Jump to content

Line 9 (Shenzhen Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Terramorphous (talk | contribs) at 20:05, 14 October 2018 (ridership update). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 9
9
Overview
Native name九号线; 九號線; Jǐu hào xiàn; gau2 hou6 sin3
StatusOperational
LocaleShenzhen, China
Termini
Stations22
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Qiaocheng East Depot Bijia Hill Stabling Yard
Rolling stockCRRC Changchun (901-929)(6A)
Daily ridership384,000 (2018 peak)[1]
History
Opened28 October 2016
Technical
Line length25.33 km (15.74 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)
Route map

Qianwan
Menghai
Yihai
Litchi Orchards
Nanyou West
Nanyou
Nanshan Book Mall
Shenzhen University South
Yuehaimen
13
Left arrow to Shenzhen Bay Checkpoint
to Shangwu Right arrow
Hi-Tech South
Hongshuwan South
Shenwan
Shenzhen Bay Park
Qiaocheng East Depot
Xiasha
Chegongmiao
Xiangmei
Jingtian
Meijing
Xiameilin
Meicun
Shangmeilin
10
Left arrow to Futian Checkpoint
to Shuangyong Street Right arrow
Maling
Bijia Hill Stabling Yard
Yinhu
Nigang
Hongling North
Yuanling
Hongling
Hongling South
Ludancun
Renmin South
Xiangxicun
Wenjin

Shenzhen Metro Line 9 opened on 28 October 2016.[2] The line runs East–West from Hongshuwan South to Wenjin. It has 10 transfer stations and is 25.33 km (15.74 mi) long, running through the city’s districts of Nanshan, Futian and Luohu. Line 9's color is grey.

Naming

Line 9 was previously known as the Meilin line (simplified Chinese: 梅林线; traditional Chinese: 梅林線; pinyin: Méilín Xiàn; Jyutping: mui4 lam4 sin3), and before that as the Neihuan line (simplified Chinese: 內环线; traditional Chinese: 內環線; pinyin: Nèihuán xiàn; Jyutping: noi6 waan4 sin3), which means an inner ring line. In December 2011 the name was changed along with the planned alignment.[3]

Construction

Construction of Line 9 started in 2012, with main stations completed in July 2014, other stations in March 2015 with tunnels planned for September 2016 and trial operation for October 2016. Shenzhen Metro Line 3 Operations was responsible for construction and planning of the line, until their merger with SZMC (Shenzhen Metro Group) in April 2011.

Segment Commencement Length Station(s) Name
Hongshuwan South — Wenjin 28 October 2016 25.33 km (15.74 mi) 22 Phase 1

Stations

Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Template:SZM stations 前湾  5  Nanshan
Template:SZM stations 梦海
Template:SZM stations 怡海
Template:SZM stations 荔林
Template:SZM stations 南油西
Template:SZM stations 南油  12 
Template:SZM stations 南山书城
Template:SZM stations 深大南
Template:SZM stations 粤海门  13 
Template:SZM stations 高新南
Template:SZM stations 红树湾南 11 0.00 0.00
Template:SZM stations 深湾 0.85 0.85
Template:SZM stations 深圳湾公园
80 339 B706 M347 M453 M463 M486 Seaside-leisure Line
1.50 2.35
Template:SZM stations 下沙
26 34 63 64 80 103 229 236 337 369 382 E4 E6 E17 E26 E37 H92 M105 M106 M133 M194 M347 M453 M463 M519 N10 Peak-express 16(高快16)Peak-time 1(高峰1) Peak-time 19(高峰19) Peak-time 58(高峰58) Peak-time 70(高峰70) Airport 2(机场2)
3.45 5.80 Futian
Template:SZM stations 车公庙 1 7 11
21 26 71 79 101 113 202 204 213 222 223 234 303 324 326 338 365 M109 M123 M172 M372 M391 M392 M413 M414 M435 M447 M448 M500 M521 M559 N4 N6 Peak-time 18(高峰18) Peak-time 62(高峰62) Peak-time 119(高峰119)
1.10 6.90
Template:SZM stations 香梅
21 65 79 107 108 213 215 222 237 325 365 B733 M109 M183 M372 M391 M441 N6
2.00 8.90
Template:SZM stations 景田 2
11 21 38 41 45 73 79 104 213 222 316 323 328 365 B613 E12 M369 M391 M392 N6
1.35 10.25
Template:SZM stations 梅景
11 12 21 44 58 67 102 201 216 235 334 B613 B689 B912 E18 M203 M204 M222 M240 M312 M358 M364 M390 M398 M460 N12 Peak-time 11(高峰11) Peak-time 22(高峰22) Airport 6(机场6)
0.90 11.15
Template:SZM stations 下梅林
44 45 60 67 201 216 222 324 334 374 B821 B912 M204 M207 M312 M460 N9 Peak-time 19(高峰19)
0.75 11.90
Template:SZM stations 梅村
44 45 60 67 201 222 324 334 374 B821 M204 M207 M312 M460 N9 Peak-time 19(高峰19)
1.25 13.15
Template:SZM stations 上梅林 4
44 45 60 102 201 216 218 222 324 334 374 B821 M204 M312 M460 N9 N12 Peak-time 19(高峰19)
0.80 13.95
Template:SZM stations 孖岭  10 
B821
0.80 14.75
Template:SZM stations 银湖  6 
4 5 7 46 201 207 218 222 336 352 374 393 B614 E11 E24 M193 M203 M240 M358 M360 M364 M435 M437 M454 M460 Dameisha-holiday 2(大梅沙假日2) Peak-time 11(高峰11) Peak-time 13(高峰13) Peak-time 19(高峰19) Peak-time 24(高峰24) Airport 6(机场6)
2.25 17.00
Template:SZM stations 泥岗
B614
0.90 17.90
Template:SZM stations 红岭北 7
5 8 9 23 57 69 79 85 222 237 303 321 323 333 336 375 385 E8 E25 M105 M123 M360 M389 M463 N16 N17 N25 Peak-express 9(高快9) Peak-time 13(高峰13)
1.15 19.05
Template:SZM stations 园岭
7 9 11 13 79 102 107 111 202 213 320 357 375 377 E12 M203 M329 M370 M401 M414 N25 U1 Peak-express 9(高快9) Peak-time 13(高峰13) Peak-time 25(高峰25)
0.70 19.75
Template:SZM stations 红岭 3
7 10 23 63 64 80 85 108 207 225 393 E8 M152 M183 M360 M401 M463 N6 N10
0.80 20.55
Template:SZM stations 红岭南
7 8 14 23 29 62 63 75 214 377 395 E25 M152 M360 M383 M401 M463 M482 N10 N14
1.00 21.55 Luohu
Template:SZM stations 鹿丹村
8 38 229 337 366 M401
0.80 22.35
Template:SZM stations 人民南
1 7 17 38 82 83 97 102 205 306 337 387 N2 N4 N7 N18 Peak-time 73(高峰73)
0.90 23.25
Template:SZM stations 向西村
5 14 69 83 97 229 336 369 381 387 395 E26 M172 M182 M360 N2 N14 N18
1.00 24.25
Template:SZM stations 文锦
5 14 69 83 97 229 312 336 381 387 395 E26 M172 M182 M360 M445 N2 N14 N18 Peak-time 97(高峰97)
0.75 25.00

Rolling stock

In 2014, Shenzhen Metro Group purchased 70 trains (420 carriages) from CNR Changchun Railway Vehicles for the future Line 7 and Line 9, in which Line 7 will use 41 while Line 9 will use 29.[4] The first train arrived in mid-March 2016. 17 trains will assume operations when the line first opens to passengers, departing every 6–8 minutes.[5]

Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2015 – 2016 A-size stock 29 0901-0929 Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Changchun Railway Vehicles

References

  1. ^ "创历史新高!21日深圳地铁总客流量达646.9万人次". stnn.cc. 2018-07-21.
  2. ^ 深圳地铁7号线和9号线10月底通车 比计划提前两个月. Retrieved 27 August 2016.
  3. ^ About name of the station which will be built in Third Phase of Shenzhen Metro (Chinese)
  4. ^ "中国北车揽30亿元深圳地铁大单 将装备7号线和9号线_深圳新闻_最全最迅速的深圳资讯—深圳新闻网". www.sznews.com. Retrieved 2016-06-11.
  5. ^ "深圳地铁9号线首列车运抵深圳明年年底通车_深圳新闻_深圳新闻网". www.sznews.com. Retrieved 2016-06-11.