Second Chengdu–Chongqing high-speed railway

From Wikipedia, the free encyclopedia
Second Chengdu–Chongqing
high-speed railway
成渝中线高铁
Overview
StatusUnder construction
LocaleSichuan and Chongqing
Termini
Stations8
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Line length292 km (181 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph) (planned) 400 km/h (249 mph) (reserved)

The Second Chengdu–Chongqing high-speed railway (Chinese: 成渝中线高铁; lit. 'Chengdu–Chongqing Central line high-speed railway') is a 292-kilometre (181 mi)[1] long high-speed rail line that connects the cities of Chengdu (in Sichuan Province) and Chongqing in southwestern China, with a maximum speed of 350 km/h (220 mph) and a future design speed of 400 km/h (250 mph).[2][3] It will head via Lezhi, Anyue, and Dazu. Construction started on September 26, 2021 [4] and it is expected to open in 2027.

The 292 kilometres (181 mi) long Second Chengdu–Chongqing high-speed railway will take a more direct route than the existing 307 kilometres (191 mi) long high-speed Chengdu–Chongqing intercity railway and is expected to reduce journey times between the two cities to 50 minutes.[4] In addition, the section between Jianzhou and Dazu Shike will be designed for 400 km/h (250 mph) operations in the future,[5] creating potential conditions for further reductions to travel time.

History

[edit]

Approval for the 69.273 billion yuan project was granted on August 17, 2021 by the National Development and Reform Commission.[1] Later the project cost was revised to 73.3 billion yuan.[5] Construction started on September 26, 2021.[4]

Stations

[edit]
Station Name[6] Chinese Metro
transfers/connections
Chengdu 成都 Chengdu Metro 1 7
Jianzhou 简州
Lezhi 乐至
Anyue 安岳
Dazu Shike[7] 大足石刻
Tongliang[7] 铜梁
Kexuecheng 科学城
Chongqing North 重庆北      Line 4      Line 10 (North Square)
     Line 3      Line 10      Loop line (Sorth Square)

Other railways between Chengdu and Chongqing

[edit]

The first railway between the two cities was the Chengdu–Chongqing railway, completed in the 1950s.[8] The Suining–Chengdu railway and Suining–Chongqing railway form a route between the two cities which was completed in 2006. The fastest journeys on this line take just over two hours. The Chengdu–Chongqing intercity railway was completed in 2015.

References

[edit]
  1. ^ a b c "国家发展改革委关于新建成渝中线铁路(含十陵南站)可行性研究报告的批复". National Development and Reform Commission. 项目总投资692.73亿元,其中工程投资678.93亿元,动车组购置费13.8亿元
  2. ^ "1月14日新闻早点 | 高铁上新,时速400公里!成渝中线有望成跑得最快的高铁!_时间_中国_台湾地区". www.sohu.com. Retrieved 2024-07-31.
  3. ^ "时速400公里 成渝中线有望成跑得最快的高铁-新华网重庆频道". cq.news.cn. Retrieved 2024-07-31.
  4. ^ a b c "成渝中线高铁启动建设 成渝两地未来将实现高铁50分钟通达". 2021-09-26. Archived from the original on 2021-09-26.
  5. ^ a b "冲击400公里时速!成渝中线高铁马上开工 投资733亿元". 快科技. Retrieved 2024-07-31.
  6. ^ "成渝中线高铁获批 重庆境内新建设科学城等站". 2021-08-25. 全线共设站8座,线路从重庆北站引出,沿线新设科学城站、铜梁站、大足石刻站、安岳站、乐至站、简州站,接入成都站
  7. ^ a b "成渝中线高铁预留时速400公里/时 将新建7座车站".
  8. ^ "新中国档案:成渝铁路--新中国的第一条铁路" 2009-08-11