Bombay, Baroda and Central India Railway: Difference between revisions
Rsrikanth05 (talk | contribs) m formatting: whitespace (using Advisor.js) |
Kanchanamala (talk | contribs) No edit summary |
||
Line 28: | Line 28: | ||
[[File:M2-162 Indian Railway Museum.jpg|thumb|350px|Bombay, Baroda, and Central India Railway train at [[National Rail Museum, New Delhi]]]] |
[[File:M2-162 Indian Railway Museum.jpg|thumb|350px|Bombay, Baroda, and Central India Railway train at [[National Rail Museum, New Delhi]]]] |
||
The '''Bombay, Baroda, and Central India Railway''' (BB&CI) was a company incorporated in 1855 to undertake the task of constructing a railway line between [[Bombay]] and [[Vadodara]] in [[India]]. BB&CI completed the work in 1864. The first suburban railway in India was started by BB&CI, operating between [[Virar]] and [[Colaba]], a station in [[Bombay Backbay]] in 1867. |
The '''Bombay, Baroda, and Central India Railway''' (BB&CI) was a company incorporated in 1855 to undertake the task of constructing a railway line between [[Bombay]] and [[Vadodara]] in [[India]]. BB&CI completed the work in 1864. The first suburban railway in India was started by BB&CI, operating between [[Virar]] and [[Colaba]], a station in [[Bombay Backbay]] in 1867. The main headquarters of the BB&CI Railway was located in Churchgate, Bombay, and the headquarters and workshops for the meter gauge tracks and services was located in Ajmer. |
||
==Electrification== |
==Electrification== |
||
The Colaba-[[Borivali]] section (37.8 km) was electrified on 5 January 1928 on the 1.5 kV [[Direct current|DC]] system. The two tracks between Colaba and [[Grant Road]] stations were electrified, while four tracks between Grant Road and [[Bandra railway station]]s were electrified. Only two suburban tracks between Bandra and Borivli were electrified in 1928, two main tracks were left for the steam locomotives. In 1933, Colaba station and two electrified tracks between Colaba and [[Churchgate railway station]]s were dismantled. In 1936, electrification was extended to the two main tracks between Bandra and Borivali stations, left earlier and the two main tracks between Borivali and Virar stations were also electrified, resulting in completion of the electrification of the [[Churchgate]]-[[Virar]] section.<ref name=r1>Rao, M.A. (1988). ''Indian Railways'', New Delhi: National Book Trust, pp.150-1</ref> |
The Colaba-[[Borivali]] section (37.8 km) was electrified on 5 January 1928 on the 1.5 kV [[Direct current|DC]] system. The two tracks between Colaba and [[Grant Road]] stations were electrified, while four tracks between Grant Road and [[Bandra railway station]]s were electrified. Only two suburban tracks between Bandra and Borivli were electrified in 1928, two main tracks were left for the steam locomotives. In 1933, Colaba station and two electrified tracks between Colaba and [[Churchgate railway station]]s were dismantled. In 1936, electrification was extended to the two main tracks between Bandra and Borivali stations, left earlier and the two main tracks between Borivali and Virar stations were also electrified, resulting in completion of the electrification of the [[Churchgate]]-[[Virar]] section.<ref name=r1>Rao, M.A. (1988). ''Indian Railways'', New Delhi: National Book Trust, pp.150-1</ref> |
||
==Later developments== |
==Later developments== |
Revision as of 20:02, 15 February 2015
Industry | Railways |
---|---|
Founded | 1855 |
Defunct | 1951 |
Headquarters | Bombay , |
Area served | Bombay Presidency and Rajasthan |
Services | Rail transport |
The Bombay, Baroda, and Central India Railway (BB&CI) was a company incorporated in 1855 to undertake the task of constructing a railway line between Bombay and Vadodara in India. BB&CI completed the work in 1864. The first suburban railway in India was started by BB&CI, operating between Virar and Colaba, a station in Bombay Backbay in 1867. The main headquarters of the BB&CI Railway was located in Churchgate, Bombay, and the headquarters and workshops for the meter gauge tracks and services was located in Ajmer.
Electrification
The Colaba-Borivali section (37.8 km) was electrified on 5 January 1928 on the 1.5 kV DC system. The two tracks between Colaba and Grant Road stations were electrified, while four tracks between Grant Road and Bandra railway stations were electrified. Only two suburban tracks between Bandra and Borivli were electrified in 1928, two main tracks were left for the steam locomotives. In 1933, Colaba station and two electrified tracks between Colaba and Churchgate railway stations were dismantled. In 1936, electrification was extended to the two main tracks between Bandra and Borivali stations, left earlier and the two main tracks between Borivali and Virar stations were also electrified, resulting in completion of the electrification of the Churchgate-Virar section.[1]
Later developments
In year 1949, after independence of India, Gaekwar's Baroda State Railway was merged in to Bombay, Baroda and Central India Railway by Government of India.
Around 1910, Bagol initially was the only Railway station on proposed Udaipur–Phulad Railway line by Bombay, Baroda and Central India Railway (BB&CI). Unfortunately due to some Government planning the work of extending the railway line via Bagol was stopped, though the railway building still exists in Bagol which is now under Forest Department.
On 5 November 1951 the Bombay, Baroda, and Central India Railway was merged with the Saurashtra Railway, Rajputana Railway, Jaipur Railway and Cutch State Railway to give rise to the Western Railway.
See also
- Frederick William Stevens, architect and engineer
- Charles Ollivant, company director
- Mumbai Suburban Railway
Notes
- ^ Rao, M.A. (1988). Indian Railways, New Delhi: National Book Trust, pp.150-1