The Exchange 106

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Malaysia1963 (talk | contribs) at 23:28, 25 November 2022 (top). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Exchange 106
Menara Exchange 106
Exchange 106 in 2022
Map
Former namesMenara Platinum, Signature Tower
Alternative namesTRX 106, TRX Signature Tower
General information
StatusCompleted
TypeOffice
LocationTun Razak Exchange, Kuala Lumpur, Malaysia
Construction started2016
Completed2019
OwnerTRX City Sdn Bhd (under Minister of Finance Incorporated)
Height
Roof445.5 m (1,462 ft)[3]
Top floor397.5 m (1,304 ft)
Technical details
Floor count95
(+11 crown floors), (Total: 106 floors)[1]
Floor area453,835 m2 (4,885,000 sq ft)
Design and construction
Architect(s)Mulia Group Architects; Peter Chan (Architect of Record)
DeveloperMulia Group[4]
Main contractorMulia Group and China State Construction Engineering (M) Sdn Bhd[5]
Website
www.exchange106.my
References
[2]

The Exchange 106, also known as TRX Tower, 106 Tower, TRX 106 and Signature Tower, is a 95-story, 445.5-meter-tall supertall skyscraper in Tun Razak Exchange, Kuala Lumpur, Malaysia. It is third tallest building in Malaysia, fourth tallest building in Southeast Asia, and the 23rd tallest building in the world. The 397.5-meter building is topped with a 48-meter, 11-story high illuminated crown making it 106-story high (still 95-story) and 445.5 m (1,462 ft) tall. It is also the largest skyscraper in Malaysia by floor area with 453,835 m2 (4,885,000 sq ft).[2][6][7][8][9][10][11][12][excessive citations] The tower has a net lettable area of 240,000 square metres (2.6 million square feet).[13][14][15][excessive citations]

The Exchange 106 is currently the 23rd tallest building in the world according to the Council on Tall Buildings and Urban Habitat (CTBUH) and the third-tallest building in Malaysia as of today.[16]

As of October 2019, about 46,000 m2 (500,000 sq ft) of Exchange 106's floor space was expected to be taken up by tenants.[17] The floor space is column-less, ranges from 2,600 to 3,200 m2 (28,000 to 34,000 sq ft).[18]

Proposal and development

The skyscraper was first conceptualized when TRX was controlled by 1Malaysia Development Berhad (1MDB), a sovereign fund owned by the Government of Malaysia. On 13 May 2015, 1MDB Real Estate Sdn Bhd (1MDB RE), the master developer of TRX, and the Mulia Group announced that, through Mulia Property Development Sdn Bhd, they had signed a Sale and Purchase agreement for the development rights of the plot of land for the Exchange 106 (then known as the Signature Tower), with the land transacted at a value of RM665 million.[19] Groundwork on the Exchange 106 plot commenced on 1 March 2016, with the mat concrete foundation laid in May 2016 (see "Progress" section below).[20]

Presently, Mulia Property Development Sdn Bhd is 51% owned by the Ministry of Finance through MKD Signature Sdn Bhd and 49% by Mulia International.

Progress

The Exchange 106 was managed by the Mulia Group,[21] with structural construction carried out by the China State Construction Engineering Corporation, through its Malaysian subsidiary China State Construction Engineering (M) Sdn. Bhd.[22]

In May 2016, the tower's foundation concrete pour took place over a weekend and was the second-largest continuous concrete pour in the world.[23] In December 2017, the building was structurally topped out, 19 months after commencement, achieving an average of 3 days a floor.[24]

Exchange 106 achieved its Certificate of Completion and Compliance in September 2019.[25]

TRX shopping mall (The Exchange TRX), located at the foot of The Exchange 106, under construction in May 2019.

The construction of the TRX's shopping mall (known as The Exchange TRX) which is located at the foot of the Exchange 106 is expected to be completed by the third quarter of 2021.[26] Later on, the construction of the mall was delayed due to the strict Movement Control Order (MCO) in the country caused by the COVID-19 pandemic. The completion of the mall was pushed back to 2022.[27]

As of December 2021, the overall infrastructure of TRX is at 80 percent completion, while The Exchange TRX mall is expected to be completed in the fourth quarter of 2022.[28]

Considered the "pet project" of then prime minister of Malaysia Najib Razak, work to complete the building continued despite uncertainties that arose when his coalition, the Barisan Nasional, lost the 2018 Malaysian general election.[29]

In June 2018, the Malaysian government under Pakatan Harapan had to inject a further RM2.8 billion into the master development of Tun Razak Exchange, of which The Exchange 106 is a part, to complete the project.[30] This was after it was discovered that significant amounts of public funds were misappropriated from the master developer TRX City[31] to pay the debts of 1Malaysia Development Berhad (1MDB), which was US$7.8 billion in debt, as well as being funneled into Najib's personal bank account.[32][33]

Criticism

The tower, along with Merdeka 118, has often been referred by many Malaysians as highly unnecessary and a "national disgrace", with their presence on the Kuala Lumpur skyline "tainted" and signifying the legacy of the scandal.[34][35]

Transportation

The skyscraper is currently served only by the Kajang Line with one station, the  KG20  Tun Razak Exchange MRT underground station on site.

The underground station will also be a stop on the  PY23  Putrajaya Line (SSP), scheduled to open in December 2022 or January 2023.[citation needed] This station is one of two interchanges between the Kajang and Putrajaya MRT lines.

See also

References

  1. ^ "The Exchange 106 -The Skyscraper Center". www.skyscrapercenter.com. Retrieved 17 October 2018.
  2. ^ a b "The Exchange 106 - the Skyscraper Center".
  3. ^ "The Exchange 106 - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 26 October 2019.
  4. ^ http://www.mulia.com.my/
  5. ^ "Housing Construction".
  6. ^ "Mulia Group Malaysia - The Exchange 106". The Mulia Group Malaysia. Retrieved 1 October 2017.
  7. ^ "Big tenants for Exchange 106". www.thestar.com.my.
  8. ^ "Malaysia's new tallest building to be completed in 2018". New Straits Times. 21 December 2017. Retrieved 6 September 2018.
  9. ^ "Malaysia's upcoming tallest skyscraper, The Exchange 106, has signed up major tenants". The Straits Times. 11 January 2018.
  10. ^ "Malaysia's tallest building to be completed in 2Q18". 21 December 2017.
  11. ^ Sazili, Oleh Syalikha (22 January 2018). "Mercu tanda baharu KL, komponen TRX siap Jun". BH Online. Retrieved 6 September 2018.
  12. ^ "Exchange 106 to eclipse Twin Towers soon as nation's tallest". The Star Online.
  13. ^ "Exchange 106 shaping up to be the tallest". The Star Online. Retrieved 4 February 2018.
  14. ^ ""Ministry of Finance Malaysia - Media Release - MKD SIGNATURE SDN BHD RE: TRX TOWER"". treasury.gov.my. Retrieved 10 March 2018.
  15. ^ "Big tenants for Exchange 106". The Star Online. Retrieved 4 February 2018.
  16. ^ "The Exchange 106 - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 7 October 2021.
  17. ^ "TRX's Exchange 106 expects first tenants in December | The Star Online". www.thestar.com.my. Retrieved 5 February 2020.
  18. ^ "The EXCHANGE 106". mulia.com.my. Retrieved 25 February 2018.
  19. ^ "TUN RAZAK EXCHANGE ATTRACTS INDONESIA'S LEADING PROPERTY DEVELOPER". trx.my. 13 May 2015. Retrieved 3 February 2018.
  20. ^ "Bai Tian: China offers the best quality of construction to Malaysia, high quality of techniques and speed receive recognition". malaysianchinesenews.com. 2 February 2018. Retrieved 3 February 2018.
  21. ^ "PressReader.com - Your favorite newspapers and magazines". www.pressreader.com. Retrieved 5 February 2020.
  22. ^ "The Exchange 106 - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 5 February 2020.
  23. ^ "Exchange 106 to eclipse Twin Towers soon as nation's tallest". The Star Online. Retrieved 26 December 2017.
  24. ^ "Exchange 106 to eclipse Twin Towers soon as nation's tallest | The Star Online". www.thestar.com.my. Retrieved 5 February 2020.
  25. ^ Business, N. S. T. (2 October 2019). "Exchange 106 ready to house MNCs, first tenants expected by December". NST Online. Retrieved 5 February 2020. {{cite web}}: |last= has generic name (help)
  26. ^ "Shopping mall at TRX to be ready by Q3 2021".
  27. ^ "Opening of retail mall at TRX Exchange delayed". The Star. Retrieved 7 October 2021.
  28. ^ Aman, Azanis Shahila (1 December 2021). "TRX ramping up construction to meet revised completion targets | New Straits Times". NST Online. Retrieved 20 December 2021.
  29. ^ "Tun Razak Exchange investors were seeking clarity | The Star Online". www.thestar.com.my. Retrieved 5 February 2020.
  30. ^ June 22, Chester Tay / The Edge Financial Daily; Am +08, 2018 08:49 (22 June 2018). "Tun Razak Exchange gets RM2.8b bailout". The Edge Markets. Retrieved 20 December 2021. {{cite web}}: |first2= has numeric name (help)CS1 maint: numeric names: authors list (link)
  31. ^ June 21, Sulhi Azman / theedgemarkets com; Pm +08, 2018 20:21 (21 June 2018). "TRX City to lodge police report over RM3b fund misappropriation". The Edge Markets. Retrieved 20 December 2021. {{cite web}}: |first2= has numeric name (help)CS1 maint: numeric names: authors list (link)
  32. ^ Leong, Trinna (22 June 2018). "Malaysia to inject $950m to complete Najib's pet project TRX". The Straits Times.
  33. ^ "Govt to continue with Tun Razak Exchange, says Guan Eng | The Star Online". www.thestar.com.my. Retrieved 5 February 2020.
  34. ^ Schneider, Keith (24 July 2018). "Malaysia Seeks to Complete a $10 Billion Project Rocked by Scandal". The New York Times. Retrieved 12 October 2021.
  35. ^ Shukry, Anisah (23 October 2019). "Inside Malaysia's Tallest Skyscraper Once Roiled by 1MDB". bloomberg.com. Bloomberg News. Retrieved 12 October 2021.