Jump to content

Woolnorth Wind Farm

Coordinates: 40°41′06″S 144°43′01″E / 40.685°S 144.717°E / -40.685; 144.717
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Mmunji1 (talk | contribs) at 07:29, 10 April 2016 (cat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Woolnorth Wind Farm
Map
Country
  • Australia
LocationWoolnorth, Tasmania
Coordinates40°41′06″S 144°43′01″E / 40.685°S 144.717°E / -40.685; 144.717
Commission date2002, 2004, 2007
OwnersHydro Tasmania and Guohua Energy Investment Co. Ltd
Power generation
Units operational62
Nameplate capacity140 MW (190,000 hp)

Woolnorth Wind Farm is a wind power development, comprising two wind farms, at the Woolnorth property at Woolnorth (which includes the location known as Cape Grim), in the far north-west of Tasmania, Australia. Both wind farms are operated by Woolnorth Wind Farm Holdings, a joint venture between Hydro Tasmania (who own a 25% share) and Shenhua Group (75% share).[1]

Bluff Point Wind Farm was constructed in two stages. The first consisted of six Vestas 1.75 MW (2,350 hp) turbines and was commissioned in 2002. Stage two, commissioned in 2004, expanded the wind farm with a further 31 of the same turbines, for a total generating capacity of 65 MW (87,000 hp).[2]

Studland Bay Wind Farm was commissioned in 2007 and consists of 25 Vestas V90 3 MW (4,000 hp) turbines, for a total capacity of 75 MW (101,000 hp).[2]

Tourism to the Wind Farm is conducted through Woolnorth Tours.

See also

References

  1. ^ "Agreement announced with Shenhua Group". Hydro Tasmania. 17 November 2014. Retrieved 18 December 2014.
  2. ^ a b "Wind power". Hydro Tasmania. Retrieved 18 December 2014.