Jump to content

Chongqing–Wanzhou intercity railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Frietjes (talk | contribs) at 14:15, 29 January 2018 (Clean up duplicate template arguments using findargdups). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chongqing–Wanzhou Intercity Railway
渝万客运专线
Overview
StatusOperating
LocalePeople's Republic of China
Termini
Stations7
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
History
OpenedNovember 29, 2016
Technical
Line length248 km (154 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph)
Chongqing–Wanzhou intercity railway
Simplified Chinese渝万客运专线
Traditional Chinese渝萬客運專線
Transcriptions
Standard Mandarin
Hanyu PinyinYúwàn Kèyùn Zhuānxiàn
Stations and structures

Chongqing–Wanzhou intercity railway is a high speed railway between Chongqing and Wanzhou.It is also known at the Yu-Wan Railway, which are abbreviations for Chongqing and Wanzhou. Construction started in December 2012, according to the summarizing and commending meeting of the phase II of “100-day Battle” in Chongqing Liangjiang New Area[1]. It was completed on November 29, 2016 and takes passengers from Chongqing North Railway Station to Wanzhou Railway Station in one hour. This railway forms a smaller section of two larger railway projects, the Chongqing-Xi'an High Speed Railway and the Chongqing-Zhengzhou High Speed Railway, extending from North and East from Wanzhou respectively. It was opened on the 28th of November, 2016.

Route Description

The 248-km-long Chongqing–Wanzhou railway is designed to run at a speed of 250 km/hour connecting Chongqing North Railway, Fusheng, Changshou, Changshou Lake, Dianjiang County, Liangping and Wanzhou, according to the approval from The Ministry of Railways of PRC.

  • It has been built as a double tracked electrified high speed railway.
  • It has been built to the heavy rail standard with continuous welded track on ballastless track
  • The length of the line supported on bridges or viaducts is 39.67% of the total railway length.
  • The length of the line through tunnels is 31.77% of total railway length. The longest at 10,617m and the shortest tunnel at 84m.
  • The length of the line built at grade, on ground level is 29.66%
  • The length of the roadbed within the stations is 1.9km.

Operations

The train can take passengers from Wanzhou North or Dianjiang County to urban Chongqing in 90 or 30 minutes respectively. High speed services extend to Chengdu with a travel time of 3 and a half hours.

References