Luton DART
Luton DART | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Luton Borough Council | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit type | Automated guided people mover (light metro) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of stations | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | www | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Began operation | 10 March 2023[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of vehicles | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Headway | 225 seconds[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System length | 2,080 metres (1.29 miles)[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
No. of tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Top speed | 50.4 km/h (31.3 mph)[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Luton DART is an airport rail link in Luton, Bedfordshire, England, which connects Luton Airport Parkway station and Luton Airport using a Cable Liner automated people mover system. DART is an acronym for Direct Air-Rail Transit. The line, which opened in March 2023, replaces the shuttle bus service, with the aim of reducing road congestion and reducing journey times from London St Pancras to the airport terminal to 32 minutes.
History
Background
From the 1950s and 1960s, Luton Airport experienced an increase in business as a result of the growing package holiday market.[3][4] Although the Midland Main Line passed within 1 mile (1.6 km) of the airport, there was no dedicated railway station and public transport connections to Luton Airport were limited. A shuttle bus service operated from Luton railway station, to convey rail passengers 2 miles (3.2 km) from Luton town centre to the airport terminal.[5]
Luton Airport Parkway railway station opened in 1999, providing rail connections to central and south London, Gatwick Airport and Brighton on the Thameslink route, as well as services to the East Midlands. Although the new station was closer to the airport – 1 mile (1.6 km) to the west – it was still necessary to run a shuttle bus transfer service.[6][7][8]
The shuttle bus was considered to be unsatisfactory, and proposals were developed to replace the bus service with a new rail link. Several schemes were considered, including a 2007 proposal to replace the shuttle buses with segregated tracked transit conveyors,[9] and in 2015, a heavy rail spur link to the airport was also being considered.[10] The steep incline from the airport – approximately 40 metres (130 ft) downhill to Luton Airport Parkway station – presented engineering challenges to building any heavy rail link over the short distance to the airport terminal.[11]
In April 2016, London Luton Airport Ltd (LLAL) announced a scheme to create a light rail/automated guided people mover connection between the airport and Luton Airport Parkway station.[12] It was envisaged that the introduction of a light-rail link would reduce the journey time between London St Pancras and the airport terminal to less than 30 minutes.[11] At launch, that figure is 32 minutes.[13]
Construction
The Luton DART link was approved by Luton Borough Council in June 2017.[14][15] Construction work commenced in April 2018, contracted to a VolkerFitzpatrick / Kier Group joint venture.[16][17]
The project involved construction of bridges over the A1081 road and tunnels, along with two stations in phase 1. The first station was built at Bartlett Square in Napier Park on the east side of Luton Airport Parkway station, and the final station at the airport.[18] In 2018, it was announced that the system would be a Cable Liner, manufactured by the Austrian transit manufacturer, Doppelmayr Cable Car (DCC), who also have a contract to operate the system for the first five years.[19] The vehicles were built by the Austrian cabin manufacturer Carvatech.[20]
In December 2019, a ready-constructed, 80-metre (260 ft)-long, 1,000-tonne (980-long-ton; 1,100-short-ton) curved bridge was moved into place over the A1081 road on large jacks.[21] Construction work on the line was halted briefly in April 2020 during the COVID-19 pandemic over concerns related to Coronavirus Health Protection Regulations, but resumed after a safety assessment.[22] The cable propulsion system was completed in February 2020 and work then began to install the people mover vehicles on the guide rails.[23] A new light rail terminus building has been constructed next to the railway station.[24]
Testing of the transit vehicles began in 2021. In August of that year, reports emerged of problems experienced with the traction or the pulley system during testing, and that a DART vehicle had become derailed. This was denied by LLAL.[25]
Opening
The system was originally scheduled to open in 2021. Following delays resulting from the COVID-19 pandemic, the opening date was revised to late 2022. The planned opening was later delayed due to further technical testing and development of the ticketing system.[26][27][28][29] A member of Luton Borough Council's overview and scrutiny board called for an independent investigation into Luton DART's two-year delay and £90 million budget increase.[30]
On 6 December 2022, King Charles III visited the Luton DART during a royal visit to the town. He unveiled a plaque commemorating his visit before travelling on the new transit system.[31][32]
Passenger trials began in February 2023,[33] with a second batch of trials announced for March. The service opened to all passengers for four hours per day on 10 March. It subsequently opened for 24 hours per day on 27 March 2023.[1][34]
Operation
Luton DART is operated by a subsidiary company wholly owned by London Luton Airport Limited (LLAL, trading as Luton Rising). It operates 24 hours a day, with trains running every four minutes throughout the day and every eight to 15 minutes at other times. The journey time is under four minutes.[34][35][36]
Route
The 2.1 km (1.3 mi) DART line begins at Luton DART Parkway, a purpose-built station adjoining Luton Airport Parkway railway station, which provides an interchange with East Midlands Railway and Thameslink passenger rail services. The DART platforms are located on a new upper level above the current station, and are connected to the main-line rail platforms via a new footbridge and concourse, complete with lifts and escalators. The concourse includes separate barrier lines for main line rail and DART, with an unpaid area in between.[18][24]
DART vehicles head south-eastwards along a 350-metre (380-yard) viaduct. After crossing the A1081 road, the vehicles curve eastwards along a 1.1 km (0.68-mile) cutting and concrete trough before entering a 350-metre cut-and-cover tunnel under the airport apron. The eastern terminus is located at a new subterranean station underneath the drop-off area in front of the terminal building. Access to a surface level concourse and barrier line is provided by escalators and lifts; the airport terminal is a 150 metres (490 ft) covered but outdoor walk from the station concourse.[18]
Track and rolling stock
Luton DART is operated using Cable Liner automated people mover technology manufactured by Doppelmayr Cable Car. The line uses the Cable Liner's Double Shuttle configuation, with two unconnected tracks, each with its own independent cable haulage system. There are two four-section articulated trains, with one on each track. Each train has a capacity of 170 passengers, and operates at a maximum running speed of 50.4 km/h (31.3 mph). A four-minute interval service requires the use of both trains, whilst an eight-minute interval can be maintained with a single train in service.[2]
Fares and ticketing
The single fare for the DART is £4.90, and through tickets to Luton Airport are available, from all stations on the National Rail. Luton residents can register for half-price travel, and holders of concessionary travel passes, disabled blue badge holders and airport workers can register for free travel. Registration for both half-price and free travel must be done online, at least 72 hours before travel, and tickets obtained online once registration is authorised; passes are not accepted at the barriers.[37][38][39][40][41]
The £4.90 DART fare has been criticised as too expensive for the short journey; at £3.95 per mile, it is claimed by The Guardian to be the most expensive train in Britain by distance.[42] Luton Airport notes that through tickets to destinations across the UK will be available - with advance tickets to London around £10. A "walk up" fare from the airport to London St Pancras will cost £22.40, which is similar in price to other airport rail links in the UK (such as Heathrow Express).[39]
Interchange
East Midlands Railway services between London St Pancras and Corby, previously branded as "EMR Connect", were rebranded to "Luton Airport Express" following the opening of the DART. They run every 30 minutes and operate non-stop between Luton Airport Parkway and London St Pancras with a journey time of 24 minutes. To the north of the airport, they also serve Luton, Bedford, Wellingborough and Kettering.[13][43]
Thameslink also provides service to Luton Airport Parkway, with six trains an hour calling at the station in both directions during the day. To the north trains run to Luton and Bedford, and to the south they serve London St Pancras and continue to various destinations to the south of London, including Brighton, Gatwick Airport and Rainham. The journey time to St Pancras varies between 40 and 50 minutes depending on the stopping pattern.[43][44]
Future developments
As part of the proposals for the expansion of Luton Airport, it is envisaged that the DART line would be extended eastwards to terminate at a new station serving Terminal 2.[45][46]
References
- ^ a b "Luton Dart airport shuttle welcomes first passengers". BBC News. 10 March 2023. Archived from the original on 28 March 2023. Retrieved 10 March 2023.
- ^ a b c d "London Luton Airport Direct Air-to-Rail Link | References | Doppelmayr Cable Car". www.dcc.at. Doppelmayr Group. December 2017. Archived from the original on 24 March 2023. Retrieved 8 May 2023.
- ^ "Airport History". London Luton Airport. Archived from the original on 29 June 2007. Retrieved 16 July 2007.
- ^ "Luton Airport marks 80th birthday". BBC News. 16 July 2018. Archived from the original on 19 October 2019. Retrieved 19 October 2019.
- ^ Beddall, David (30 October 2022). Luton's Transport: A Journey Through Time. Pen & Sword. p. 11. ISBN 978-1-5267-5561-2. Retrieved 22 June 2022.
- ^ Haywood, Russell (23 March 2016). Railways, Urban Development and Town Planning in Britain: 1948–2008. Routledge. p. 225. ISBN 978-1-317-07164-8. Retrieved 22 June 2022.
- ^ Shannon, Paul D. (30 November 2019). British Railway Infrastructure Since 1970: An Historical Overview. Pen & Sword. pp. 128–129. ISBN 978-1-5267-3480-8. Retrieved 22 June 2022.
- ^ David, Gareth (30 September 2017). Railway Renaissance: Britain's Railways After Beeching. Pen & Sword. p. 195. ISBN 978-1-4738-6202-9. Retrieved 22 June 2022.
- ^ "Blue Skies Easing the Pressure". The Monitor. Archived from the original on 28 September 2007. Retrieved 17 July 2007.
- ^ "Luton Airport reveals plans for new direct rail service". Railway Technology. 21 July 2015. Archived from the original on 12 August 2015. Retrieved 26 July 2015.
- ^ a b Topham, Gwyn (15 April 2016). "Luton airport to replace bus transfers with £200m light rail link". The Guardian. Archived from the original on 15 April 2016. Retrieved 15 April 2016.
- ^ "Luton airport peoplemover plan announced". Railway Gazette International. 15 April 2016. Archived from the original on 16 April 2016.
- ^ a b "Luton Airport Express". East Midlands Railway. Archived from the original on 10 March 2023. Retrieved 10 March 2023.
- ^ "New railway connection to London Luton Airport approved". BBC News. 22 June 2017. Archived from the original on 22 June 2017. Retrieved 11 September 2019.
- ^ "London Luton Airport peoplemover approved". Metro Report International. Sutton: DVV Media Group. 6 July 2017. Archived from the original on 11 July 2017.
- ^ "Work begins on new £225 million rail link at Luton Airport". ITV News Anglia. 17 April 2018. Archived from the original on 18 April 2018. Retrieved 11 September 2019.
- ^ "VolkerFitzpatrick-Kier jv wins £119m Luton airport rail link". Construction Enquirer. January 2018. Archived from the original on 2 January 2018.
- ^ a b c Horgan, Rob (30 April 2021). "Luton Dart: Autonomous rail link between airport and station nears completion". New Civil Engineer. Archived from the original on 31 March 2022. Retrieved 18 June 2022.
- ^ "Doppelmayr Cable Car to build Cable Liner in London" (Press release). 18 April 2018. Archived from the original on 22 December 2018. Retrieved 22 December 2018.
- ^ "Luton Dart". Carvatech. Archived from the original on 6 April 2023. Retrieved 8 September 2020.
- ^ Sketchley, Elisha (3 December 2019). "1,000 tonne Luton DART bridge opens". Planning, BIM & Construction Today. Archived from the original on 5 April 2023. Retrieved 20 May 2020.
- ^ Patel, Holly (21 April 2020). "Work restarts on the Luton DART after review of how government's COVID-19 guidance was being implemented". www.lutontoday.co.uk. Archived from the original on 25 April 2020. Retrieved 20 May 2020.
- ^ "DART train between London Luton Airport and St Pancras one step closer". ITV News. 20 February 2021. Archived from the original on 20 February 2021. Retrieved 22 February 2021.
- ^ a b "Transforming Luton Airport Parkway". www.thameslinkrailway.com. Govia Thameslink Railway Ltd. Archived from the original on 29 May 2022. Retrieved 24 June 2022.
- ^ Duncan, Euan (3 August 2021). "'Testing problems' with £225m Luton DART, meeting told". www.lutontoday.co.uk. Archived from the original on 3 August 2021. Retrieved 29 June 2022.
- ^ "Luton DART". Luton Rising. London Luton airport Ltd. 6 September 2021. Archived from the original on 18 June 2022. Retrieved 18 June 2022.
- ^ Horgan, Rob (5 October 2022). "Luton Airport's £260M autonomous light rail link delayed". New Civil Engineer. Archived from the original on 5 October 2022. Retrieved 12 October 2022.
- ^ Duncan, Euan (4 October 2022). "£225million DART air to rail transport link for Luton Airport delayed until 2023". www.lutontoday.co.uk. Archived from the original on 4 October 2022. Retrieved 12 October 2022.
- ^ "Luton airport shuttle used by King to open by Easter". BBC News. 5 January 2023. Archived from the original on 5 January 2023. Retrieved 5 January 2023.
- ^ "Investigate airport shuttle delay, councillor says". BBC News. 24 January 2023. Archived from the original on 24 January 2023. Retrieved 15 March 2023.
- ^ Hutchinson, Laura (6 December 2022). "In Pictures: King Charles rides Luton DART during visit to the town". Luton Today. Archived from the original on 6 December 2022. Retrieved 8 December 2022.
- ^ "King Charles III boards delayed Luton DART airport shuttle". BBC News. 6 December 2022. Archived from the original on 6 December 2022. Retrieved 8 December 2022.
- ^ Duncan, Euan (2 February 2023). "Luton DART: Passenger trials take place on £290m air-rail transit system". Luton Today. Archived from the original on 3 February 2023.
- ^ a b "Luton DART will officially open on Monday - connecting Luton Airport to national rail services in under 4 minutes".
- ^ "Luton Airport's new £225m DART project will be run by a new subsidiary company". www.lutontoday.co.uk. 2 August 2022. Archived from the original on 3 August 2022. Retrieved 24 August 2022.
- ^ "FAQs". Luton DART. Retrieved 10 May 2023.
- ^ Duncan, Euan (19 October 2022). "Fares for new Luton Airport DART transport system unveiled". bedfordshirelive. Retrieved 25 October 2022.
- ^ Preston, Olivia (6 March 2023). "Luton DART set to replace shuttle bus service by end of March". Luton Today. Retrieved 6 March 2023.
- ^ a b "Luton airport Dart rail shuttle finally set to open – at a price". The Independent. 9 March 2023. Retrieved 26 March 2023.
East Midlands Railway, which will provide the Luton Airport Express service as part of its normal network from London via Luton to Bedford and Corby, says at least 25 per cent of Advance tickets between the capital and the airport will be sold at £10 one way or less – including the Dart portion of the journey. The full "walk-up" fare is £22.40 one way, which is comparable with the express rail links serving Heathrow, Gatwick and Stansted from central London.
- ^ "Luton Residents". Luton DART. Retrieved 9 May 2023.
- ^ "General Concessions". Luton DART. Retrieved 9 May 2023.
- ^ "Luton Dart: 'the most expensive train in Britain' opens for business". The Guardian. 3 March 2023.
- ^ a b "Table C - Bedford, Luton and St Albans to London, Sutton, Medway Towns, Gatwick Airport and the South Coast". Thameslink. Retrieved 9 May 2023.
- ^ "Go to the airport with Thameslink". Thameslink. Retrieved 9 May 2023.
- ^ "Future LuToN Statutory Consultation 2019" (PDF). London Luton Airport Ltd. October 2019. pp. 4, 26. Archived from the original (PDF) on 18 October 2019.
- ^ "Welcome to our expansion proposals". Luton Rising. 30 January 2022. Archived from the original on 15 February 2022. Retrieved 21 June 2022.
External links
- Official website
- Video simulation: "Doppelmayr Cable Car: "DART Cable Liner" London Luton Airport, UK". YouTube. Doppelmayr Seilbahnen. 2018. Retrieved 22 December 2018.
- Mid-construction drone footage: "Luton DART Fly Through". YouTube. Luton Council. January 2021. Retrieved 24 February 2021.