Jump to content

Vijayawada–Nidadavolu loop line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Roland zh (talk | contribs) at 20:19, 29 November 2016 (+Category:Transport in West Godavari district; +Category:Transport in Krishna district using HotCat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Vijayawada–Nidadavolu_loop_line
Overview
StatusOperational
OwnerIndian Railway
LocaleAndhra Pradesh
Termini
Service
Operator(s)South Central Railway
Technical
Track gauge1,676 mm (5 ft 6 in) Broad gauge
Route map
Template:Infobox rdt

The Vijayawada–Nidadavolu loop line is a loop of VijayawadaGudivadaBhimavaram TownNidadavolu railway stations. Both Vijayawada and Nidadavolu stations lie on Howrah-Chennai main line. It is under the administrative jurisdiction of Vijayawada railway division of South Central Railway zone.[1][2][3]

References

  1. ^ Ramesh Susarla (22 September 2011). "Track-doubling work will begin in six months: official". The Hindu. Vijayawada. Retrieved 17 December 2015.
  2. ^ "Budget Speech 1958-59" (PDF). Indian Railways. p. 154. Retrieved 28 September 2015.
  3. ^ Subba Rao, G.V.R; Raghavendra, V (8 July 2014). "Politicians fail to make railway projects a reality". The Hindu. Vijayawada. Retrieved 16 December 2015.