manufacturer First Solar from its factory in Frankfurt (Oder). The 114 power inverters used were supplied by German company SMA. The park was built by Bavarian company Belectric. The construction costs were €204.5 million and about 500 people were employed during its fabrication.

See also