Jump to content

Trimdon Grange Wind Farm

Coordinates: 54°42′47″N 1°25′10″W / 54.7130°N 1.41944°W / 54.7130; -1.41944
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 22:12, 27 September 2019 (top: Task 16: replaced (1×) / removed (0×) deprecated |dead-url= and |deadurl= with |url-status=;). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Trimdon Grange Wind Farm
Map
CountryEngland, United Kingdom
Locationnear Trimdon Grange, County Durham
Coordinates54°42′47″N 1°25′10″W / 54.7130°N 1.41944°W / 54.7130; -1.41944
StatusOperational
Commission dateOctober 2008
OwnerEDF Energy
Site elevation446 ft
Power generation
Units operational4 × 1.3 MW
Make and modelNordex: N60
Nameplate capacity5.2 MW

Trimdon Grange Wind Farm is an onshore wind farm near Trimdon Grange, County Durham, England. Commissioned in October 2008 it consists of four 1.3 MW Nordex N60 turbines giving a total capacity of 5.2 MW. It was developed by EDF and is operated by Cumbria Wind Farms.[1][2]

The proposed location of the wind farm caused controversy in 2004 when an agent of Tony Blair, then Prime Minister, wrote to a local action group, Trimdon Area Group Against Wind Farms, claiming that the site was unsuitable. The location is about one mile from Tony Blair's old constituency house.[3]

References

  1. ^ "Archived copy". Archived from the original on 2012-11-02. Retrieved 2015-12-11.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ http://www.thewindpower.net/wind-farm-1531-trimdon-grange-nordex-n60-1300.php
  3. ^ https://www.independent.co.uk/news/people/pandora/wind-farms-not-on-the-prime-ministers-doorstep-thanks-689504.html