Pujiang line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:51, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Pujiang line
 Pujiang 
Overview
Other name(s)M8s, Phase 3 of Shanghai Metro Line 8 (planned name)
Native name浦江线
StatusOperational
OwnerShanghai Shentong Metro Group Co., Ltd.
LocalePujiang, Minhang District, Shanghai
Termini
Stations6
Service
TypeRubber-tyred metro
SystemShanghai Metro
Operator(s)Shanghai Keolis Public Transport Operation Management Co. Ltd.
Rolling stockBombardier Innovia APM 300[1] 4-car trains[2]
History
OpenedMarch 31, 2018; 6 years ago (2018-03-31)
Technical
Line length6.689 km (4.16 mi)
Number of tracks2
CharacterElevated
Operating speed80 km/h (50 mph)[1]

The Pujiang line of Shanghai Metro (simplified Chinese: 上海轨道交通浦江线; traditional Chinese: 上海軌道交通浦江線; pinyin: Shànghǎi Guǐdào Jiāotōng Pǔjiāng Xiàn) is an automated, driverless, rubber-tired Shanghai Metro line in the town of Pujiang in the Shanghainese district of Minhang. It was originally conceived as phase 3 of Shanghai Metro Line 8, but afterwards was constructed as a separate line, connecting with Line 8 at its southern terminus, Shendu Highway.[3] The line opened for passenger trial operations on March 31, 2018.[4][5][6] It is the first automated, driverless people mover line in the Shanghai Metro, and has 6 stations with a total length of 6.689 kilometres (4.156 mi).[3] It is colored grey on station maps.[5]

The line is operated by Shanghai Keolis Public Transport Operation & Management Co. Ltd. (Chinese: 上海申凯公共交通运营管理有限公司), a joint venture owned by Keolis and Shanghai Shentong Metro Group for at least five years after opening.[7][8]

Opening timeline

A map of the Pujiang Line drawn to scale.
Segment Commencement Length Stations
Shendu Highway — Huizhen Road 31 March 2018 6.689 km (4.16 mi) 6

Stations

Station name Connections Distance
km
Location
English Chinese
Template:SHM stations 沈杜公路  8  Bus rapid transitFengpu Line 0.00 0.00 Pujiang, Minhang
Template:SHM stations 三鲁公路 2.00 2.00
Template:SHM stations 闵瑞路 1.00 3.00
Template:SHM stations 浦航路 0.80 3.80
Template:SHM stations 东城一路 1.20 5.00
Template:SHM stations 汇臻路 1.60 6.60

Rolling stock

Train interior

The Pujiang line uses rubber-tyred Bombardier Innovia APM 300 trains. The trains have 4 cars each, totaling 51 metres (167 ft) in length, with capacity for 566 passengers per train.[2] On 13 January 2017, Bombardier delivered the first out of 44 autonomous people movers to Shanghai.[1]

References

  1. ^ a b c "Bombardier delivers automated people mover to Shanghai Shentong Metro". www.eurotransportmagazine.com. Retrieved 2017-02-21.
  2. ^ a b 闵行 无人驾驶的浦江线年底将试运营,杜行、鲁汇地区交通出行将更便捷. jfdaily.com (in Chinese). Retrieved 2017-12-28.
  3. ^ a b 轨交8号线三期取名“浦江线” 将与沈杜公路站接驳_大申网_腾讯网. sh.qq.com (in Chinese (China)).
  4. ^ 17号线、9号线三期、浦江线进入全线运营跑图演练--上海频道--人民网. sh.people.com.cn (in Chinese).
  5. ^ a b 注意!轨交浦江线预计明年一季度开通试运营!. news.163.com (in Chinese (China)). (Notice: Pujiang Line to begin trial operations in first quarter of 2018.)
  6. ^ 全自动无人驾驶!浦江线3月31日通车 全天运营约17小时. CNR.cn (in Chinese (China)).
  7. ^ "Shanghai metro line 8 phase 3 | Shanghai Keolis". shkeolis.com.
  8. ^ "Shanghai Keolis: Who We Are". shkeolis.com.