Dandong–Dalian intercity railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Just a guy from the KP (talk | contribs) at 02:25, 24 May 2016 (opeartion → operation). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Dandong-Dalian Intercity Railway
Overview
Native name丹大城际铁路
Statusin operation
LocaleLiaoning, China
Termini
Stations18
Service
TypeHigh-speed rail
Services1
Operator(s)China Railway High-speed
History
Opened17 December 2015
Technical
Line length292 km (181 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (160 mph)
Route map

Dandong
Left arrow Shenyang–Dandong Intercity Railway to Shenyang South
Tongxing
Dandong West
Qianyang
Donggang
Beijingzi
Gushan
Left arrow Xiuyan-Zhuanghe Railway to Xiuyan
Landian
Zhuanghe North
Zhuanghe West
Huayuankou
Chengzitan
Pikou
Dengshahe
Guangningsi
Jinzhou
Left arrow Harbin–Dalian High-Speed Railway to Harbin West
Dalian North
Dalian

Dandong–Dalian Intercity Railway is a Chinese high-speed railway within Liaoning Province, connecting the coastal cities of Dandong and Dalian.

Overview

Dandong–Dalian Intercity Railway is broken down into three segments: Dandong - Zhuanghe section, Zhuanghe - Dengshahe section and the Dengshahe - Dalian section. It will have a total length of about 292 km, of which 94 km will be in the Dandong prefectural area, 198 km will be in the Dalian region.[1] The total investment is estimated to be about 14.7 billion yuan with a design speed of 200 km/h of primarily double tracked electrified railway. The construction period was estimated to take about three and a half years[2] and was started on 17 March 2010. It started operation on 17 December 2015[3]

History

Planning Phase

  • 21 April 2009 - Liaoning Provincial Government and the Ministry of Railways signed the "On the strengthening of Liaoning railway construction Minutes", which set a railway design speed of 250 km/h along a double track line electrified railway for passengers and freight.
  • 28 June 2009 - Ministry of Railways jointly with the provincial government reported to the National Development and Reform Commission about their studies on this project.[4]
  • 19–21 December 2009 - Ministry of Railways held preliminary design review meeting, formally adopting the project preliminary design review.

Construction Phase

  • 17 March 2010 - Dandong - Zhuanghe section started.[5]
  • 2 December 2010 - First bridge girder erection in the Donggang, Liaoning, area, well north of the town of Wolong with several large bridges completed.[6]

Operation Phase

  • 17 December 2015 - Start operation.

References

  1. ^ "大连到丹东一个半小时 丹大快速铁路计划工期三年半" (in Chinese). 丹东新闻网. Retrieved 7 July 2011.
  2. ^ "丹大快速铁路开工进入倒计时" (in Chinese). 大连新闻网. Retrieved 28 December 2009.
  3. ^ "丹大快铁开通运营 1小时生活圈又大了" (in Chinese). 沈阳网. Retrieved 20 December 2015.
  4. ^ "丹大客运专线年底前开工 1小时45分到达大连" (in Chinese).
  5. ^ "沈丹铁路客运专线和丹大快速铁路正式开建" (in Chinese).
  6. ^ "丹大快速铁路昨日"上梁"" (in Chinese).