Jump to content

Hazaribagh Town railway station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Wavelength (talk | contribs) at 17:07, 30 April 2016 (hyphenating: —> "24-hour" [1 instance]—WP:MOS#Numbers (point 1)—WP:HYPHEN). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Hazaribagh Town
Indian Railway Station
General information
LocationNH-100, KumharToli, Hazaribagh, Jharkhand
 India
Coordinates23°59′01″N 85°20′25″E / 23.9837°N 85.3402°E / 23.9837; 85.3402
Elevation610 m (2,001 ft)
Owned byIndian Railways
Operated byEast Central Railway
Line(s)Koderma-Hazaribagh section
Platforms3
Tracks6
Construction
ParkingAvailable
Other information
StatusFunctioning
Station codeHZME
Zone(s) East Central Railway
Division(s) Dhanbad Railway Division
History
Opened20 February 2015
ElectrifiedNo
Koderma Junction-Hazaribagh Town railway station
Technical
Track gauge1676 mm
Length80 km
Koderma Junction-Hazaribagh Road railway station
Technical
Track gauge1676 mm
ElectrificationYes
Length48 km

Hazaribagh Town railway station belongs to East Central Railway of Dhanbad division. It is located on NH100 Kumhar Toli Hazaribagh district of Jharkhand state.

History

This line was announced in rail budget 1999 under the rule of Atal Bihari Vajpayee. After a 16 years, this dream was fulfilled on 20 February 2015. It was inaugurated by Prime Minister Narendra Modi along with Jharkhand Governor Syed Ahmad, Chief Minister Raghubar Das, Union Railways Minister Suresh Prabhu, Union Minister of State for Railways Manoj Sinha, Union Minister of State for Finance and Hazaribagh MP Jayant Sinha.[1]

Cost of the Project

The project estimated cost for the full stretch between Koderma-Hazaribagh-Barkakana-Ranchi (total length of 200 kilometers) has an estimated cost of INR 3,000 crores. The railway stretch between Hazaribagh to Koderma, a 79.7 kilometer distance, incurred cost of INR 936 crores.[2] During the inception of project in the year 1999, the estimated cost was around INR 332 crores, however over the period of time, the cost has been escalated to nearly INR 936 crores.[3]

Future Plans

The Hazaribagh Town Railway Station is to be connected with Ranchi via Barkakana. The deadline for project completion is set to be two-year period March 2016 deadline for Hazaribagh - Barkakana and March 2017 deadline for Barkakana - Ranchi Section. Amid Security concerns in the maoist hit Ramgarh district the project has been provided with 24-hour security. Also a railway coal siding line is to be constructed from Hazaribagh Town to Bandag.

References

  1. ^ "Hazaribagh Town railway station opens". Retrieved 21 February 2015.
  2. ^ "Modi to flag off Hazaribagh-Koderma Passenger Train from Hazaribagh Station on Feb 20". Retrieved 11 March 2015.
  3. ^ http://www.dailypioneer.com/state-editions/ranchi/pm-to-inaugurate-koderma-hazaribagh-rail-line-today.html%7Ctitle = PM TO INAUGURATE KODERMA-HAZARIBAGH RAIL LINE TODAY| accessdate = 11 March 2015
Preceding station   Indian Railways   Following station
Template:Indian Railways linesTerminus