Jump to content

Line 2 (Guangzhou Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 22:40, 25 January 2021 (Task 18 (cosmetic): eval 2 templates: hyphenate params (2×);). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 2
 2 
Overview
Other name(s)M2 ("" shape plan name)
M2 / M3e / L1 (5 lines plan name)
M2 (7 lines plan name)
M2 / GZn (2000 plan name)
Jiahe line
(嘉禾线)
StatusOperational
OwnerCity of Guangzhou
LocalePanyu, Haizhu, Yuexiu, and Baiyun districts
Guangzhou, Guangdong
Termini
Stations24
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Rolling stockCRRC Zhuzhou Locomotive Metro cars
26 Bombardier Movia and 130 CRRC Changchun Railway Vehicles Metro cars based in Movia design (extinct)[1]
Daily ridership1.32 million (2017 daily average)[2]
1.64 million (2014 Peak)[3]
History
Opened29 December 2002; 21 years ago (2002-12-29)
Technical
Line length31.4 km (19.51 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, 1,500 V DC
Route map

 3  Up arrow to Airport North (Terminal 2)
 14  Right arrow to Dongfeng
Jiahe Depot
Jiahewanggang
 3   14 
 3  Right arrow to Tiyu Xilu
Huangbian
Jiangxia
Xiao-gang
Baiyun Culture Square
 12 
Baiyun Park
Feixiang Park
Sanyuanli
 22  Up arrow to Airport North (Terminal 2)/  11  Right arrow clockwise
Guangzhou Railway Station
 5   11   14   22 
 22  Down arrow to Panyu Square/  11  Left arrow anti-clockwise
Yuexiu Park
Sun Yat-sen Memorial Hall
 13 
 13 
Left arrow to Chaoyang
to Xinsha Right arrow
connection to Line 1
Gongyuanqian
 1 
 1 
Left arrow to Xilang
to Guangzhou East railway station Right arrow
Haizhu Square
 6 
The 2nd Workers' Cultural Palace
Jiangnanxi
connection to Line 8
Changgang
 8 
Jiangtai Lu
 11 
 11 
Left arrow clockwise
anti-clockwise Right arrow
Dongxiaonan
 10 
Nanzhou
Luoxi
Sanzhixiang Creek
Dashi Creek
Huijiang
 7  Right arrow to Yanshan
Shibi
 7 
Guangfo circular IR Foguan IR
Guangzhou South Railway Station
 7   22  Foshan Metro  2 
Foshan Metro  2  Left arrow to Nanzhuang
Dazhou Stabling Yard
Dazhou Depot (Line 7)/ Guangfo circular IR Foguan IR
 7  Down arrow to Meidi Dadao
Line 2
Simplified Chinese广州地铁2号线
Traditional Chinese廣州地鐵2號線
Cantonese YaleGwóngjāu Deihtit Yih Houh Sin

Line 2 of the Guangzhou Metro is a north-south line on the system that runs from Template:GZM stations to Template:GZM stations, with a total length of 31.4 km (19.5 mi) with 24 stations. All stations in Jiahe Line are underground.[4] Line 2's color is blue.

The line previously ran together with Line 8 on a single route between Template:GZM stations and Template:GZM stations stations until the extensions to both lines officially opened on 25 September 2010.[5]

History

Line 2 drawn to scale.
The former alignment of Line 2 drawn to scale.
  • 1984 - The municipal government set up the Preparation Office of Guangzhou Metro.
  • 14 March 1988 - Chinese and French co-planning team publish four tentative designs of Line 1 and Line 2.
  • 28 July 1998 - Construction of Line 2 phase 1 officially commenced.
  • 29 December 2002 - the first section of Line 2 phase 1 enter operation.
  • 28 June 2003 - the second section of Line 2 phase 1 enter operation.
  • 2004 - The Line 2 and 8 realignment project; and Line 2 revise phase 2 (northern extension and southern extension) was announced. Creating Line 8 by splitting off the southeastern section (Xiaogang to Wanshengwei) from Line 2.
  • 26 December 2005 - Pazhou to Wanshengwei extension enter operation and the entire Line 2 phase 1 was completed.
  • June 2007 - Line 2 and 8 realignment project; and Line 2 new phase 2 was approved by the NDRC.
  • 1 August 2007 - Construction of Line 2 and 8 realignment project; and Line 2 phase 2 officially commenced.
  • 21 September 2010 - Services of train bound between Sanyuanli to Wanshengwei ends.
  • 22–24 September 2010 - Temporarily suspension of operation on Line 2.
  • 25 September 2010 - Line 2 and 8 realignment project; and Line 2 phase 2 was completed and the entire line resumed operation.
Segment Commencement Length Station(s) Name
Xiaogang — Sanyuanli 29 December 2002 8.9 km (5.53 mi) 9 (initial phase)
Pazhou — Xiaogang 28 June 2003 9.0 km (5.59 mi) 7 Pazhou extension
Wanshengwei — Pazhou 26 December 2005 1.8 km (1.12 mi) 1 Wanshengwei extension
Xiaogang — Wanshengwei 21 September 2010 −10.8 km (−6.71 mi) -9 Line 2 & 8 realignment project
Sanyuanli — Jiahewanggang 25 September 2010 10.3 km (6.40 mi) 7 Realignment northern extension
Guangzhou South — Jiangnanxi 12.7 km (7.89 mi) 9 Realignment southern extension

Service routes

Stations

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
2 01 Template:GZM stations 广州南站  7   GZ  Guangzhou South railway station IZQ 0.00 0.00 Panyu
2 02 Template:GZM stations 石壁  7  1.24 1.24
2 03 Template:GZM stations 会江 2.27 3.51
2 04 Template:GZM stations 南浦 2.46 5.97
2 05 Template:GZM stations 洛溪 1.17 7.14
2 06 Template:GZM stations 南洲  Guangfo  2.31 9.45 Haizhu
2 07 Template:GZM stations 东晓南  10  1.02 10.47
2 08 Template:GZM stations 江泰路  11  1.90 12.37
2 09 Template:GZM stations 昌岗  8  1.15 13.52
2 10 Template:GZM stations 江南西 0.85 14.37
2 11 Template:GZM stations formerly Shi Er Gong 市二宫 1.08 15.45
2 12 Template:GZM stations formerly Hai Zhu Guang Chang 海珠广场  6  1.05 16.50 Yuexiu
2 13 Template:GZM stations 公园前  1  1.26 17.76
2 14 Template:GZM stations 纪念堂  13  0.76 18.52
2 15 Template:GZM stations 越秀公园 0.90 19.42
2 16 Template:GZM stations 广州火车站  5   11   14   GS  Guangzhou railway station GZQ 1.03 20.45
2 17 Template:GZM stations 三元里 1.41 21.86 Baiyun
2 18 Template:GZM stations 飞翔公园 1.17 23.03
2 19 Template:GZM stations 白云公园 1.62 24.65
2 20 Template:GZM stations 白云文化广场  12  1.03 25.68
2 21 Template:GZM stations 萧岗 1.04 26.72
2 22 Template:GZM stations 江夏 1.55 28.27
2 23 Template:GZM stations 黄边 1.25 29.52
2 24 Template:GZM stations 嘉禾望岗  3   14  1.82 31.34

Headways

Date Period Termini Hours Frequency Frequency Type
Monday
thru
Friday
AM Peak Template:GZM stationsTemplate:GZM stations 7:30 — 9:30 2 min. & 30 sec. 2 long-trains
1 short-train
Template:GZM stationsTemplate:GZM stations / Template:GZM stationsTemplate:GZM stations 3 min. & 30 sec.
PM Peak Template:GZM stationsTemplate:GZM stations 16:30 — 19:45 2 min. & 50 sec. ~ 3 min. & 30 sec. Long-trains only
Mid 7:00 — 7:30 / 9:30 — 16:30 / 19:45 — 21:30 3 min. & 30 sec.
Low 6:00 — 7:00/21:30 — 23:30 6 min. & 30 sec.
Saturday
&
Sunday
Peak 11:00 — 19:15 3 min.
Mid 7:00 — 11:00 / 19:15 — 21:30 3 min. & 30 sec.
Low 6:00 — 7:00 / 21:30 — 23:30 6 min. & 30 sec.

References

  1. ^ http://www.railway-technology.com/projects/guangzhou/
  2. ^ http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf
  3. ^ 861万!地铁客流再创新高!. Guangzhou Metro Corporation. 2014-01-04. Retrieved 2014-01-05.
  4. ^ Guangzhou Metro Light Rail System, China
  5. ^ "Dates fixed for opening of six new metro lines GDNews www.newsgd.com". Newsgd.com. 2010-09-21. Retrieved 2013-07-12.