Jump to content

Beecroft railway station

Coordinates: 33°44′59″S 151°03′59″E / 33.749607°S 151.066310°E / -33.749607; 151.066310
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by InternetArchiveBot (talk | contribs) at 01:11, 17 July 2017 (Rescuing 1 sources and tagging 0 as dead. #IABot (v1.4.2)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Beecroft
Northbound view in February 2006
General information
LocationWongala Crescent, Beecroft
Coordinates33°44′59″S 151°03′59″E / 33.749607°S 151.066310°E / -33.749607; 151.066310
Owned byRailCorp
Operated bySydney Trains
Line(s)Main Northern
Distance26.90 kilometres from Central
Platforms2 (1 island)
Tracks3
ConnectionsBus
Construction
Structure typeGround
Other information
StatusStaffed
Station codeBCF
WebsiteSydney Trains
History
Opened17 September 1886
Rebuilt7 March 1892
ElectrifiedYes
Services
Preceding station   Sydney Trains   Following station
Template:Sydney Trains lines

Beecroft railway station is located on the Main Northern line, serving the Sydney suburb of Beecroft. It is served by Sydney Trains T1 Northern Line services.

History

The original Beecroft station opened on 17 September 1886 approximately adjacent to the current Beecroft tennis courts, relocating north to its present site on 7 March 1892.[1][2] The disused down platform was demolished in the early 1990s. A disused dock platform for produce was located to the west of the platform.

As part of the North Sydney Freight Corridor project, an electrified passing loop opened to the west of the station in June 2016.[3][4][5][6]

Platforms and services

Platform Line Stopping pattern Notes
1 services to Penrith & Richmond via Macquarie Park & North Sydney [7]
2 services to Hornsby [7]

References

  1. ^ Beecroft Station NSWrail.net
  2. ^ Home Beecroft Cheltenham History Group
  3. ^ Epping to Thornleigh Third Track Transport for NSW
  4. ^ Leighton Contractors & TfNSW in Alliance to deliver Epping to Thornleigh Third Track Project Leighton Contractors 8 March 2013
  5. ^ Leighton & Abigroup win Epping to Thornleigh Third Track contract Archived 2 April 2013 at the Wayback Machine Rail Express 20 March 2013
  6. ^ "Northern Sydney Freight Corridor Update" Railway Digest December 2014 pages 28-29
  7. ^ a b "T1: North Shore line timetable". Transport for NSW.