Interstate 99
This article may need to be rewritten to comply with Wikipedia's quality standards. (March 2010) |
Route information | ||||
---|---|---|---|---|
Maintained by PennDOT | ||||
Length | 85.0 mi[1] (136.8 km) | |||
Existed | 1998–present | |||
NHS | Entire route | |||
Major junctions | ||||
South end | I-70 / I-76 / Penna Turnpike / US 220 near Bedford | |||
PA 56 near Cessna US 22 near Altoona US 322 near State College PA 26 near Pleasant Gap PA 64 near Pleasant Gap | ||||
North end | I-80 near Bellefonte | |||
Location | ||||
Country | United States | |||
State | Pennsylvania | |||
Highway system | ||||
|
Interstate 99 (I-99) is an intrastate Interstate Highway entirely within central Pennsylvania. The current southern terminus is at exit 146 of the Pennsylvania Turnpike (I-70/76) north of Bedford, where the road continues south as U.S. Route 220. The northern terminus is currently at Interstate 80 near Bellefonte, Pennsylvania. The interstate passes through Altoona and State College, home to Pennsylvania State University. I-99 closely follows the path of US 220.
Unlike most Interstate numbers, which were assigned by AASHTO to fit into a grid, I-99's number was written into Section 332 of the National Highway Designation Act of 1995 by Bud Shuster, then-chair of the U.S. House Committee on Transportation and Infrastructure, the bill's sponsor, and the representative of the district through which the highway runs. Interstate 99 violates the AASHTO numbering convention associated with Interstate Highways, since it lies east of Interstate 79 but west of Interstate 81.[2]
When construction on I-99 is completed, the southern terminus of the route will be at an interchange with Interstate 68 in Cumberland, Maryland. The northern terminus will be at an interchange with Interstate 86 in Corning, New York.
Route description
While the current road runs from Bedford to Bellefonte, Pennsylvania, future plans have this road starting from the Pennsylvania–Maryland border mostly along US 220 and then continuing northward along U.S. Route 15 towards the New York state line.
The names given to this road include the Bud Shuster Highway and the Appalachian Thruway. The latter name continues north with US 220 and US 15.
Bedford to Altoona
Interstate 99 currently begins as a continuation of the two-lane portion of US 220 from Maryland near the Pennsylvania Turnpike (I-76). The interchange with the turnpike requires drivers to get onto Old US 220 near Bedford to enter the Pennsylvania Turnpike.
Altoona to I-80
From Altoona, the highway has a large intersection with U.S. Route 22 in Hollidaysburg. This interchange allows travellers to head west towards Ebensburg, Johnstown, and Pittsburgh. Pennsylvania Route 764 intersects further at Bellwood.
Northward towards Tyrone, Interstate 99 runs along one of the older sections of the highways when US 220 was first converted to a limited access highway.
In Tyrone itself, Interstate 99 is a short elevated expressway at Pennsylvania Route 453.
Until the end of 2007, the highway ended north of Tyrone at the village of Bald Eagle, where traffic was diverted to US 220. On December 22, 2007, after several long construction delays, the section from Bald Eagle to Port Matilda was opened to traffic. The remaining section to just short of Interstate 80 near Bellefonte (via the Mount Nittany Expressway) was opened to traffic the week of November 24, 2008.[3]
History
This section needs additional citations for verification. (December 2007) |
Corridor O of the Appalachian Development Highway System was assigned in 1965, running from Cumberland, Maryland (Corridor E, now Interstate 68) to Bellefonte (Interstate 80) along US 220. The portion in Pennsylvania, from Bedford north to Bald Eagle, was upgraded to a freeway in stages from 1970 to 1995.
As the interchange with the Pennsylvania Turnpike near Bedford was built long before the new freeway opened, there is no direct freeway-to-freeway access between the Turnpike (I-70/76) and I-99. Traffic must use U.S. Route 220 Business, the old alignment of US 220 before the freeway.
In 1991, the Intermodal Surface Transportation Efficiency Act (ISTEA) was signed into law. It included a number of High Priority Corridors, one of which - Corridor 9 - ran along US 220 from Bedford to Williamsport, Pennsylvania, and then north on U.S. Route 15 to Corning, New York.
The National Highway Designation Act of 1995 amended ISTEA; among these amendments were that "the portion of the route referred to in subsection (c)(9) [Corridor 9] is designated as Interstate Route I-99." This was the first Interstate number to be written into law rather than assigned by the American Association of State Highway and Transportation Officials (AASHTO). The number was specified by Representative Bud Shuster, who said that the standard spur numbering was not "catchy"; instead, I-99 is named after a street car, No. 99, that took people from Shuster's hometown of Glassport to McKeesport.[4] (Interstate 73 and the extension of Interstate 74 had been defined in 1991 by ISTEA as the "I-73/74 north–south Corridor", but not officially added to the Interstate Highway System or assigned those numbers.)
On November 6, 1998, AASHTO approved the I-99 designation from Bedford to Bald Eagle. Since then, the connection through the Nittany Valley between the existing State College bypass on U.S. Route 322 and Interstate 80 has been built (the northernmost piece was widened from a two-lane freeway in 1997). On its completion in 2002, US 220 was rerouted via US 322 and the new road, and the old US 220 north of US 322 was designated U.S. Route 220 Alternate.
Future
S. 719, sponsored by Paul Sarbanes of Maryland, would have extended Corridor O south to Corridor H in West Virginia.[5]
As defined in Federal law[citation needed], I-99 is to continue north to Corning, New York. Signs have been placed along the present US 220 and US 15, much of which are built to Interstate Highway standards, marking the route as the "Future I-99 Corridor".
Maryland
The full route of I-99 is part of Corridor O of the Appalachian Development Highway System, which runs along US 220 from Interstate 68 near Cumberland, Maryland north onto I-99 near Bedford, Pennsylvania.
Pennsylvania
Interstate 99 is planned to start from the Maryland border to be a continuation to the existing routing that starts in Bedford.
From Bellefonte to Williamsport, plans are to have this road continue along US 220.
From Williamsport to Corning, New York, plans are to have this road continue along U.S. Route 15 to the state line.
New York
In the state of New York, this road is slated to continue north from Pennsylvania along U.S. Route 15 to Interstate 86/NY 17 near Corning, where the freeway would then provide a link to Rochester via I-390. New reference markers installed on now US 15 indicate this stretch as the I-99 corridor with the "99I" on the markers.
Exit list
County | Location | Mile[6] | Exit | Destinations | Notes |
---|---|---|---|---|---|
Bedford | Bedford Township | 0.00 | 1 | I-70 / I-76 / Penna Turnpike – Pittsburgh, Harrisburg | |
2.93 | 3 | PA 56 (US 220 Bus. south) – Johnstown, Cessna | |||
East St. Clair Township | 6.65 | 7 | PA 869 – St. Clairsville, Osterburg | ||
King Township | 10.13 | 10 | Blue Knob State Park | ||
Blair | Greenfield Township | 14.92 | 15 | Claysburg, King (US 220 Bus. north) | |
Freedom Township | 22.88 | 23 | PA 36 / PA 164 to US 22 east – Roaring Spring, Portage, Hollidaysburg |
||
Allegheny Township | 28.12 | 28 | US 22 – Ebensburg, Hollidaysburg | ||
Logan Township | 30.60 | 31 | Plank Road (US 220 Bus.) | ||
31.88 | 32 | To PA 36 (Frankstown Road) |
|||
33.24 | 33 | 17th Street | |||
Antis Township | 38.62 | 39 | PA 764 south – Pinecroft |
||
41.30 | 41 | PA 865 north – Bellwood |
|||
45.41 | 45 | Tipton, Grazierville | |||
Tyrone | 47.89 | 48 | PA 453 – Tyrone | ||
Snyder Township | 51.84 | 52 | PA 350 (US 220 Bus. south) – Bald Eagle | ||
Centre | Worth Township | 61 | Port Matilda (US 220 Alt. north) | ||
62 | US 322 west – Philipsburg |
South end of US 322 overlap; southbound exit and northbound entrance; northbound exit is via exit 61 | |||
Patton Township | 68 | Gray's Woods, Waddle | |||
69 | US 322 Bus. east (Atherton Street) |
Northbound exit and southbound entrance | |||
69 | Valley Vista Drive – Park Forest | Southbound exit and northbound entrance | |||
71 | Toftrees, Woodycrest | ||||
College Township | 73 | US 322 east – State College, Lewistown |
North end of US 322 overlap | ||
74 | Innovation Park, Penn State University | Northbound exit is part of exit 73 | |||
Benner Township | 76 | Shiloh Road | |||
78 | PA 150 – Bellefonte | Signed as exits 78A (south) and 78B (north) | |||
Spring Township | 80 | Harrison Road | Northbound exit and southbound entrance | ||
81 | PA 26 south to PA 64 – Pleasant Gap |
South end of PA 26 overlap | |||
83 | PA 550 – Bellefonte, Zion | ||||
North end of freeway | |||||
I-80 / US 220 north (US 220 Alt. south) – Williamsport, Dubois |
References
- ^ American Association of State Highway and Transportation Officials - Report of the Special Committee on U.S. Route Numbering to the Standing Committee on Highways, Saturday, November 7, 1998
- ^ "Interstate 99 @ Interstate-Guide.com". 2007-05-05. Retrieved 2007-05-13.
- ^ "I-99 Finished Near State College". Pittsburgh Post-Gazette. 2008-11-025. Retrieved 2008-11-25.
{{cite web}}
: Check date values in:|date=
(help); Cite has empty unknown parameter:|Last=
(help) - ^ Sean D. Hamill (December 27, 2008). "Road Stirs Up Debate, Even on Its Name". New York Times.
- ^ Bill S.719 of 2005
- ^ DeLorme Street Atlas USA 2007. Toggle Measure Tool. Accessed on July 12, 2007.
External links
- Interstate 99 at
- News on the I-99 acid-rock cleanup from CentreDaily.com