Jump to content

Western Alignment

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Mar4d (talk | contribs) at 10:48, 29 November 2016. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Western Alignment of the China Pakistan Economic Corridor
The Western Alignment of the China Pakistan Economic Corridor is depicted by the red line.
Route information
Length1,153 km (716 mi)
Major junctions
North endBrahma Bahtar Interchange near Hasan Abdal, Punjab province
South endGwadar Port
Location
CountryPakistan
Highway system

The Western Alignment refers to the portions of the China–Pakistan Economic Corridor (CPEC) which are located in the Pakistani provinces of northwestern Punjab, Khyber Pakhtunkhwa and Balochistan.

The CPEC project envisages an expanded and upgraded road network in the aforementioned provinces, and will result in the upgrading or construction of 1,153 kilometres (716 mi) worth of road into two- and four-lane divided highways by mid-2018 along the Western Alignment,[1] with land acquisition sufficient for upgrading parts of the road to a six-lane motorway in the future.[2]

Route description

Brahma Bahtar–Yarik Motorway

The Western Alignment roadway network will begin at the Brahma Bahtar Interchange on the M1 Motorway near the towns of Burhan and Hasan Abdal in northern Punjab province.[3] The newly reconstructed Karakoram Highway will connect to the Western Alignment at Burhan, near where the new 285-mile-long (285 mi) controlled-access Brahma Bahtar-Yarik Motorway will commence.[4] The motorway will terminate near the town of Yarik, just north of Dera Ismail Khan.[5] The route will traverse the Sindh Sagar Doab region, and cross the Indus River at Mianwali before entering into Khyber Pakhtunkhwa province. It will consist of 11 interchanges, 74 culverts, and three major bridges spanning the Indus, Soan, and Kurram rivers.[6] It will have reserved rights-of-way flanking either side of the motorway to allow for widening of the road to a six-lane motorway in the future.[4] Total costs for the project are expected to be $1.05 billion.[7] Pakistan's Executive Committee of the National Economic Council approved construction of this section of roadway in April 2016,[6] while groundbreaking took place in May 2016.[8] Construction is expected to be completed within 36 months.[5]

Upgrades to National Highway 50

At the southern terminus of the new Burhan–Yarik motorway, the N50 National Highway will also be upgraded between Dera Ismail Khan in Khyber Pakhtunkhwa and Zhob in neighbouring Balochistan province, with eventual reconstruction between Zhob and Quetta.[9] The upgraded roadway will consist of a four-lane dual-carriageway spanning the 205 kilometres (127 mi)* distance between the two cities.[10] The first portion of the N50 to be upgraded will be the 81-kilometre (50 mi) portion of the N50 between Zhob and Mughal Kot, with construction works having begun in January 2016.[11] Construction on this portion is expected to be completed by 2018 at a cost of $86 million,[9] While the project is consider a vital link in the CPEC's Western Alignment,[11] the project's cost will not be financed by Chinese state-owned banks, but will instead be financed by the Asian Development Bank under a 2014 agreement which preceded CPEC,[12][13] as well as by a grant provided by the United Kingdom's Department for International Development.[14]

Upgrades to National Highway 25

Heading south from Quetta, the Western Alignment of the CPEC will continue to the town of Surab in central Balochistan as the N25 National Highway. From Surab, a 470-kilometre-long (290 mi) route known as the N85 National Highway will connect central Balochistan with the town of Hoshab in southwestern Balochistan province near the city of Turbat. This portion of roadway between Surab and Hoshab is 51% complete as of January 2016,[15] and is expected to be completed in December 2016.[16]

Construction of the M8 motorway

The towns of Hoshab and Gwadar are connected by a newly built 193-kilometre-long (120 mi) portion of the M8 Motorway—the Hoshab to Gwadar portion of the motorway was completed and inaugurated in February 2016 by Prime Minister Nawaz Sharif at a cost of approxiamtely $124 million[17][18]

Special economic zones

The Western Alignment will be flanked by special economic zones along its route,[19] with at least seven special economic zones planned to be established in Khyber Pakhtunkhwa.[2]

Construction

In total, the CPEC project envisages re-construction of 870 kilometres (540 mi) of road in Balochistan province alone as part of the Western Alignment. Of those 870 kilometres (540 mi) of road, 620 kilometres (390 mi) have already been rebuilt as of January 2016.[20]

Pakistan's Executive Committee of the National Economic Council approved construction of the Brahma Bahtar-Yarik Motorway in April 2016,[6] and construction is expected to be completed within 36 months.[5]

Financing

As part of the CPEC project, the Western Aligment is part of a package of approximately $11 billion worth of infrastructure projects throughout the country that are being developed by the Pakistani government. These projects will be financed by concessionary loans, with composite interest rates of 1.6%,[21] after Pakistan successfully lobbied the Chinese government to reduce interest rates from an initial 3%.[22] The loans are subsidised by the government of China, and are to be dispersed by the Exim Bank of China and the China Development Bank. For comparison, loans for previous Pakistani infrastructure projects financed by the World Bank carried an interest rate between 5% and 8.5%,[23] while interest rates on market loans approach 12%.[24]

References

  1. ^ 280 kilometres (170 mi) as part of the Brahma Bahtar-Yarik Motorway, 205 kilometres (127 mi) as part of N50 upgrades, 470 kilometres (290 mi) of upgrades to N25, and 193 kilometres (120 mi) of the M8 motorway
  2. ^ a b "KP remained part of CPEC Western Route meetings at federal level". The News. Pakistan. 13 January 2016. Retrieved 16 January 2016.
  3. ^ "PM Inaugurates Western Alignment of CPEC". Daily Frontier Star. 31 December 2015. Retrieved 2 February 2016.
  4. ^ a b "China to finance 90% of Sukkur-Multan Motorway". Daily Times. 12 May 2016. Retrieved 13 May 2016.
  5. ^ a b c "China–Pakistan Economic Corridor (CPEC) Western Route: New Four Lane Highway Facility from Barahma Bahtar to D. I. Khan as Part of Western Route of China–Pakistan Economic Corridor (CPEC) 285 km Approx., Packages: I to V." (PDF). National Highway Authority. p. 38. Retrieved 2 February 2016.
  6. ^ a b c Haider, Mehtab (24 April 2016). "Ecnec approves motorway from Burhan/Hakla to DI Khan". The News. Retrieved 4 May 2016.
  7. ^ "Nawaz to open Gwadar-Turbat Highway project today". Business Recorder. 3 February 2016. Retrieved 3 February 2016. 110 billion Pakistani Rupees = US$1.05 billion as of Feb 3 2016
  8. ^ http://www.thenews.com.pk/latest/120599-PM-Nawaz-performs-groundbreaking-of-Motorway-in-DI-Khan
  9. ^ a b "Parliamentary Body Monitoring Progress of CPEC". Business Recorder. 9 January 2016. Retrieved 16 January 2016.
  10. ^ "Nawaz to open Gwadar-Turbat Highway project today". Business Recorder. 3 February 2016. Retrieved 3 February 2016.
  11. ^ a b "PM inaugurates western route of CPEC in Zhob". Dawn. 6 January 2016. Retrieved 3 February 2016.
  12. ^ "ADB approves $197million for Balochistan road project". The Nation. Pakistan. 6 July 2014. Retrieved 5 February 2016.
  13. ^ "ADB Provides $197 Million to Develop Highway in Balochistan". Asian Development Bank. 12 May 2015. Retrieved 5 February 2016.
  14. ^ "ADB to provide $72m for highways in Balochistan". Dawn. 15 January 2016. Retrieved 5 February 2016.
  15. ^ Business Recorder. 12 January 2016 http://www.brecorder.com/top-news/pakistan/272543-balochistan-to-be-connected-through-highways-under-cpec.html. Retrieved 29 January 2016. {{cite news}}: Missing or empty |title= (help)
  16. ^ "PM inaugurates CPEC's western route in Zhob". Tribune Pakistan. 30 December 2015. Retrieved 29 January 2016.
  17. ^ "PM INAUGURATES 193 KM LONG GWADAR-HOSHAB M-8". Business Recorder. Retrieved 3 February 2016.
  18. ^ 13 billion PKR = US$124,099,430.00 as of May 2016
  19. ^ "Pakistan to build CPEC western route by middle of 2018". Economic Times. India. 15 January 2015. Retrieved 16 January 2016.
  20. ^ "COAS Assures Balochistan People Will Prosper With Upcoming Projects". Geo News. 1 January 2016. Retrieved 26 January 2016.
  21. ^ Butt, Naveed (3 September 2015). "Economic Corridor: China to Extend Assistance at 1.6 Percent Interest Rate". Business Recorder. Retrieved 16 December 2015.
  22. ^ Haider, Mehtab (23 September 2015). "China converts $230m loan for Gwadar airport into grant". Geo TV News. Retrieved 16 December 2015.
  23. ^ https://finances.worldbank.org/Loan-and-Credit-Administration/IBRD-Statement-of-Loans-Latest-Available-Snapshot/sfv5-tf7p?
  24. ^ http://data.worldbank.org/indicator/FR.INR.LEND