Mount Emerald Wind Farm
Mount Emerald Wind Farm | |
---|---|
Country | Australia |
Coordinates | 17°11′S 145°22′E / 17.18°S 145.37°E |
Status | Proposed |
Construction cost | 500 million |
Owner(s) | |
Wind farm | |
Type | Onshore |
Hub height | 90 m (295 ft) |
Rotor diameter | 100 m (328 ft) |
Rated wind speed | 50 km/h (13.9 m/s) |
Power generation | |
Units operational | 75 |
Nameplate capacity | 180 MW |
Annual net output | 580 GWh |
External links | |
Website | http://mtemeraldwindfarm.com.au |
Mount Emerald Wind Farm is a proposed 180 MW wind power station on Mount Emerald approximately 8 km WNW of Tolga, and 49 km SW of Cairns. The project is a joint venture between Port Bajool and Ratch Australia Corporation Limited. Ratch Australia bought the project from Transfield Services in July 2011.[1]