R188 (New York City Subway car): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
the R188s are not retiring the R62As
→‎Gallery: Added a photo of the driver's console
Line 143: Line 143:
File:R188 7811-7821 Testing on Dyre Avenue Line.jpg|R188s 7811-7821 testing on the [[IRT Dyre Avenue Line]] at [[Gun Hill Road (IRT Dyre Avenue Line)|Gun Hill Road]].
File:R188 7811-7821 Testing on Dyre Avenue Line.jpg|R188s 7811-7821 testing on the [[IRT Dyre Avenue Line]] at [[Gun Hill Road (IRT Dyre Avenue Line)|Gun Hill Road]].
File:Hudson Yards (21208150530).jpg|R188 destination sign. This '''7''' train is heading toward [[Flushing–Main Street (IRT Flushing Line)|Flushing–Main Street]].
File:Hudson Yards (21208150530).jpg|R188 destination sign. This '''7''' train is heading toward [[Flushing–Main Street (IRT Flushing Line)|Flushing–Main Street]].
File:R188 Driver's Console.jpg|Driver's console of a R188 train waiting at the 34th Street–Hudson Yards station on the IRT Flushing Line
</gallery>
</gallery>



Revision as of 23:28, 31 January 2017

R188
An R188 train on the "7" train leaving 52nd Street.
Interior of an R188 car.
In service2013-present
ManufacturerKawasaki Rail Car Company
Built atYonkers, New York, US and
Kobe, Hyōgo, JP
Family nameR100-R199 R type contract series, NTT (new technology train)
Constructed2011–2016
Entered service
  • November 9, 2013 (under CAP)
  • December 15, 2013
Number built506 (126 new cars, 380 conversions)
Number in service506 (308 in revenue service during rush hours)
Formation5-car sets (A-C-B-B-A)
6-car sets (A-C-B-B-B-A)
Fleet numbersConversion Sets: 7211-7590
New Sets: 7811-7898
New "C" Cars: 7899-7936
Capacity176 (A car)
188 (B & C cars)
OperatorsNew York City Subway
DepotsCorona Yard[1][2]
Service(s) assigned"7" train[3][4]
Assignments as of December 23, 2023
Specifications
Car body constructionStainless steel with fiberglass end bonnets
Train length11 car train: 564.63 feet (172.10 m)
Car length51.33 feet (15.65 m)
Width8.60 feet (2,621 mm)
Height11.89 feet (3,624 mm)
Platform height3.6458 ft (1.11 m)
Doors6 per car
Maximum speed55 mph (89 km/h) Service
70 mph (110 km/h) Design
Weight"A" car: 73,332 pounds (33,263 kg)
"B" and "C" cars: 67,721 pounds (30,718 kg)
Traction systemBombardier MITRAC propulsion system,
3-Phase AC Traction Motors Model 1508C
Power output150 hp (111.855 kW) per motor axle
4,500 hp (3,355.649 kW) per 11 car train
Acceleration2.5 mph/s (1.1 m/s2)
Deceleration3.0 mph/s (1.3 m/s2)
(full service),
3.2 mph/s (1.4 m/s2) (emergency)
Power supplyThird rail
Electric system(s)625 V DC
Current collector(s)Contact shoe
Braking system(s)Dynamic braking propulsion system; tread brake system
Track gauge4 ft 8+12 in (1,435 mm)

The R188 is an A Division new technology (NTT) car constructed by the Kawasaki Heavy Industries Rolling Stock Company for the New York City Subway. The MTA is displacing the R62As from the 7 and <7>​ services with these cars to automate the IRT Flushing Line. The R188 is part of both the fourth and fifth generation of New York City Subway A Division rolling stock. 380 R142As are converted to R188s, along with deliveries of 126 new R188 cars. The R188s comprise fleet numbers #7211-7590 and #7811-7936.

In addition to providing six extra 11-car trains for the 7 Subway Extension, the R188s will allow twenty R62A cars to be freed up for the other IRT services.

Timeline and composition of trainsets

All planned
orders
# of conversion cars # of new C cars # of new A & B cars
Total Total Total
Main
order
Option
order
Main
order
Option
order
Main
order
Option
order
Original order[5] 140 46 320[note 1]
10 130 3 43 20 300
2010–2014
Capital
Program[6]
360 46 100
10 350 3 43 20 80
Modification[7] 380 46 80
10 370 3 43 20 60

At the time that the R188 order was placed, forty R62A 11-car trainsets were assigned to the 7 service. The R188 order originally consisted of 186 new cars, as well as 131 converted R142A cars compatible with communication-based train control (CBTC) and an additional 189 R142A conversion kits for MTA, totaling a possible 506 cars, or in other words, 46 11-car trains. Given this number, it can be deduced that 230 of these cars will be arranged in 5-car sets while the remaining 276 cars will be arranged in 6-car sets.[5] Six extra R188 trainsets were ordered in conjunction with CBTC installation and 7 Subway Extension.

According to the 2010–2014 capital plan, 146 new cars were to be purchased. Of these new cars, 110 cars would go to make up 10 new 11-car trains, while the remaining 36 cars were to be "C" cars that would go to expanding 36 CBTC upgraded R142A 5-car sets (360 existing cars) to 6-car length. The original planned total of 46 11-car trains (506 cars) would still result from this order.[6]

In the latest revision, however, only 88 new cars were to be purchased to form 8 new 11-car trains, with 38 "C" cars, rather than ten 11-car trains. Likewise, the number of conversion cars was altered to 370. This change was made with the knowledge that only two ten-car R62A growth sets for the mainline IRT would be needed, as opposed to the projected four sets, and thus the MTA and Kawasaki opted to convert two additional R142A train sets in place of manufacturing two new sets. The MTA also decided to have Kawasaki perform all of the conversions at the Yonkers plant instead of 207th Street Shop as part of that contract modification.[7]

Description

Contract, delivery, and revenue service

The R188 contract was awarded in spring 2010 to Kawasaki Heavy Industries, who won by default since only two manufacturers qualified and Bombardier Transportation opted not to bid on the contract citing the small order and large requirement for engineering resources. The contract was specified at $87,094,272 for the base order, which consisted of 33 cars (23 new cars and 10 conversions), and $384,315,168 for the option order, which consisted of 473 cars (123 new cars, and 350 conversions) for a total price of $471,409,440.

According to a February 2012 update, the MTA had expected to have 8 conversion sets in service by the time that the 7 Subway Extension is opened for revenue service. In addition, the breakdown of the trainsets has been disclosed. Operationally, the R188s are coupled as such: A-C-B-B-A+A-B-B-B-C-A; where dashes signify link bars and the addition sign denotes couplers. Thirty-eight R142A B cars, therefore, will be converted into R188 "C" cars, in addition to the 38 deliveries of new "C" cars (not including the "C" cars in the eight new 11-car sets).[8]

The 10 converted R142A cars from the base order (#7211-7220) were completed in December 2011 at Kawasaki's Yonkers facility, and were delivered for testing on the Flushing line in 2012. The 23 new cars from the base order (two eleven-car sets, #7811-7832, and one conversion set "C" car, #7899) were completed in mid-2012, delivered in November 2013, and entered service in December 2013. The 66 new option cars (#7833-7898) were also completed in mid-2012 and have been delivered, while the remaining 37 new cars and the 370 conversions were set to be converted and delivered from February 2014 until the 4th quarter of 2015.[9][10]

On November 9, 2013, the first R188 train, consisting of cars #7811-7821, were placed in service on the 7 train as part of its 30-day revenue acceptance test.[11] After successful completion, it entered revenue service by December 15, 2013. By July 2014, the delivery schedule had slipped by about 6–7 months.[12] However, delivery of the cars sped up; all remaining R188 cars were expected to be delivered by the end of July 2016, but the last R188 cars were delivered in late June 2016.[13]

Features

The R188s are equipped with the latest control system, HVAC, and public address system to guarantee the utmost safety and passenger comfort. They are similar to the R142As, but can only be compatible with the converted R142As that feature CBTC.

Like the R142, R142A, and R143, the R188s feature the electronic strip map with all stops on the 7 line with an indicator that can be set to either a local or express train.

In June 2016, one set of R188s was retrofitted with green circle & red diamond LED signs on its destination signs, similar to those on the R62As originally used on the 7, as well as the R62As currently on the 6. This is presumably due to the fact that passengers cannot visually differentiate between an express train and local train, despite the announcements and digital signage.[14] It is unknown if the remainder of the R188 fleet will be retrofitted with this feature.

Gallery

See also

Notes

  1. ^ This was the total of 131 converted R142A cars compatible with communication-based train control (CBTC) and an additional 189 R142A conversion kits. The option order of 473 cars was broken down as follows: 163 new R188 cars, conversion of 124 R142/R142A cars, and providing 186 conversion kits of R142/R142As.

References

  1. ^ "Car/Yard Assignments" (PDF). Archived from the original (PDF) on December 5, 2019.
  2. ^
    • 'Subdivision 'A' Car Assignment Effective December 19, 2021'. New York City Transit, Operations Planning. December 17, 2021.
    • 'Subdivision 'B' Car Assignment Effective December 19, 2021'. New York City Transit, Operations Planning. December 17, 2021.
  3. ^ "Subdivision 'A' Car Assignments: Cars Required December 23, 2023" (PDF). The Bulletin. 67 (2). Electric Railroaders' Association. December 2023. Retrieved March 22, 2024.
  4. ^ 'Subdivision 'A' Car Assignment Effective December 23, 2023'. New York City Transit, Operations Planning. December 23, 2023.
  5. ^ a b http://www.thejoekorner.com/cars/r34188sol.pdf
  6. ^ a b Page 92
  7. ^ a b http://i42.tinypic.com/r2oqb8.jpg Modification to purchase document
  8. ^ http://mta.info/mta/news/books/pdf/120227_1400_CPOC.pdf
  9. ^ Page 100 (Document), or Page 108 (PDF reader)
  10. ^ DVV Media Group GmbH. "CBTC trials on New York's Flushing Line". Railway Gazette. Retrieved August 24, 2014.
  11. ^ "MTA | news | New Subway Cars Being Put to the Test". New.mta.info. November 18, 2013. Retrieved August 24, 2014.
  12. ^ http://web.mta.info/mta/news/books/pdf/140728_1200_CPOC.pdf
  13. ^ Rebecca Harshbarger and Sheila Anne Feeney (January 26, 2016). "Subway cars of future include Wi-Fi, cameras, charging stations". am New York.
  14. ^ "Untitled". R36_9346. June 14, 2016.