Sweetwater Wind Farm
Appearance
Sweetwater Wind Farm | |
---|---|
Country | United States |
Coordinates | 32°20′20″N 100°26′42″W / 32.3388°N 100.445°W |
Status | Operational |
Owner | Duke Energy[1] |
Operators | Sweetwater Wind Power, LLC |
Power generation | |
Nameplate capacity |
|
Sweetwater Wind Farm is one of the largest wind farms in Texas. Construction of the 585 MW wind farm has proceeded in five stages, and some generating capacity is still being built.[citation needed]
Sweetwater stage 4 employs 135 Mitsubishi 1.0 megawatt wind turbines and 46 Siemens Wind Power 2.3 megawatt turbines. Its output is being sold to San Antonio’s CPS Energy under a 20-year purchase agreement.[citation needed]
Construction of Sweetwater stage 5 began in February 2007, with completion expected by December 2007. Using 35 Siemens turbines, Sweetwater 5 will have a capacity of 80 MW.[3]
See also
References
- ^ "Duke Energy buys major Texas wind farm owner". Austin American-Statesman. 2008-06-26. Retrieved 2011-08-09.
- ^ "Babcock & Brown Files to Build New Electric Transmission in Texas". Transmission & Distribution World. 2008-03-30. Retrieved 2011-08-09.
- ^ "GE unit expands wind energy portfolio" (PDF) (Press release). GE Energy. 2007-05-24. Archived from the original (PDF) on 2009-03-25.
External links