Jump to content

Line 13 (Beijing Subway)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 206.255.12.219 (talk) at 13:40, 17 August 2018 (→‎Stations (from West to East)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 13
 13 
Overview
Other name(s)M13 (planned name)
City Railway (Chinese: 城市铁路)
City Rail (Chinese: 城铁)
Light Rail (Chinese: 轻轨)
StatusOperational
LocaleDongcheng, Chaoyang, Changping, Haidian, and Xicheng districts
Beijing
Termini
Stations16
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd
Depot(s)Huilongguan Depot[1]
Daily ridership745,300 (2014 Avg.)
939,300 (2014 Peak)[2]
History
OpenedSeptember 22, 2002
Technical
Line length40.5 km (25.2 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

Up arrow line 2 outer
Left arrow line 2 inner
1301 Xizhimen
Beijing North railway station
Jingzhang ICR etc.
Zhuan river crossing
Xueyuannanlu (under planning)
1302 Dazhong Si
Line 12 (to be opened 2024)
1303 Zhichun Lu
Left arrow inner – outer Right arrow
1304 Wudaokou
Qinghua Donglu Xikou (under planning)
Wanquan river crossing
Qing river crossing
1305 Shangdi
Qinghe railway station
Line 19 branch of Phase 2 (planning)
Xi'erqi (old site)
closed in 2010
1306 Xi'erqi
1307 Longze
1308 Huilongguan
1309 Huoying
Huilongguan depot
Jiancaichengdong (under planning)
connects Line 5
1310 Lishuiqiao
Qing river crossing
1311 Beiyuan
Line 17 crossing
Beixiao river crossing
1312 Wangjingxi
Line 17 (to be opened 2024)
1313 Shaoyaoju
Left arrow outer – inner Right arrow
Xiaoyue river crossing
Line 12 (to be opened 2024)
1314 Guangximen
1315 Liufang
Left arrow line 2 outer
1316 Dongzhimen
line 2 inner Down arrow

Line 13 train entering Wudaokou

Line 13 of the Beijing Subway (Chinese: 北京地铁13号线; pinyin: běijīng dìtiě shísānhào xiàn), is a metro line that serves the northern suburbs of Beijing. On a map, Line 13's route is shaped like an inverted U that arcs north of the city and connects residential suburbs in Haidian, Changping and Chaoyang Districts with the 2nd Ring Road and Line 2 at Xizhimen and Dongzhimen. With the exception of Template:BJS stations, all of Line 13's tracks and stations are located on the surface or elevated above ground. The line is 40.9 km (25.4 mi) and 15 of its 16 stations are on the surface. Line 13's color is   yellow. During rush hours, the section between Xizhimen and Wudaokou Stations is the second most congested section in the Beijing subway network, operating at 130% capacity.[3]

Fare

Platform sign at Xizhimen Subway Station marking Dazhongsi-bound Line 13 train

Starting fare of RMB(¥) 3.00 that increases according to the distance fare scheme introduced in December 2014.

Hours of operation

Wudaokou Station

The first trains depart from Template:BJS stations and Template:BJS stations at 5:35am. The last trains to go the full-distance and reach the other terminus depart from Xizhimen and Dongzhimen at 10:42pm. In addition, Line 13 offers later night trains from either terminus that travel half of the full route. The last train to leave Xizhimen, departs at 11:45pm and ends its journey at Huilongguan at 12:09am. The last train to leave Dongzhimen, departs at 11:45pm and ends its journey at Huoying at 12:09am. For the official timetable, see.[4] The frequency of trains on Line 13 vary from 3.5 minutes per train during the morning rush hour (6:20am–9:40am) to 5 minutes per train during the evening rush hour (4:40pm–8:40pm) to 10-11.5 minutes per train after 10:50pm. For full listing of train frequency, see.[5]

Route

Line 13's route is shaped like a horseshoe over northern Beijing. From Template:BJS stations in Xicheng District, Line 13 heads north, running alongside the Beijing-Baotou Railway into Haidian. After three stops in the bustling university district -- Template:BJS stations, Template:BJS stations (transfer to Line 10) and Template:BJS stations—Line 13 leaves the 5th Ring Road and enters the suburbs of northern Haidian. At Template:BJS stations, Line 13 meets the Changping Line, and turns east, following the southern edge of Changping District for three stops (Template:BJS stations, Template:BJS stations, and Template:BJS stations), before turning to the southeast. It enters Chaoyang District at Template:BJS stations (transfer to Line 5) and curls southwest after Template:BJS stations onto the Beijing-Chengde Expressway. At Template:BJS stations, Line 13 intersects with Line 15. After entering the 3rd Ring Road at Template:BJS stations, the line runs straight south, along the remnants of the eastern earthen wall to Liufang. Then, Line 13 goes underground to Template:BJS stations in Dongcheng District where transfers are available to Line 2 and the Airport Express.

Stations (from West to East)

Station
Station Name Connections Nearby Bus Stops Travel Time Distance
km
Location
English Chinese
style="background:#Template:BJS color; color:black"|1301 Template:BJS stations 西直门  2   4  Beijing North railway station VAP 7 16 21 26 27 44 80 87 105 111 332 347 360 362 375 387 438 534 563 618 632 651 691 693 694 特12 特15 夜8 夜14 夜20 夜21 运通104 运通105 运通106 专6 0:00 0.0 0.0 Xicheng
style="background:#Template:BJS color; color:black"|1302 Template:BJS stations 大钟寺 80 87 88 94 300 302 315 361 425 606 658 695 特8 夜30 运通101 运通201 0:03 2.8 2.8 Haidian
style="background:#Template:BJS color; color:black"|1303 Template:BJS stations 知春路  10  79 88 304 311 386 579 601 630 653 671 751 夜9 0:05 1.2 4.0
style="background:#Template:BJS color; color:black"|1304 Template:BJS stations 五道口 86 307 331 375 398 508 549 630 运通126 专12 0:08 1.9 5.9
style="background:#Template:BJS color; color:black"| Template:BJS stations 清华东路西口  15 
style="background:#Template:BJS color; color:black"|1305 Template:BJS stations 上地 447 449 521 681 909 运通123 运通205 专28 专29 专60 专85 0:13 4.9 10.8
style="background:#Template:BJS color; color:black"| Qinghe Railway Station 清河站
style="background:#Template:BJS color; color:black"|1306 Template:BJS stations 西二旗  Changping  320 333 362 509 521 544 570 636 902 963 运通112 运通114 专82 专85 0:16 2.4 13.2
style="background:#Template:BJS color; color:black"|1307 Template:BJS stations 龙泽 428 441 463 519 543 625 996 专102 专103 0:21 3.8 17.0 Changping
style="background:#Template:BJS color; color:black"|1308 Template:BJS stations 回龙观 460 461 557 560 636 681 880快 887 专89 专101 专102 专121 0:24 1.4 18.4
style="background:#Template:BJS color; color:black"|1309 Template:BJS stations 霍营  8  ( Bcr  S2 Huairou–Miyun via HKP) 371 462 478 551 558 606 607 681 专21 专42 专52 0:28 2.1 20.5
style="background:#Template:BJS color; color:black"| Template:BJS stations 建材城东路
style="background:#Template:BJS color; color:black"|1310 Template:BJS stations 立水桥  5  301 430 464 465 558 621 751 905 966 984 BRT3(快速公交3) BRT3区(快速公交3区) 运通117 运通128 专81 昌平22 昌平27 昌平52 0:33 4.8 25.3 Chaoyang
style="background:#Template:BJS color; color:black"|1311 Template:BJS stations 北苑 466 484 530 596 621 653 695 966 特11 夜26 运通128 专20 专81 专107 0:36 2.3 27.6
style="background:#Template:BJS color; color:black"|1312 Template:BJS stations 望京西  15  471 538 547 571 851 854 866 882 905 928 970快 985 987 运通110 专112 0:44 6.7 34.3
style="background:#Template:BJS color; color:black"|1313 Template:BJS stations 芍药居  10  119 515 547 567 696 942快 专22 0:47 2.2 36.5
style="background:#Template:BJS color; color:black"|1314 Template:BJS stations 光熙门 130 300 302 379 419 547 596 671 847 916快 942快 980快 特8 夜18 夜30 运通104 0:49 1.1 37.6
style="background:#Template:BJS color; color:black"|1315 Template:BJS stations 柳芳 104 110 116 123 130 夜24 0:51 1.1 38.7
style="background:#Template:BJS color; color:black"|1316 Template:BJS stations 东直门  2   Capital Airport  3 18 24 44 75 106 107 117 123 130 131 132 359 401 404 413 416 418 612 635 850 850快 852 915 915快 916 916快 918 935 935快 942快 966 980 980快 特2 特12 夜6 夜10 夜20 夜32 0:53 1.8 40.5 Dongcheng
  • The infill Template:BJS stations Station on Line 13 will be opened in 2021.
  • The infill Qinghe Railway Station on Line 13 will be opened at the end of 2019.
  • The opening time of the infill Jiancaichengdonglu Station is unknown.

History

Beijing Subway AFC ticket Line 13

Line 13 was opened in two phases: The western section between Xizhimen and Huoying was opened on September 28, 2002; the eastern section from Huoying to Dongzhimen was opened on January 28, 2003. Despite being numbered 13, the line was only the third subway line to enter into operation. It was the first Beijing Subway line to adopt Yikatong, the electronic farecard, at the end of 2003.

Segment Commencement Length Station(s) Name
Xizhimen — Huoying 28 September 2002 20.5 km (12.74 mi) 9 Western section
Huoying — Dongzhimen 28 January 2003 20.0 km (12.43 mi) 7 Eastern section
Xi'erqi (new) 25 December 2010 Infill station 1 Xi'erqi replacement project
Xi'erqi (old) Decommissioned -1

Rolling stock

Current

A type DKZ5 Line 13 train
  • DKZ5 trainsets #H401, #H403-H456
  • DKZ6 trainset #H402

The rolling stock maintenance facility is located at Huilongguan. From mid-2008 to early 2009, all Line 13 trains were converted from four cars per train to six cars per train.

Former

The DK4 trainsets, originally built in the early 1970s by the Changchun Car Company, were delivered to Pyongyang Metro in anticipation of its opening in 1973. Some of them were returned to China in 1998 and were used on Line 13 when it opened in 2002 until they were eventually replaced by newer DKZ5 and DKZ6 trainsets (it is unknown if they were returned to Pyongyang).

  • DK16 trainsets #H115-H118
  • DKZ1 trainset #H302
  • DKZ10 trainset #H457

Trainset number H457 has exited service; this train was fraught with quality issues and came in a different livery than other trains.

  • M trainset #H301
  • BD8 trainset #H303

References

  1. ^ 地铁10号线万柳车辆段封顶. 2007-08-26. Archived from the original on 2013-12-14. Retrieved 2009-02-04. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  2. ^ "Official Ridership". Beijing Subway. Archived from the original on 2013-03-22. Retrieved 2013-03-10. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  3. ^ 我市轨道交通网络化运营效果凸显. Beijing Municipal Transportation Committee (北京市交通委员会). 2013-02-07. Archived from the original on 2014-01-09. Retrieved 2013-09-15. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help); templatestyles stripmarker in |publisher= at position 45 (help)
  4. ^ [1] Archived October 24, 2008, at the Wayback Machine
  5. ^ [2] Archived October 5, 2008, at the Wayback Machine