Jump to content

BBL Pipeline

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 20:41, 13 September 2019 (Operating company: Task 16: replaced (1×) / removed (0×) deprecated |dead-url= and |deadurl= with |url-status=;). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Balgzand Bacton Line
Location of Balgzand Bacton Line
Location of Balgzand Bacton Line
Location
CountryNetherlands, United Kingdom
Coordinates52°53′20″N 3°05′43″E / 52.8890°N 3.0954°E / 52.8890; 3.0954
General directioneast–west
FromBalgzand Gas Plant, Anna Paulowna, Netherlands
Passes throughNorth Sea
ToBacton Gas Terminal, United Kingdom
General information
Typenatural gas
PartnersGasunie, Uniper, Fluxys
OperatorBBL Company
Commissioned2006
Technical information
Length235 km (146 mi)
Maximum discharge16 billion cubic meters
Diameter36 in (914 mm)
No. of compressor stations1
Compressor stationsAnna Paulowna

The BBL Pipeline (Balgzand Bacton Line, BBL) is a natural gas interconnector between the Netherlands and the United Kingdom.

History

Laying the pipeline between the compressor station at the Balgzand Gas Plant at Grasweg in Anna Paulowna (province of North Holland) and Bacton Gas Terminal started on 14 July 2006. The pipeline became operational on 1 December 2006.

Technical description

The overall length of pipeline is 235 kilometres (146 mi) of which around 230 kilometres (140 mi) is offshore. The pipeline's diameter is 36 inches (910 mm) and working pressure is 135 standard atmospheres (13,700 kPa). The initial capacity is 16 billion cubic meters (bcm) per year, which will be increased to 19.2 bcm by the end of 2010 by installing a fourth compressor at the compressor station at Anna Paulowna.[1] The pipeline has a regulatory exemption from the two-ways gas flow until October 2018. Until this, the direction of gas flow is from the Netherlands to the UK.[2] The overall cost of the project was around 500 million.

Operating company

The BBL was developed and operated by the BBL Company. The main shareholder of the company is Gasunie with 60% of the shares, and Uniper (through Uniper Ruhrgas BBL B.V.) and Fluxys both own 20%. Russian Gazprom had an option for 9%, in exchange for a 9% share of Nord Stream AG.[3] The BBL Pipeline would allow Gazprom to supply additional gas to the British market through the Nord Stream pipeline.

See also

References

  1. ^ "BBL pumps up the volume". Upstream Online. NHST Media Group. 19 August 2008. Retrieved 19 August 2008.
  2. ^ Adomaitis, Nerijus (6 October 2016). "UK extends BBL pipeline's exemption from two way gas flows". Reuters. Retrieved 23 October 2016.
  3. ^ "Gazprom and Gasunie sign agreement on cooperation within Nord Stream and BBL projects" (Press release). Gazprom. 6 November 2007. Archived from the original on 4 March 2008. Retrieved 6 November 2007.