Jump to content

Daxing line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 193.182.144.54 (talk) at 05:04, 26 November 2016 (Stations). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Daxing line
Overview
StatusOperational
Termini
Stations11
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing MTR Corporation Limited
Depot(s)Nanzhaolu
History
Opened30 December 2010
Technical
Line length21.7 km (13.5 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed100 km/h (maximum service speed)
Route map

Gongyi Xiqiao
above is line 4
Xingong
Xihongmen
Gaomidianbei
Xinfeng river
Gaomidiannan
Zaoyuan
Qingyuan Lu
Huangcun Xidajie
Huangcun Railway Station (subway)
Huangcun railway station (China Railway)
Jinghu,
Jingjiu railways etc.
Beijingdaxing
Xiaolong river
Yihezhuang
Tiantang river
Biomedical Base
Tiangongyuan
Nanzhaolu depot

The Daxing Line of the Beijing Subway (Chinese: 北京地铁大兴线; pinyin: běijīng dìtiě dàxīng xiàn) is a rapid transit line that connects the southern Daxing District of the city with the subway network. It extends Line 4 south from its southern terminus at Majialou, on the 4th Ring Road in Fengtai District, to Nanzhao Lu, beyond the 6th Ring Road in Daxing District. The Daxing Line is about 21.7 km in length with 18 km underground.[3][4] Of the 12 stations, only Xihongmen is above the surface.[5] Full-scale construction began in 2007 and the line was opened on December 30, 2010, 14:00 local time.[6]

Route & Service

Though the Daxing Line is classified as a distinct line,[7] the Beijing MTR Corporation Limited operates through-train service on Lines 4 and Daxing, making the two lines effectively one line for travelers.[b] With the opening of the Daxing Line on December 30, 2010, the Beijing MTR Corporation Limited now runs two types of train service on the combined Line 4-Daxing Line route:

  • A full-route loop that covers the entire Line 4 and Daxing Lines. This train service runs from Anheqiao North, the northern terminus of Line 4, to Tiangongyuan, the southern terminus of the Daxing Line.
  • A partial-route loop that covers the entire Line 4 route plus one stop on the Daxing Line. This service runs from Anheqiao North to Xingong, the northernmost stop on the newly opened Daxing Line. Travelers wishing to proceed further south on the Daxing Line would have to switch to a south-bound full-route service train.

Service routes

Stations

Daxing Line and Line 4 stations, from north to south (with transfer points):

Service
routes
Station Name
English
Station Name
Hanzi
Transfer
Bus Transfer
Location
Line
Anheqiao North 安河桥北 482 512 575 Haidian
  Line 4
Beigongmen 北宫门 303 330 331 332 346 375 384 563 584 594 601 观光3 特5 特10
Xiyuan 西苑 331 332 333 375 384 393 432 438 476 482 498 508 509 534 563 579 584 594 601 636 671 697 952 968 特5 特6 特10 特18 特19 夜8 运通106 运通108 运通114 运通118
Yuanmingyuan Park 圆明园 331 432 438 498 508 579 594 601 664 697 观光3 特18 特19 运通124
East Gate of Peking University 北京大学东门 307 331 355 365 375 429 438 498 562 579 594 601 614 681 697 699 717 731 982 观光3 特4 特18 特19 运通105 运通110 运通126
Zhongguancun 中关村 26 302 307 332 333 355 365 384 466 498 579 584 601 614 681 697 699 717 731 740 913 982 983 特4 特9 特18 夜8 运通105 运通106 运通110 运通113
Haidianhuangzhuang 海淀黄庄  10  302 304 307 332 355 365 386 584 611 614 630 634 653 671 681 697 699 717 特4 特15 特18 夜8 夜9 运通105 运通106 运通109
Renmin University 人民大学 26 79 300 300快 302 323 332 355 361 365 384 425 584 614 651 653 658 660 695 697 699 717 731 特4 特8 特15 特18 夜8 夜30 运通101 运通105 运通106 运通201
Weigongcun 魏公村 26 332 645 651 653 658 660 697 717 特4 特15 特18 夜8 运通103 运通105 运通106
National Library 国家图书馆  9  86 92 332 563 588 653 658 695 697 717 特4 特18 特19 夜8 运通105 运通106
Beijing Zoo 动物园 7 15 16 19 27 45 65 87 102 103 105 107 111 347 360 360快 362 534 563 632 695 697 特4 特19 夜8 运通104 运通105 运通106
Xizhimen 西直门  2   13  Beijing North (北京北站) 7 16 26 27 87 105 111 332 347 360 362 375 438 534 563 632 651 特15 夜8 夜14 夜21 运通104 运通105 运通106 专6 Xicheng
Xinjiekou 新街口 7 47 105 111 508 夜36
Ping'anli 平安里  6  3 13 22 38 42 88 105 107 111 118 332 409 701 特13 夜3 夜4 夜10 夜21
Xisi 西四 3 13 22 38 42 88 101 102 103 105 109 124 332 409 612 特13 夜4 夜10 夜13
Lingjing Hutong 灵境胡同 22 38 46 68 88 102 105 109 夜4 夜10
Xidan 西单  1  1 15 22 52 70 88 99 102 105 109 332 特13 夜1 夜4 夜10
Xuanwumen 宣武门  2  7 9 15 22 44 67 70 102 105 109 332 673 特2 特4 特7 特13 特14 夜4 夜5 夜10
Caishikou 菜市口  7  5 6 48 57 70 102 105 109 381 特5 特14 夜7 夜4 夜10 夜18 专13
Taoranting 陶然亭 40 59 133 381 特14 夜4 夜18 夜23 专13
Beijing South Railway Station 北京南站  14 

Beijing South (北京南站)

20 84 102 106 133 343 381 458 485 529 652 665 特5 特17 夜15 夜17 夜24 Fengtai
Majiapu 马家堡 51 66 72 485 501 529 998 特14 夜18 运通103 运通125
Jiaomen West 角门西  10  51 72 474 501 529 556 646 998 特14 夜18 运通125 专26
Gongyixiqiao 公益西桥 377 474 511 556 646 825 990 运通125 专26
Xingong 新宫 353 369 474 556 827 829 954 运通115 专59 Fengtai
  Daxing line (through operation to Line 4)
Xihongmen 西红门 381 454 470 474 483 646 829 993 专97 专169 Daxing
Gaomidian North 高米店北 631
Gaomidian South 高米店南 专24
Zaoyuan 枣园 410 631快 829 841 842 844 937 940 954 968
Qingyuanlu 清源路 410 456 631 631快 829 841 940 947 954 968 969
Huangcunxidajie 黄村西大街 410 456 631 631快 829 840 940 947 954 968
Huangcun Railway Station 黄村火车站 Huangcun (黄村站) 366 366快 369 631 631快 829 947 957 968 969
Yihezhuang 义和庄
Biomedical Base 生物医药基地 827 842
Tiangongyuan 天宫院 827 829 842

History

  • June 1, 2008: Construction began on Daxing Line. Completion set for the end of 2011.[8]
  • November 16, 2008: Completion date moved up to December 28, 2010.[9]
  • April 20, 2010: Completion date moved again to October 28, 2010.[6]
  • December 28, 2010: Daxing Line opened.

Notes

a. ^ Line 4 ridership included.
b. ^ See "北京京港地铁有限公司". Mtr.bj.cn. 2010-12-29. Retrieved 2011-01-05. (Chinese) & "Beijing MTR Corporation Limited". Mtr.bj.cn. 2010-09-27. Retrieved 2011-01-05. (English)