Jump to content

Kennedy Energy Park

Coordinates: 21°S 145°E / 21°S 145°E / -21; 145
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 18:10, 2 January 2021 (Task 18 (cosmetic): eval 2 templates: hyphenate params (2×);). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Kennedy Energy Park
Map
Country
  • Australia
Coordinates21°S 145°E / 21°S 145°E / -21; 145
StatusProposed
Construction began2018
Owner(s)Windlab
Solar farm
TypeFlat-panel PV
Wind farm
TypeOnshore
Site usageFarm Land
Rotor diameter
  • 136 m (446 ft)
Power generation
Units planned12 × 3.45 MW
Nameplate capacity50 MW
External links
Websitekennedyenergypark.com.au

Kennedy Energy Park is a proposed wind, solar and storage hybrid power station located approximately 20 km south east of Hughenden and 290 km southwest of Townsville in Queensland.

Stage one of the project is a “proof-of-concept” commenced construction 2018, consisting of 30 MW of wind turbines, 20 MW of single axis tracking Solar Panels, and 2 MW of Li ion battery storage, costing $120 million to build and expected to be operational in 2020.[1]

Stage two is expected to be capable of producing 1200 MW of renewable energy, costing $2 Billion and hoped to commence construction before the end of the decade.[2]

See also

References

  1. ^ "50MW Wind, Solar and Storage hybrid facility approved". Kennedy Energy Park. Retrieved 28 July 2016.
  2. ^ "$120m outback Queensland hybrid renewable energy farm gets stage one approval". ABC. Retrieved 28 July 2016.