Meyersdale Wind Farm

Coordinates: 39°48′16″N 78°59′27.6″W / 39.80444°N 78.991000°W / 39.80444; -78.991000
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by InternetArchiveBot (talk | contribs) at 04:35, 27 January 2018 (Rescuing 1 sources and tagging 0 as dead. #IABot (v1.6.2)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Aerial photo of the wind farm.

The Meyersdale Wind Farm is a wind farm located in Meyersdale, Somerset County, Pennsylvania with 20 NEG Micon/Vestas 1.5 MW wind turbines that began commercial operation in December 2003.[1] The wind farm has a combined total nameplate capacity of 30 MW, enough to power about 10,000 homes.[1] The project was constructed by NextEra Energy Resources, based in Florida.[2]

See also

References

  1. ^ a b Wind Farms in Pennsylvania Pennsylvania Wind Working Group, accessed March 1, 2010.
  2. ^ FPL Energy announces plans for 30-megawatt wind farm in Pennsylvania Archived 2010-03-01 at the Wayback Machine FPL Energy press release, July 15, 2003. Accessed March 1, 2010.

39°48′16″N 78°59′27.6″W / 39.80444°N 78.991000°W / 39.80444; -78.991000