BTS Skytrain

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 96.247.231.20 (talk) at 07:08, 24 September 2013 (→‎See also: add ridership stats & info). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bangkok Mass Transit System (BTS)
บริษัท ระบบขนส่งมวลชนกรุงเทพ จำกัด (มหาชน) (บีทีเอส)
File:BTS LOGO.gif
Overview
OwnerBangkok Metropolitan Administration (BMA)
Mass Rapid Transit Authority of Thailand
(Bearing-Samut Prakan/Mo Chit-Saphan Mai Extension)
LocaleBangkok, Thailand
Transit typeRapid transit
Number of lines2
Number of stations34
Daily ridership600,000[1]
Operation
Began operation5 December 1999
Operator(s)Bangkok Mass Transit System
Public Company Limited
Number of vehicles47
Technical
System length30.95 km (19.23 mi)
Track gauge1,435 mm (4 ft 8+12 in) (standard gauge)
Average speed35 km/h (21.75 mph)
Top speed80 km/h (49.71 mph)

The Bangkok Mass Transit System, commonly known as the BTS Skytrain (Thai: รถไฟฟ้าบีทีเอส rot fai fa BTS), is an elevated rapid transit system in Bangkok, Thailand. It is operated by Bangkok Mass Transit System Public Company Limited (BTSC) under a concession granted by the Bangkok Metropolitan Administration (BMA). The system consists of 34 stations along two lines: the Sukhumvit Line running northwards and eastwards, terminating at Mo Chit and Bearing respectively, and the Silom Line which plies Silom and Sathon Roads, the Central Business District of Bangkok, terminating at the National Stadium and Wongwian Yai. The lines interchange at Siam Station and have a combined route distance of 55 km. The system is formally known as the Elevated Train in Commemoration of HM the King's 6th Cycle Birthday (รถไฟฟ้าเฉลิมพระเกียรติ 6 รอบ พระชนมพรรษา).

Besides the BTS, Bangkok's metro system also comprises the underground railway line MRT, and the elevated Suvarnabhumi Airport Link (SARL), serving several stations in the city before reaching the airport.

Map

History

Skytrain approaching Sala Daeng Station
Interior of a train.

Bangkok's first attempt at building an elevated rail network was the Bangkok Elevated Road and Train System, which was terminated in 1998 after only 10% had been completed.

The BTS system (the elevated metro system owned by Bangkok Metropolitan Administration) was initially referred to as the Lavalin Skytrain because it was to be designed using the Vancouver SkyTrain as a model adopting the technology developed by SNC-Lavalin. Due to political interference, the concession with Lavalin was cancelled in 1992, in spite of Bangkok's chronic traffic congestion. The Thai Government focused on increasing road and expressway infrastructure in an attempt to combat congestion. However, this had less than the desired impact as the number of cars on the road increased dramatically. The lines considered under the skytrain project became later the basis for the MRT system and are mainly underground.

In the early 1990s, foundations for the Lavalin Skytrain were constructed in the middle of two bridges spanning the Chao Phraya river. The Taksin bridge now supports the Silom line to Thon Buri, completed in April 2009. The supports at Phra Pok Klao bridge remain unused but may be utilised as part of the MRT's future Purple Line.

Shortly after it became clear that the Lavalin Skytrain was stalled, then-governor Major General Chamlong Srimuang asked his deputy Captain Kritsada Arunwong na Ayutthaya to create a new feeder system with a route along Sukhumvit and Silom Road. Krisda, who in the same period was elected governor, and his team from Bangkok Metropolitan Administration (BMA) managed to find an investor to build it. Krisda also convinced all to let the city supervise the project. The investor founded Bangkok Transit System Corporation (BTSC) and this company successfully financed the system and grew it from a feeder system to a full mass transit project. Siemens as supplier of the railway technology and the Thai contractor Italian Thai Development built the system for BTSC.

The "Skytrain" name was given later by the press.

Originally, the Skytrain depot was to be built underneath Lumphini Park, but due to widespread objections from Bangkok residents it was constructed on a parcel of land located along Phahonyothin Road, replacing the old Northern/Northeastern bus terminal (Mo Chit). The current depot at Mo Chit is a part of the proposed 'Bangkok Terminal' project, where a large complex comprising a new regional bus terminal, park and ride facility and other commercial development can be built directly above it.

Thanayong Public Company Limited (SETTYONG,[2] Thai: บริษัท ธนายง จำกัด (มหาชน)) had a 28.21% stake in BTSC when the Skytrain began, and therefore in its early days the system was sometimes referred to as the "Thanayong Skytrain".

The Skytrain system was officially opened on 5 December 1999 by Princess Maha Chakri Sirindhorn. It initially had lower-than-predicted ridership, with 200,000 passenger trips per day. Ticket revenue was only enough to meet the trains' operating cost, and not sufficient to service construction loans. However, the Skytrain's daily passenger numbers have steadily increased since then. On 9 December 2005, more than 500,000 single trips were made on the Skytrain in a single day for the first time. As of September 2012, the Skytrain serves around 600,000 passengers on an average day, with a peak of 715,000, and is upgrading to a fleet of 35 four-car trains.[3]

The company implemented a contactless ticketing system in 2007 named 'BTS SmartPass', and plans to allow both BTS and Airport Link passengers to use their RFID smart cards as single ticketing system not before 2014. A one-ticket system for BTS and MRT will be expected by 2015.[4]

  • 5 Dec 1999: Sukhumvit Line: Mo Chit – On Nut; Silom Line: National Stadium – Saphan Taksin
  • 15 May 2009: Silom Line: Saphan Taksin – Wong Wian Yai
  • 12 Aug 2011: Sukhumvit Line: On Nut – Bearing
  • 12 Jan 2013: Silom Line: Wong Wian Yai – Pho Nimit[5] – Talat Phlu

To travel to Pho Nimit and Talat Phlu, you currently have to change platforms and trains at Wong Wian Yai.

Station layout

Exterior view of Wongwian Yai Station
The upper platform at Siam interchange station, for north- and west-bound trains

All of the system's stations are elevated and constructed on three levels.[6] The street level provides access to the station proper via stairs and often escalators. Supporting utility equipment (generators, water tanks, etc.) are usually located at this level on traffic islands.

The first elevated level of the stations contains the ticket booths, some small kiosk-like shops and access control gates. The second level (and third at Siam station) is again accessed with stairs and escalators and contains the platforms and rails. With the exception of Siam Station, the stations follow a side platform layout. Siam Station utilizes island platforms to facilitate cross-platform interchange between the two lines. Additionally, many stations have ramps and elevators to allow passengers who use wheelchairs to access the ticketing hall and platforms from the street. The distances between doors are equal throughout the train, regardless of whether they are in the same or different cars, and the locations where the doors will be after the train has stopped are marked on the platform. The platforms are built to accommodate trains of six cars, but trains of only three or four cars are in operation. Security personnel are stationed at every platform and ticketing hall. For safety reasons,[clarification needed] there are often signs at the escalators: "Please stand on the right of the escalator and hold the handrail".

Three Skytrain stations, Sala Daeng, Asok and Mo Chit, are interchanges with the underground MRT system. Saphan Taksin station is connected to the adjacent Sathon pier where the Chao Phraya Express Boat services call. Many stations are linked by 'Skybridges' (overhead pedestrian walkways) to neighbouring buildings and public amenities.

Consumption of food or drinks is forbidden past the ticketing gate or on the Skytrain.

Platform screen doors will be installed at the On Nut, Phrom Phong, Asok, Chit Lom, Siam, Phaya Thai, Victory Monument, Sala Daeng and Chong Nonsi by 2013.[7]

Ticketing

Ticketing machine at Mo Chit Station

For single-trip and stored-value ticket holders fares are calculated according to distance, but adult / student / tourist passes for limited / unlimited train rides are also available. Next to the magnetic fare cards, which require replacement once every two years, the Skytrain has adopted near-field contactless technology in its ticketing system, with the intent of becoming compatible with the system presently used in the MRT. [citation needed]

In May 2012, the new stored-value ticket called Rabbit Card was launched instead of the old one. Rabbit Card is a brand new electronic payment card system that allows holders to pay for the fee of BTS as well as other Bangkok's mass transits like MRT and BRT with only one card. However, Rabbit Cards will not be able to be used with MRT and BRT for now. It is planned to be available within 2012,[needs update] but no exact time informed by those mass transit companies yet. Not only be able to pay for mass transit fees, Rabbit Cards can also be used to pay for other services and restaurants that associated with BTS, for example, McDonald's, Burger King, Starbucks, etc.[8]

Stations and lines

At its opening, the BTS had twenty-three stations on its two lines: seventeen on the Sukhumvit Line and six on the Silom Line, with both lines interchanging at Siam. Three and five additional stations have since opened on the Silom and Sukhumvit lines respectively.

BTS Skytrain Lines
Line Colour Date opening Original path Current termini Length /km Number of stations Daily passengers
Sukhumvit Line Light Green 1999 Mo Chit Bearing 22.25 22.5 600,000
Silom Line Dark Green 1999 National Stadium Talat Phlu 8.7 11.5

Route extension

In 2002, cabinet of then Prime Minister Thaksin Shinawatra amended a law in order to allow a private firm to finance the cost of operating the train system, while the government would take care of all the civil engineering work. On 18 October 2005, with no approval from the central government forthcoming, Bangkok Metropolitan Administration (BMA) decided to complete the 2.2 km Silom Line route extension (Krung Thonburi Station and Wongwian Yai Station) using its own budget. Construction began on 13 December 2005 with completion originally expected within a year, but problems with tendering for the signalling system repeatedly pushed back the schedule, with the extension finally opening on 15 May 2009. However, Saphan Taksin Station (originally designed to be only a temporary station), and the river crossing itself, has only one track, which has caused repeated delays during rush hour.

A second extension from On Nut Station to Bearing Station started construction in 2007, and was opened on 12 August 2011.

Further extensions have been proposed from Mo Chit Station to Saphan Mai Station, from Bearing Station to Samut Prakan Province, from Wongwian Yai Station to Bang Wa Station and from National Stadium Station to Phran Nok Station. The first stations on the Bang Wa extension, Pho Nimit opened on 12 January 2013 and Talat Phlu opened on 14 February 2013, with the rest of the line to be completed in stages by the end of 2013.[9] At present you must change platforms and trains at Wongwian Yai to travel beyond it.

Further extension for the BTS can be summarized as follows:

  • Under construction:
    • Silom Line: Wong Wian Yai – Pho Nimit – Talat Phlu – Wutthakat – Bang Wa (terminating at Phetkasem Road) – 5.25 km Under Construction, to open in 2013.[10][11]
File:Bearing Station.jpg
Bearing Station, current terminus of Sukhumvit Line
    • Sukhumvit Line: Bearing – Samut Prakan Province – 10.6 km Signed contract with Ch. Karnchang.[12] Construction started April 2012, to open in 2017.
  • Planned:
    • Mo Chit – Saphan Mai – 11.4 km. (construction to start 4Q 2013[13])
    • National Stadium – Yot Se (terminating at Bamrungmueang Road) – 6.8 km.
    • Samut Prakan (Bang Ping) – Bang Pu.
    • Bang Na – Suvarnabhumi Airport (terminating at future South Passenger Terminal of Suvarnabhumi Airport, light rail train). Start construction in 2014 and to be open in 2017.[14]
    • Saphan Mai – Khlong 6.

BTS Group Holdings will likely be bringing on more lines in the further through financing built out of its BTS Rail Mass Transit Growth Infrastructure Fund after it got approval from the Thai Securities and Exchange Commission in March 2013. The IPO is expected to raise $2.1 billion, the largest in Thailand's history.[15]

BTS Skytrain Extension lines
Line Colour Date opening Original path Current termini Length /km Number of stations Status
Sukhumvit Line extension Light Green 2017 Bearing Kheha Samut Prakan 10.6 7 Under Construction
Mo Chit Saphan Mai 11.4 12 Planned
Kheha Samut Prakan Bang Pu Planned
2017 Udom Suk Suvarnabhumi Airport Planned
Saphan Mai Eastern Outer Ring 8 Planned
Silom Line extension Dark Green 2013 Talat Phlu Bang Wa 5.25 2 Under construction
National Stadium Yot Se 6.8 1 Planned
All of BTS Skytrain stations in the future (includes MRT stations) map

  MRT Dark Green Line: Lam Luk Ka - Bang Pu/Suvarnabhumi Airport/Wat Sri Noi
  MRT Light Green Line: Yot Se - Wat Pradu
  MRT Blue Line: Tha Phra - Lak Song
  MRT Purple Line: Khlong Bang Phai - Rat Burana
  MRT Orange Line: Bang Khun Non - Min Buri
  MRT Pink Line: Nonthaburi Government Center - Min Buri
  MRT Yellow Line: Lat Phrao - Samrong

Rolling stock

Siemens Train, service for Sukhumvit Line
Changchun Train, service for Silom Line

The BTS Skytrain uses two variations of Electric Multiple Unit rolling stock. All operate on 1435 mm rail gauge (standard gauge). All trains have 4 doors on each side per car, an air-conditioning unit, and LCD monitors for public announcement and advertising. The power supply for all trains is at 750 V DC from the third rail.

Siemens Train

The rolling stock of BTS Skytrain, in use since the opening of the line in 1999, consist of 35 Siemens Modular Metro trains from Siemens AG. All trains have 3 cars, 2 motor cars and 1 trailer on center. The Sukhumvit line used to employs 20 trains, and the Silom Line has 15. After the 12 new Bombardier trains were delivered for the Silom line. The 15 Siemens trains that were in service on the Silom moved to the Sukhumvit line. To increase capacity, in October 2010, Siemens agreed to provide an extra car for each train, making them up to four cars.[16] These extra cars are now in operation in October 2012 on Sukhumvit line. [1]

The Silom Line cars have been modified to support a signaling system from Bombardier Transportation since the extension from Saphan Taksin to Wong Wian Yai.

Changchun trains

The BTSC ordered 12 new trains (12 sets of 4 cars) from Changchun Railway Vehicles Co. Ltd., though their design will be modified to the existing BTS's Siemens Modular Metro. The new trains were delivered in June 2010 to serve on the Silom Line, which cannot increase train frequency because of a single track bottleneck at Saphan Taksin station, though the number of passengers increased after the Wong Wian Yai and Krung Thonburi stations were opened. These trains consist of 2 motor cars and 2 trailer cars and will feature LCD TVs for public announcements and advertising. An advanced digital voice announcement (DVA) and passenger information systems will be installed. In 2013 these trains were all moved to Sukhumvit line.

Ridership

The first years of operations saw little local ridership, though foreign tourists patronized the line. This was because the bus system offered longer routes, was subsidized, despite infamous traffic jams and pollution. Connectivity and culture were major issues, the line had few direct ramps into malls, also lacked escalators, locals avoiding walking up stairs in muggy Bangkok, Thais also did not have a culture of urban walking as filthy and narrow sidewalks were seized by hawkers and merchants; thus was cultural lesson for the system designers. Little by little, escalators were installed, side bridges added, patronage increased. With the opening of Siam Paragon Mall in 2004, at the time Thailand's most luxurious mall Siam station drew in massive crowds who then utilized the train. The redevelopment of the Ratchaprasong and Siam districts and well as "skywalks" fostered growing walkability of Bangkok. The once pleasantly empty train did not leave standing room and reduced outside visibility, especially in near Siam Station. Ridership continued to increase with incremental expansion of the line, from 529,466 weekday passengers in 3Q11.[17] to 573,041 in January 2012[17], to 668,302 in Aug 2013, surpassing 600,000 passengers daily for all of August.[18]

See also

References

  1. ^ http://www.nationmultimedia.com/business/BTS-Group-Holding-Plc-30176106.html
  2. ^ "Tanayong Company Profile". Archived from the original on 7 May 2010.
  3. ^ Wiriyapong, Nareerat (29 August 2012). "Sukhumvit BTS line to get four-car trains in October". Bangkok Post. Retrieved 29 November 2012.
  4. ^ Mahitthirook, Amornrat (19 February 2012). "One-ticket system for BTS and MRT expected by 2015". Bangkok Post. Retrieved 29 November 2012.
  5. ^ http://www.nationmultimedia.com/politics/Sukhumbhand-woos-commuters-30198011.html
  6. ^ BTSC. "Station Structure". BTS official web site. Bangkok Mass Transit System Public Company Limited. Archived from the original on 9 October 2008. Retrieved 3 November 2008. {{cite book}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  7. ^ "BTS stations to get platform doors". Bangkok Post. 17 September 2012. Retrieved 17 September 2012.
  8. ^ http://www.bangkokbts.com/bts-rabbit-cards.html
  9. ^ http://metroparksathorn.com/htm/2013/01/12/bts-skytrian-starts-its-new-station-pho-nimit-today-and-comimg-more-near-to-metro-park-sathorn/
  10. ^ "Silom line's extension faces delay". The Nation. Bangkok. 1 May 2012. Retrieved 15 November 2012.
  11. ^ "Skytrain extension opening delayed". Bangkok Post. 27 November 2012. Retrieved 29 November 2012.
  12. ^ "Ch. Karnchang wins Green Line bid". Bangkok Post. 14 November 2012. Retrieved 15 November 2012.
  13. ^ http://www.bangkokpost.com/news/local/328687/traffic-snarls-to-last-five-years Traffic snarls to last five years
  14. ^ http://www.mcot.net/cfcustom/cache_page/402320.html
  15. ^ Maierbrugger, Arno (17 March 2013). "Thailand's largest ever IPO a done deal". Inside Investor. Retrieved 18 March 2013.
  16. ^ "Bangkok's Skytrain increases train fleet – International Railway Journal". 12 October 2010. Archived from the original on 21 October 2010. Retrieved 12 October 2010. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help); no-break space character in |title= at position 41 (help)
  17. ^ a b http://www.nationmultimedia.com/business/BTS-Group-Holding-Plc-30176106.html
  18. ^ http://nationmultimedia.com/breakingnews/Skytrain-passengers-hit-600000-in-August-30215214.html

External links