Jump to content

Airbus A220

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by HuffTheWeevil (talk | contribs) at 02:11, 30 January 2016 (Removed some instances of announced). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

CSeries
The CS100 prototype at Mirabel on its first flight
Role Narrow-body jet airliner
National origin Canada
Manufacturer Bombardier Aerospace
First flight CS100: 16 September 2013[1]
CS300: 27 February 2015[2]
Introduction Planned: 2nd quarter of 2016 (CS100) with SWISS[3]
Planned: second half of 2016 (CS300) with airBaltic[4]
Status CS100: in production/not yet in service
CS300: early production/test phase
Produced 2012-present
Number built 6 CS100, 1 CS300 as of November 2015[5]

The Bombardier CSeries is a family of narrow-body, twin-engine, medium-range jet airliners currently under development by Canadian manufacturer Bombardier Aerospace. The CSeries models are the 110-seat CS100 and the 135-seat CS300. These were initially named C110 and C130, respectively. In certification documentation, the CSeries family is designated Bombardier BD-500, with suffix -1A10 for the CS100 and -1A11 for the CS300.[6]

The CS100 version of the CSeries is to compete with the Embraer E195-E2. The CS300 version of the CSeries is to compete with the Boeing 737 MAX 7, Airbus A319 NEO, and Irkut MC-21-200.[7] Bombardier states the CSeries will burn about 10% less fuel per trip than these competitors.[8]

The CS100 took its first flight on 16 September 2013. The CS100 was awarded an initial type certification by Transport Canada on 18 December 2015. Entry into service for the CS100 is expected in 2016. The CS300 first flew on 27 February 2015, and is to enter service approximately six months after the CS100.

Development

Background

During the demise of Fokker, Bombardier considered purchasing that company in order to gain access to the Fokker 100 100-seat short-haul aircraft. Citing an irreconcilable "clash of corporate cultures", Bombardier's Executives and Board eventually decided against the purchase and ended discussions in February 1996.[9][10]

The Bombardier BRJX, or "Bombardier Regional Jet eXpansion", was a project for a larger regional jet than the Canadair Regional Jet. Instead of 2–2 seating, the BRJX was to have a wider fuselage with 2–3 seating, and underwing engine pods. It was projected to seat 80 to 120 passengers, abutting the smallest narrow-body jetliners, like the 2–3 DC-9/MD-80/Boeing 717 or the 3–3 A318/737-500/737-600. The project was shelved by Bombardier in favour of stretching the CRJ700 into the CRJ900.

Meanwhile, the 72-seat Embraer E-170 came to market (production began in 2002), followed by the 110-seat E-195. Both models were widely adopted, and Bombardier had no product to compete with them in that capacity range.

CSeries

In July 2004, Bombardier announced the development of the CSeries family of airliners to replace the cancelled BRJX project. The CSeries would be larger than the current Canadair Regional Jets, and capable of carrying 110 to 130 passengers. For the first time, Bombardier would be competing directly with the smallest airliners from Boeing and Airbus. At the time, Bombardier expected the aircraft to be available by 2013.

In March 2005, Bombardier's board promoted the aircraft to airlines to gather advance orders. Two models were offered: the C110 with layouts from 100–125 seats, and the C130 with layouts from 120–145 seats. The CSeries would feature new, more fuel-efficient engines and a higher percentage of composite materials in its fuselage,[11] a strategy similar to that used on the wide-body Boeing 787 Dreamliner and Airbus A350 XWB.

The new aircraft would seat passengers in a 2–3 arrangement in coach and a 2–2 arrangement in business/first class, similar to the Boeing 717. With the 2–3 arrangement, 80% of the seats would be aisle or window seats, contrary to 'middle' seats (seats set between two other seats). The aircraft would have under-wing turbofans. The CSeries' cross section was designed to give enhanced seating comfort for passengers, with features like broader seats and armrests for the middle passenger and larger windows at every seat to give every passenger the physical and psychological advantages of ample natural light.

In May 2005, Bombardier secured agreements with the Federal Government of Canada, the Provincial Government of Quebec, and the Government of the United Kingdom for support and loans for the CSeries project. The Canadian government has committed US$350 million in financing; the British government has committed US$300 million. The program will cost about $3.5 billion, and Bombardier will share the cost with suppliers and governments.[12]

The fuselage was to be built by China Aviation Industry Corporation (AVIC)'s affiliate Shenyang Aircraft Corporation.[11] Final assembly of the aircraft was to be at Mirabel Airport, Mirabel, Quebec, outside Montreal.[13] Substantial portions of the aircraft were to be constructed at Bombardier facilities in Belfast, Northern Ireland.[14]

On 31 January 2006, Bombardier announced it would not go forward with plans to develop the CSeries after it had failed to secure significant orders to that point. It stated that it would keep a small team of roughly 50 employees working on the CSeries marketing plan, and would include other risk-sharing partners in the program.[15][16] With the CSeries on hold, Bombardier began work on the 100-seat CRJ1000 regional jet.

Restarting programme

CSeries display model, presented during the 2008 Farnborough Airshow.

On 31 January 2007, Bombardier announced that work on the aircraft would continue.[17] In November 2007, Bombardier selected the Pratt & Whitney Geared Turbofan (now PW1000G) to be the exclusive powerplant for the CSeries.[18] On 22 February 2008, the Board of Directors authorized Bombardier to offer formal sales proposals of the CSeries family to airline customers.[19]

On 13 July 2008, in a press conference on the eve of the opening of the Farnborough Airshow, Bombardier Aerospace formally launched the CSeries, with a letter of interest for 60 aircraft (including 30 options) from Lufthansa. The final assembly of the aircraft would be done at a new assembly facility to be built beside the existing one where the CRJ700 and CRJ900 are assembled in Mirabel, north of Montreal.[20] Ghafari Associates was retained to develop the Montreal manufacturing site to accommodate CSeries production.[21] The CSeries aircraft will use the Rockwell Collins Pro Line Fusion avionics suite, an integrated cockpit system which incorporates 15 inch displays, with comprehensive navigation, communications, surveillance, engine-indicating and crew-alerting system (EICAS), and aircraft maintenance systems.[22]

The CSeries is designed for the 100- to 149-seat market category. Bombardier estimated this market to be 19,333 aircraft,[23] representing more than $250 billion revenue over the next 20 years. Bombardier expects to be able to capture up to half of this market with the CSeries.[24] In 2009, first flight for the CSeries was expected in 2012.[25]

In 2009, Mongolian airline Eznis Airways was reported to have signed a letter of interest for seven CSeries aircraft.[26] Qatar Airways had previously been in talks with Bombardier, but broke off talks in 2009 after disagreeing on terms.[27] An unnamed lessor was understood to be in talks for 40 aircraft.[28] On 11 March 2009, Bombardier obtained the first firm orders for the CSeries. Lufthansa, who originally had signed a letter of interest for 60 aircraft, firmed up an order for 30. The aircraft are to be operated by Lufthansa subsidiary Swiss International Air Lines.[29]

Renamed models

In March 2009 Bombardier redesignated the C110 and C130 to CS100 and CS300, respectively.[30] The models were offered in normal and extended range (ER) versions, additionally, an extra thrust (XT) version of the CS300 was also offered.[31] The ER and XT versions were removed in 2012 by Bombardier, providing a standard range equal to the one previously identified as extended range.[32]

On 30 March 2009, Bombardier signed the second CSeries order, with airliner lessor Lease Corporation International (LCI) of Dublin, Ireland ordering 3 CS100s and 17 CS300s, becoming the launch customer of the latter.[33] LCI also holds options for a further 20 aircraft.[34]

In January 2010, JP Morgan reported that Bombardier was considering a 150-seat version of the CSeries. Bombardier called the report speculative, noting that the CSeries development program "is in the joint definition phase where we will be able to add greater product definition and that includes the ability to make changes before the final design is frozen".[35]

Republic Airways Holdings ordered 40 CS300 aircraft with options for an additional 40 in February 2010.[36] In March 2010, easyJet stated that the company was having "ongoing discussions with Bombardier regarding its CSeries.[37] In December 2009, United Airlines expressed interest in using the CS100 and CS300 for replacing its retiring 737–300 and 737-500 aircraft,[38] but no plans or orders had been made by United Airlines as of December 2011.

Bombardier Aerospace announced the sale of up to 30 CS300 aircraft to Asian launch customer, Korean Air, at the 2011 Paris Air Show.

On 1 June 2011, Braathens Leasing Limited in Sweden placed a firm order for five CS100 and five CS300 aircraft with options for ten more aircraft. With the order, Bombardier had secured a combined 100 firm orders.[39] On 7 June 2011, Bombardier received a firm order from an undisclosed airline for three CSeries airliners, with options for three more.[40] On 20 June 2011, Bombardier secured a launch customer for the CS100 at the Paris Air Show. The undisclosed airline signed a firm order for 10 aircraft with an option for six more.[41] On 21 June 2011, Korean Air signed a letter of intent to purchase 10 CS300 plus an additional 10 options and 10 purchasing rights on CS300; this agreement was converted to a firm order on 29 July 2011.[42][43] On 24 June 2011, the last day of the 2011 Paris Show, Bombardier signed a deal with an undisclosed European carrier to purchase ten CS100s.[44]

On 17 August 2011, at the MAKS Airshow, Ilyushin Finance signed a letter of intent to purchase up to 30 CSeries aircraft.[45] On 15 November 2011, Atlasjet purchased ten CS300 aircraft with options for another five.[46] After considering the Airbus A319 and CS300, Latvia's airBaltic placed a firm order for 10 CS300 aircraft plus an option for 10 additional aircraft in December 2012 with deliveries to start in 2015.[47][48][49]

Recent developments

AirAsia CEO Tony Fernandes and others during the presentation of a proposed 160-seat version of the CS300 airliner

The CSeries programme has several major suppliers, including Shenyang Aircraft (centre fuselage), Alenia Aeronautica (composite horizontal and vertical stabilisers), Fokker Elmo (wiring and interconnection systems), C&D Zodiac (interiors), Parker Hannifin (flight control, fuel and hydraulics systems), Liebherr-Aerospace (air management system), United Technologies Corporation (air data system, flap and slat actuation systems, and engine nacelles), and Rockwell Collins (avionics).[50][51][52] The rest of the airframe is built in Montreal, Canada; the aircraft is also assembled in Montreal.

The first flight was initially planned for the second half of 2012.[53] In 2010, deliveries of the CS100 were planned to start in 2013, and CS300 deliveries were to follow a year later.[54]

In March 2012, Bombardier specified the target date for the first flight was December 2012,[55] and reaffirmed that date in June 2012.[56] A news report in June 2012 stated that first CS100 delivery remained scheduled for the end of 2013.[56][57]

At the Farnborough Airshow in July 2012, Bombardier started discussions with AirAsia about a proposed 160-seat configuration for the CS300 airliner.[58] In November 2012, this configuration was included in the CS300 project, although AirAsia rejected this proposal.[59]

During a conference call in November 2012, Bombardier Aerospace acknowledged a delay of six months, for both first flight and entry into service of the CS100, due to issues with some unspecified suppliers.[60] This pushed the initial delivery date to customers into 2014.

On 20 February 2013, Ilyushin Finance converted the letter of intent it signed in August 2011 into a purchase agreement, subject to approval by its shareholders, for 32 CS300 aircraft.[61] On the same day, Pratt & Whitney's PW1500G was granted certification by Transport Canada.[62] The PW1500G powers the CSeries.

CSeries CS100 Flight Test Vehicle (FTV1) out of the factory in June 2013

An extensive update on the CSeries program was presented on 7 March 2013; the first "flight test vehicle" (FTV) was displayed in an almost completed state, along with three other FTVs in various states of assembly.[63][64] The 160-seat "Extra Capacity" version of the CS300, featuring two sets of over wing emergency exits, was also presented.[63]

The electrical system of the first flight test aircraft was successfully powered up in March 2013 and tests on the static test airframe proceeded satisfactorily and on schedule.[65]

CS100 after its first flight

In June 2013, due to upgrades of the aircraft's software and final ground testing, Bombardier shifted the timeline for the first flight into July 2013.[66] On 24 July 2013, due to a longer than expected system integration process, the first flight was delayed into "the coming weeks".[67] On 30 August 2013, Bombardier received the flight test permit from Transport Canada, granting permission to perform high speed taxi testing and flight testing.[1] As Bombardier planned,[68] a CS100 took the maiden flight for the model and the CSeries on 16 September 2013 from Mirabel Airport north of Montreal, Quebec, Canada.[69][70] Over 14,000 data points were gathered on this first flight, and after some reconfigurations and software upgrades, the aircraft flew for the second time on 1 October 2013.[71]

On 16 January 2014, the planned entry-into-service date was delayed again, due to difficulties with certification flight testing, by at least 12 months, to the second half of 2015; the CS300 is still to follow approximately six months after the CS100.[72]

On 29 May 2014, one of the four test aircraft suffered an uncontained engine failure. The test program was suspended until an investigation of the incident could be completed.[73] The incident kept Bombardier from showcasing the CSeries at the week-long 2014 Farnborough Airshow, one of the most important events for the aerospace and defense industry.[74]

In August 2014, after slashing its workforce, Bombardier changed the management overseeing the still-grounded aircraft.[75] Flight testing was resumed on 7 September 2014, after the engine problem had been identified as a fault in the lubrication system.[76] Bombardier chairman Laurent Beaudoin stated that the CSeries is expected to be in commercial service in 2016.[77] On 20 February 2015, CSeries CS100 aircraft had completed over 1,000 flight test hours.[78] A major consequence of the delays has been cancellations, including the orders from the Swedish lessor.[79]

Bombardier CS300 prototype C-FFDK in testing

On 27 February 2015, the CS300 prototype took off for its maiden flight at Bombardier's facility at Montreal Mirabel International airport in Quebec.[80] Test flight results showed the aircraft exceeds noise, economic and performance guarantees which may allow for longer range than advertised.[81] This was followed by the 5th CS100 on 18 March 2015.[82]

Bombardier stated that the CSeries has more than 600 orders and commitments on 17 March 2015.[83] On 27 March 2015, Bombardier stated that Canadian certification for the CS100 should come in late 2015 with entry into service in 2016.[84]

On 8 April 2015, the third largest customer, the Ilyushin Finance, said it was re-evaluating its order for up to 49 aircraft, given the delays in the program.[85]

On 7 May 2015, Bombardier and SWISS confirmed that the airline would be the launch customer and first to operate the CSeries in 2016. It was also confirmed that after almost 1,600 flight test hours, the CSeries was performing as expected.[86]

A CS500 further stretch would compete with the core 160 to 180 seats versions of the Boeing 737 and A320, but development has not been committed to yet.[87]

At the 2015 Paris Air Show, Bombardier released updated performance data, showing improvements in respect of the initially planned specifications.[88] Launch customer SWISS converted 10 CS100 from its initial order to CS300s.[89] On 17 June 2015 at the Paris Airshow, Air Baltic confirmed it will be the launch operator of the Bombardier CS300 in September 2016.[90] On 20 August 2015, Bombardier disclosed it had completed over 80% of the required certification tests for the CS100.[91]

In October 2015 Airbus confirmed that they had turned down Bombardier's offer to sell a majority share of the CSeries to them. Bombardier then said they would explore alternatives. Just days before, the government of Québec reiterated that it would be willing to provide Bombardier with financial aid, should the company request it. Richard Aboulafia, Teal Group vice president of analysis, and a long-time critic of the CSeries,[92] indicated that the cancellation of the program and coverage of losses by the Canadian federal government were both likely.[93][94] On the other hand, Bombardier said it was fully committed to the CSeries and had the financial resources in place to support the program.[95]

On 14 October 2015, Bombardier disclosed it had completed over 90% of the required certification tests for the CS100 and the first production CS100 aircraft will soon commence function and reliability tests.[96]

On 29 October 2015, Bombardier took a $3.2 billion writedown on the CSeries.[97] On the same day, the Quebec government invested $1 billion in the company to save the struggling programme.[98] The incoming federal Canadian government also indicated that it would reply to Bombardier's request for $350 million in assistance after the new Liberal government takes power in early November.[97]

A Scotiabank report in early November 2015 indicated that the company and the program would probably need a second bail out and that even then the C Series will probably not make money. Scotiabank analyst Turan Quettawala said, "we believe that the writedown corroborates our long-held view that the CSeries is not going to be value accretive under any scenario."[99]

The CS100 completed its certification testing program in mid-November 2015.[100] On 25 November 2015, Bombardier had completed the first phase of its route proving capabilities. The CS100 completed the first phase with a 100% dispatch reliability.[101]

After a development process that cost US$5.4 billion to December 2015, including a US$3.2 billion writeoff, the smallest model in the series, the 110-125 seat CS100 received initial type certification from Transport Canada on 18 December 2015.[102] At the time, the company had 243 firm orders and letters of intent, plus commitments for another 360, but most of these were for the CS300 model, expected to be certified by the summer of 2016. The first CS100 is expected to be in service with Lufthansa's subsidiary Swiss by mid-2016.[103][104]

The effect of stiff competition and production delays was apparent in early 2016. Although Delta Airlines said it was seriously looking at the Bombardier offerings, some analysts believe that Delta may be swayed by competitors offering deep discounts.[105] On 20 January, United Continental Holdings Inc. ordered 40 Boeing 737-700 aircraft instead.[106] Aside from ready availability of aircraft already in full production, the purchase of Boeing vs. the Bombardier CSeries was financially prudent. Since United already flies 310 of the 737, there will be savings for pilot training and fewer spare parts will need to be stocked. David Tyerman, an analyst with Canaccord Genuity offered the following assessment of the impact of this news to the Toronto Star: "This just shows how difficult it is for Bombardier to win orders these days. It’s not the end of the world, but this loss illustrates what they are up against. It also raises the question of how profitable the next C Series order they win will be for them."[107]

Design

Bombardier CSeries CS100 and CS300 illustration with front, side and top views

The Bombardier CSeries aircraft will contain a high usage of composite materials and larger windows.[108] The CSeries cabin will feature large, rotating overhead storage bins, allowing each passenger to stow a sizeable carry-on bag overhead.[108] Compared to the cabins of current in-service narrowbody aircraft, the CSeries is to provide airlines with the highest overhead bin volume per passenger and a wider aisle that would allow for faster boarding and disembarkation of passengers.[108]

The CSeries aircraft contain 70% advanced materials comprising 46% composite materials and 24% aluminium-lithium which allows for a 15% lower seat-mile cost and a significant reduction in maintenance costs.[109] The CSeries aircraft will also permit a significant fuel burn advantage and noise reduction.[110] Computer software design tools were used on the project, including CATIA, HyperSizer, and similar technology that was employed in the Learjet 85 programme.[111]

Orders and deliveries

Net orders (cumulative by year)
As of 30 September 2015[112][113]

The Bombardier CSeries family of aircraft has the following firm orders, as of 30 September 2015:[112][113]

CS100 CS300 Total firm orders
53 190 243
Orders and deliveries by year[113]
2008 2009 2010 2011 2012 2013 2014 2015 Total
Net orders 0 50 40 43 15 34 61 0 243
Deliveries

Specifications

CS100 CS300
Cockpit crew 2 pilots
Cabin crew 3 to 5 flight attendants
Passengers 133 (maximum capacity)
120 (single class)
108 (dual class)
160 (maximum capacity)
140 (single class)
130 (dual class)
Seat pitch 28 in (71 cm) (maximum capacity)
32 in (81 cm) (single class)
36 in (91 cm) & 32 in (81 cm) (dual class)
Seat width 18.5 in (47 cm) standard seat
19 in (48 cm) middle seat
20 in (51 cm) business class seat
Length 35.0 m (114.8 ft) 38.7 m (127 ft)
Wingspan 35.1 m (115 ft)
Wing Area (net) 112.3 m2 (1,209 sq ft)
Tail height 11.5 m (38 ft)
Fuselage max diameter 3.7 m (12 ft)
Cabin width 3.28 m (10.8 ft)
Cabin height 2.11 m (6.9 ft)
Cabin length 23.7 metres (78 ft) 27.5 metres (90 ft)
Cargo volume 23.7 m3 (840 cu ft) 31.6 m3 (1,120 cu ft)
Maximum takeoff weight (MTOW) 60,781 kg (133,999 lb) 67,585 kg (148,999 lb)
Maximum landing weight (MLW) 52,390 kg (115,500 lb) 58,740 kg (129,500 lb)
Maximum cargo payload 3,629 kg (8,001 lb) 4,853 kg (10,699 lb)
Maximum payload (total) 15,127 kg (33,349 lb) 18,711 kg (41,251 lb)
Maximum range 5,741 km (3,567 mi; 3,100 nmi) 6,112 km (3,798 mi; 3,300 nmi)
Cruise speed, maximum Mach 0.82 (870 km/h, 470 kn, 541 mph)
Cruise speed, typical Mach 0.78 (828 km/h, 447 kn, 514 mph)
Take off run at MTOW 1,219 m (3,999 ft) 1,524 m (5,000 ft)
Landing field length at MLW 1,356 m (4,449 ft) 1,463 m (4,800 ft)
Service ceiling 12,497 m (41,001 ft)
Engines Pratt & Whitney PW1500G
Thrust per Engine 84.1 kN (18,900 lbf) – PW1519G
93.4 kN (21,000 lbf) – PW1521G
103.6 kN (23,300 lbf) – PW1524G
103.6 kN (23,300 lbf) – PW1525G*
93.4 kN (21,000 lbf) – PW1521G
103.6 kN (23,300 lbf) – PW1524G
103.6 kN (23,300 lbf) – PW1525G*

* Provides up to 5% additional thrust for non-static conditions

Bombardier released the following performance specifications, regarding operations from urban airports with short runways and steep approaches, like London City Airport and Toronto Island Airport.

Urban operations
CS100 CS300
Maximum takeoff weight (MTOW) 54,885 kg (121,001 lb) 59,874 kg (132,000 lb)
Maximum landing weight (MLW) 51,029 kg (112,500 lb) 56,472 kg (124,499 lb)
Maximum payload (total) 13,767 kg (30,351 lb) 16,670 kg (36,750 lb)
Maximum range 3,148 km (1,700 nmi; 1,956 mi)

See also

A seating capacity graph for CSeries and comparable airliners. In blue the CSeries, in grey similar in-service airliners, and in orange similar in-development airliners.

Related development

Aircraft of comparable role, configuration, and era

Related lists

References

  1. ^ a b Bombardier Inc. (30 August 2013). "Bombardier CSeries Aircraft Awarded Transport Canada Flight Test Permit".
  2. ^ "Bombardier CS300 Aircraft Successfully Completes Maiden Flight". Bombardier Inc. 27 February 2015.
  3. ^ "Bombardier's all-new CS100 Aircraft Awarded Transport Canada Type Certification". Bombardier. 18 December 2015. Retrieved 18 December 2015.
  4. ^ "Bombardier Reveals airBaltic as CS300 Aircraft's First Operator". Bombardier. 8 November 2015. Retrieved 8 November 2015.
  5. ^ "Bombardier BD-500 CSeries Production List". planespotters.net. Retrieved 10 November 2015.
  6. ^ "List of Approved Special Conditions - Airworthiness". Transport Canada.
  7. ^ Embraer challenges Bombardier's CSeries with orders for second generation E-Jets CAPA - Centre for Aviation, 28 June 2013.
  8. ^ "A New Bombardier Jet Draws Only Tepid Demand". The New York Times, 14 July 2008.
  9. ^ "Bombardier Ends Talks With Fokker". allbusiness.com
  10. ^ FOKKER, A CLASH OF CULTURE.
  11. ^ a b "Bombardier Plans New Jetliner", Wall Street Journal, 14 July 2008, p. B3
  12. ^ Tomesco, Frederic (9 November 2009). "Bombardier's Beaudoin Sees Further Aerospace Cutbacks (Update2)". Bloomberg.
  13. ^ "Bombardier selects Canadian site for jet assembly plant". Kansas City Business Journal. 13 July 2008.
  14. ^ "Bombardier unveils 'greenest' passenger jet". canada.com. CanWest News Service. 14 July 2008.
  15. ^ "Bombardier". Bombardier.se. 8 September 2011.
  16. ^ "Bombardier Shelves $2.1 Billion Aircraft Program (Update6)". Bloomberg. 31 January 2006.
  17. ^ "CSeries Program Update". Bombardier.com.
  18. ^ "Bombardier opts for geared turbofan for CSeries". Flight International. 12 November 2007.
  19. ^ "Bombardier Grants Authority to Offer CSeries". Bombardier.com.
  20. ^ "Bombardier Launches CSeries Aircraft Program". Retrieved 13 July 2008.
  21. ^ "Bombardier awards contract to Ghafari to redevelop CSeries Aircraft Manufacturing Complex". ATW Online. 16 August 2010. Retrieved 16 August 2010.
  22. ^ "Bombardier Selects Rockwell Collins Pro Line Fusion(TM) for CSeries". Retrieved 15 July 2008.
  23. ^ Shalom, François (15 October 2009). "Boeing bristles over CSeries". The Gazette. Montreal.
  24. ^ "Bombardier Launches CSeries". Aviation Today. 17 July 2008.
  25. ^ "Bombardier officially begins construction of Belfast CSeries site". Flight International. 17 November 2009.
  26. ^ "PICTURE: Mongolia's Eznis signs letter of interest for CSeries". Flight International. 9 January 2009. Retrieved 23 March 2012.
  27. ^ "CSeries talks 'in the freezer': Qatar Airways". Flight International. 10 March 2009.
  28. ^ "CSeries questions remain despite Lufthansa firm deal". Flight International. 12 March 2009.
  29. ^ Ionides, Nicholas. "Lufthansa board approves order for 30 CSeries aircraft". Air Transport Intelligence news, 11 March 2009.
  30. ^ Kirby, Mary (11 March 2009). "Bombardier makes tweaks to CSeries specs". Air Transport Intelligence news.
  31. ^ Bombardier (January 2009). "Bombardier CSeries Factsheet" (PDF). Retrieved 23 April 2013.
  32. ^ a b Bombardier (June 2015). "Bombardier CSeries brochure" (PDF). Retrieved 14 June 2015.
  33. ^ Lessor LCI orders 20 CSeries including first CS300s. Retrieved 17 April 2009.
  34. ^ "International Aircraft Leasing| Key Facts". LCI Aviation.
  35. ^ "Talk of 150-seat CSeries in the fray following analyst report". Flight International. 6 January 2010.
  36. ^ "ATI: Republic orders 40 CSeries and options 40 more". Flight International. 25 February 2010.
  37. ^ "Businessweek - Business News, Stock market & Financial Advice". Businessweek.com. Retrieved 8 December 2014.
  38. ^ UAL Considers CSeries To Replace 737s. Aviation Week & Space Technology, 10 December 2009
  39. ^ Toronto Aerospace (1 June 2011). "Corporate > Media Centre > Press Releases". Bombardier.com.
  40. ^ Keenan, Greg (7 June 2011). "Bombardier books new order for C-series jets". The Globe and Mail. Toronto.
  41. ^ "Bombardier CSeries Gets Deal While Qatar Goes on Hold". Bloomberg. 20 June 2011. {{cite news}}: Unknown parameter |authors= ignored (help)
  42. ^ "Korean Air to Acquire up to 30 Bombardier CSeries Aircraft". Reuters. 21 June 2011.
  43. ^ "Korean Air Converts Letter of Intent to Firm Order for Bombardier CSeries Aircraft". Bombardier. 29 July 2011. Retrieved 14 April 2012.
  44. ^ Gates, Dominic (24 June 2011). "Bombardier's new CSeries: hanging in there at the Paris Air Show". The Seattle Times.
  45. ^ "MAKS: Ilyushin Finance plans to take up to 30 CSeries". Flight International. 17 August 2011.
  46. ^ "Bombardier inks deal to sell ten CSeries jets to Turkish airline". 15 November 2011.
  47. ^ "airBaltic" jaunās lidmašīnas iegādāsies no "Bombardier". 10 June 2012.
  48. ^ "SkyWest’s MRJ Pact Heads For Firm Order". AW&ST, 23 July 2012.
  49. ^ "Bombardier ends order drought for CSeries jet". The Star. Toronto. 20 December 2012.
  50. ^ "Majority of CSeries supplier contracts already awarded". Flight International. 1 June 2009.
  51. ^ "Bombardier – China". Cn.bombardier.com.
  52. ^ "Bombardier C-Series - Alenia Aermacchi". aleniaaermacchi.it. Retrieved 25 February 2015.
  53. ^ Scott Deveau (7 March 2012). "First flight of Bombardier CSeries set for December – or January". Financial Post. Retrieved 14 April 2012.
  54. ^ "CSeries poised for design freeze as joint definition phase concludes". Flight International. 27 January 2010.
  55. ^ "CSeries 'On Track' for First Flight in Second-Half of 2012". AINonline.
  56. ^ a b "Bombardier's Beaudoin still upbeat on CSeries". The Vancouver Sun. 13 June 2012. Retrieved 13 June 2012.
  57. ^ Baker, Liana B. (16 February 2012). "UPDATE 1-Bombardier satisfied with C-Series orders, CEO says". Reuters.
  58. ^ "FARNBOROUGH: AirAsia boss confirms talks for 100 CSeries CS300". Flightglobal.
  59. ^ Stephen Trimble. "Bombardier moves CS300 into detailed design with high-density variant included". Flightglobal.com.
  60. ^ Bombardier Inc. (7 November 2012). "Bombardier Announces Financial Results for the Third Quarter Ended September 30, 2012". Retrieved 21 December 2012.
  61. ^ Bombardier Inc. "Russia's Ilyushin Finance Co. Signs Purchase Agreement for up to 42 Bombardier CSeries Aircraft".
  62. ^ Bombardier Inc. "Transport Canada Certifies Pratt & Whitney PurePower PW1500G Engine for Bombardier CSeries Aircraft".
  63. ^ a b "CSeries Aircraft Program Making Excellent Progress Towards First Flight". Bombardier Inc. 7 March 2013. Retrieved 8 March 2013.
  64. ^ "Bombardier reveals C Series seat capacity increase".
  65. ^ "Bombardier Powers On the First CSeries Flight Test Vehicle and Completes Wing Static Testing Required for First Flight". Bombardier Inc. 25 March 2013. Retrieved 25 March 2013.
  66. ^ "Bombardier Completes CSeries Aircraft Ground Vibration Tests and Final Software Upgrades In Preparation for First Flight". 26 June 2013.
  67. ^ "Bombardier CSeries Aircraft First Flight to Take Place in the Coming Weeks". 24 July 2013.
  68. ^ François Shalom. "CSeries to take flight on Monday". The Gazette. Retrieved 14 September 2013.
  69. ^ "Bombardier CSeries jet completes maiden flight". cbc.ca. 16 September 2013. Retrieved 17 September 2013.
  70. ^ "Bombardier's CSeries Aircraft Completes Historic First Flight". Bombardier. 16 September 2013. Retrieved 17 September 2013.
  71. ^ "FTV1 Flies Again!". cseries.com. 1 October 2013. Retrieved 2 October 2013.
  72. ^ "Bombardier Aerospace Confirms Change to its CSeries Aircraft's Entry-into-Service". Bombardier, Inc. 16 January 2014. Retrieved 16 January 2014.
  73. ^ Campion-Smith, Bruce. "Bombardier CSeries test jet suffers engine failure". thestar.com. Retrieved 12 July 2014.
  74. ^ Wall, Robert (13 July 2014). "Bombardier Sees CSeries Test Flights Resuming in Weeks". Wall Street Journal. Retrieved 14 July 2014.
  75. ^ Ho, Solarina (19 August 2014). "More Bombardier executive reshuffling as CSeries still grounded". reuters.com. Reuters. Retrieved 19 August 2014.
  76. ^ "CSeries flight ends 100-day grounding". Flightglobal. {{cite web}}: |access-date= requires |url= (help); Missing or empty |url= (help)
  77. ^ "Work carried out in Belfast has contributed to one of the biggest changes in aerospace history, according to Bombardier Aerospace". BelfastTelegraph.co.uk. Retrieved 8 December 2014.
  78. ^ "CSeries aircraft program progressing well with more than 1,000 flight test hours achieved".
  79. ^ Ostrower, John and Paul Vieira, "Bigger proves far from better", Wall Street Journal, 9 January 2015, p.A1
  80. ^ "VIDEO: CS300 completes first flight". Flight Global, 27 February 2015.
  81. ^ "Exclusive: CSeries performance better than guarantees, "favorable" to brochure; range better than advertised". leehamnews. 3 March 2015.
  82. ^ "Bombardier FTV5 Takes To The Skies". aero-news.net. Retrieved 7 April 2015.
  83. ^ [1], Bombardier Aerospace twitter post. 17 March 2015.
  84. ^ "Bombardier Resets CSeries Debut to 2016 as Timeline Slips". Bloomberg. 27 March 2015. Retrieved 28 March 2015.
  85. ^ Owram, Kristine (8 April 2015). "Bombardier Inc's third-biggest CSeries customer 're-evaluating' its order". financialpost.com. Retrieved 11 April 2015.
  86. ^ "SWISS Revealed as First Airline in the World to Take Delivery and Operate the Bombardier CSeries Aircraft". bombardier.com. Bombardier Inc. 7 May 2015. Retrieved 8 May 2015.
  87. ^ Jon Ostrower (21 May 2015). "Bombardier Weighs Third CSeries Jet Model". Wall Street Journal.
  88. ^ Bombardier Inc. (14 June 2015). "Flight Tests Show Bombardier C Series Aircraft Performance Better than Targets". Retrieved 14 June 2015.
  89. ^ "Swiss order upgrade a boost for Bombardier C Series jets". The Globe and Mail. Retrieved 3 July 2015.
  90. ^ OLIVER CLARK (17 June 2015). "PARIS: Air Baltic to be CS300 launch operator". Flightglobal.
  91. ^ Bombardier (20 August 2015). "Certification Tests Over 80 per cent Complete for Bombardier C Series Aircraft". Bombardier Inc. Retrieved 26 August 2015.
  92. ^ Kristine Owram (7 October 2015). "Bombardier Inc's Airbus talks signal 'the beginning of the end' for CSeries, experts say - Financial Post". Financial Post. Retrieved 30 October 2015.
  93. ^ Van Wagenen, Juliet (8 October 2015). "Is the CSeries Doomed?". www.aviationtoday.com. Avionics Today. Retrieved 8 October 2015.
  94. ^ Tomesco, Frederic. "Bombardier Called 'Huge Asset' as Quebec Vows Aid If Needed". Bloomberg.com. Retrieved 9 October 2015.
  95. ^ Ross Marowits, The Canadian Press. "Bombardier says it has no plans to kill CSeries after approaching Airbus". Canadian Business - Your Source For Business News. Retrieved 30 October 2015.
  96. ^ Bombardier (14 October 2015). "Bombardier C Series Aircraft Certification Program Over 90 per cent Complete". Bombardier Inc. Retrieved 14 October 2015.
  97. ^ a b "Quebec makes high-risk bet with $1-billion Bombardier investment". The Globe and Mail. Retrieved 30 October 2015.
  98. ^ Valiante, Giuseppe (29 October 2015). "Bombardier CSeries, aerospace industry too important to give up: Quebec government". www.thestar.com. The Canadian Press. Retrieved 29 October 2015.
  99. ^ Kristine Owram (2 November 2015). "Bombardier Inc could need a second bailout within 12-18 months: Scotiabank". Financial Post. Retrieved 2 November 2015.
  100. ^ "Bombardier Celebrates the Completion of its CS100 Aircraft's Certification Flight Test Program". Bombardier. 17 November 2015. Retrieved 17 November 2015.
  101. ^ "Bombardier Completes First Phase of C Series Route Proving". Bombardier. 25 November 2015. Retrieved 25 November 2015.
  102. ^ Lu, Vanessa (18 December 2015). "Bombardier's CSeries jet certified for commercial service". Toronto Star. Toronto, Ontario. Retrieved 19 December 2015.
  103. ^ "Bombardier receives CSeries certification from Transport Canada". CBC News. CBC/Radio Canada. 18 December 2015. Retrieved 19 December 2015.
  104. ^ "Transport Canada announces type certification for CSeries". Flight Global. 18 December 2015. Retrieved 21 December 2015.
  105. ^ Reuters (19 January 2016). "Delta Airlines considering purchase of Bombardier C Series jets". Globe and Mail. Toronto, Ontario. Retrieved 21 January 2016. {{cite news}}: |author= has generic name (help)
  106. ^ Van Praet, Nicolas (21 January 2016). "Bombardier snubbed as United to buy 40 Boeing jets". Globe and Mail. Toronto, Ontario. Retrieved 21 January 2016.
  107. ^ Bloomberg (21 January 2016). "Boeing beats Bombardier to United airliner sale". Toronto Star. Toronto, Ontario. Retrieved 21 January 2016.
  108. ^ a b c "Aerospace > Products > Commercial Aircraft > CSeries". Bombardier.com.
  109. ^ "Aerospace > Products > Commercial Aircraft > CSeries". Bombardier.com.
  110. ^ Bombardier CSeries website Accessed 13 March 2014
  111. ^ Karen Wood (1 November 2010). "Learjet 85 composite pressurized cabin a cost cutter". Composites World. High-Performance Composites. Retrieved 22 August 2011.
  112. ^ a b "Bombardier CSeries program status report" (PDF). 30 September 2015.
  113. ^ a b c Orders by year:
  114. ^ Bombardier (June 2015). "Bombardier CS100" (PDF). Retrieved 14 June 2015.
  115. ^ Bombardier (June 2015). "Bombardier CS300" (PDF). Retrieved 14 June 2015.
  116. ^ "Bombardier CSeries page". Bombardier.com.
  117. ^ Pratt & Whitney. "PurePower PW1500G Engine for the Bombardier CSeries" (PDF). Retrieved 18 December 2012.
  118. ^ Bombardier Inc. (21 March 2012). "COMAC and Bombardier Sign Definitive Agreement to Establish Commonality Opportunities Between C919 and CSeries Aircraft". Retrieved 13 September 2013.
  119. ^ Bombardier Inc. (28 August 2013). "Bombardier, IRKUT Entering Exploratory Discussions on Customer Support for the MS-21 Aircraft". Retrieved 13 September 2013.