STS-128
COSPAR ID | 2009-045A |
---|---|
SATCAT no. | 35811 |
End of mission | |
STS-128 (ISS assembly flight 17A) was the most recent space shuttle mission to the International Space Station (ISS). It used Space Shuttle Discovery, and launched on August 28, 2009. The primary payload was the Multi-Purpose Logistics Module Leonardo, containing a collection of experiments for studying the physics and chemistry of microgravity. Three spacewalks were carried out during the mission, which removed and replaced a materials processing experiment outside ESA's Columbus module, and returned an empty ammonia tank assembly.[3] The first launch attempt was delayed due to weather concerns, including multiple weather violations in NASA's launch rules, beginning over two hours before the scheduled launch.[4][5][6] The second launch attempt scheduled for August 26, at 1:10:22 am EDT was called off the previous evening due to an anomaly in a fuel valve of the orbiter.[7][8][9] The launch took place on Friday, August 28, at 11:59 pm EDT.
Crew
Position[3] | Launching astronaut | Landing astronaut |
---|---|---|
Commander | Frederick W. Sturckow Fourth spaceflight | |
Pilot | Kevin A. Ford First spaceflight | |
Mission specialist 1 | Patrick G. Forrester Third spaceflight Intra-vehicular Officer (IV) | |
Mission specialist 2 | José M. Hernández First spaceflight Flight engineer | |
Mission specialist 3 | Christer Fuglesang, ESA Second spaceflight EV3 | |
Mission specialist 4 | John D. Olivas Second spaceflight Lead spacewalker EV1 | |
Mission specialist 5 | Nicole Stott Expedition 20 First spaceflight EV2 |
Timothy Kopra Expedition 20 First spaceflight |
Crew notes
Nicole Stott was originally scheduled to return aboard Soyuz TMA-15, but a change in the flight plan was made due to the possible flight delays in future shuttle missions, which may extend Canadian astronaut Robert Thirsk's mission beyond the six-month duration preferred for station crew members.[10]
STS-128 is planned to be the final Space Shuttle flight used for ISS crew rotation, with Nicole Stott replacing Tim Kopra. Stott will return on STS-129, but that flight will not bring her replacement.
The mission of Christer Fuglesang is named Alissé by the European Space Agency.[11] The name was proposed by Jürgen Modlich from Baierbrunn, Germany. The name refers to the 15th-century explorers who used the trade winds to follow Christopher Columbus across the oceans to the New World.
STS-128 also marks the first time two Hispanic Americans are on the same crew. John "Danny" Olivas of El Paso, Texas, will be making his second trip up into space, and José Hernández of Stockton, California, will be making his first. Both are of Mexican heritage.
Mission payload
Multi-Purpose Logistics Module (MPLM) Leonardo
The primary payload of STS-128 is the Multi-Purpose Logistics Module. Leonardo's purpose is to assist with establishing a six-man crew capacity by bringing extra supplies and equipment to the station. The Multi-Purpose Logistics Module will contain three racks for life support, a Crew quarter to be installed in Kibo, a new treadmill (COLBERT) that will temporarily be placed in Node 2 and later in Node 3, and an Air Revitalization System (ARS) that will temporarily be placed in Kibo and later in Node 3.
- Leonardo Specifications
- Length: 21 feet (6.4 m)
- Diameter: 15 feet (4.6 m)
- Payload Mass (launch): 27,510 pounds (12,480 kg)
- Payload Mass (return): 16,268 pounds (7,379 kg)
- Empty Weight: 9,810 pounds (4,450 kg)
Lightweight Multi-Purpose Carrier (LMC)
The shuttle carried a Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) with Ammonia Tank Assembly (ATA).[2] The new ammonia tank will replace an empty tank during an EVA.
TriDAR
The shuttle flew the first test flight of the TriDAR, a 3D dual-sensing laser camera, intended for potential use as an autonomous rendezvous and docking sensor. The TriDAR successfully tracked the ISS position and orientation from the shuttle during docking operations.
Other science packages
It will also contain three racks dedicated to science, FIR (Fluids Integrated Rack) and the first Materials Science Research Rack (MSRR-1) to be placed in Destiny and MELFI-2 (Minus Eighty Laboratory Freezer for ISS) to be placed in Kibo. The FIR will enable detailed study of how liquids behave in microgravity, a crucial detail for many chemical reactions. One experiment, for instance, will examine how mixtures known as colloids behave without being stirred by sedimentation and convection. Another using the Light Microscopy Module (LMM) will examine how an ideal heat pipe works without the distortions of gravity.[12]
Mission experiments
The STS-128 mission (as did STS-125 and STS-127) took part in crew seat vibration tests that will help engineers on the ground understand how astronauts experience launch. They will then use the information to help design the crew seats that will be used in future NASA spacecraft.
STS-128 repeated the Boundary Layer Transition (BLT) Detailed Test Objective (DTO) experiment that was done by the same shuttle during STS-119. In this experiment, one of the thermal protection systems was raised to create a boundary layer transition in which the air flow becomes turbulent beyond a certain speed. During STS-119 the tile was raised 0.25 inches (6.4 mm) above the others, tripping the flow at Mach 15 during reentry. In the modification being done, the tile has been raised 0.35 inches (8.9 mm) to trip at Mach 18 producing more heat.
Discovery undertook the testing of a catalytic coating which is meant to be used by the Orion (spacecraft). Two TPS tiles located in the protuberance downstream from the BLT tile had been fully coated with the catalytic material in order to understand the entry heating performance. The tiles were instrumented to collect a wide variety of data.[13]
Mission background
The mission marks:
- 159th American manned space flight
- 128th shuttle mission since STS-1
- 37th flight of Discovery
- 30th shuttle mission to the ISS
- 103rd post-Challenger mission
- 15th post-Columbia mission
- 32nd shuttle night launch
- NASA's first space shuttle launch to take place during two calendar days
- 25th anniversary of Discovery's first flight, STS-41-D. (30 August, 1984)
Shuttle processing
Discovery rolled from the Orbiter Processing Facility to the Vehicle Assembly Building after the external tank was cleared for use and was mated with it.[14][15] The foam insulation on the tank underwent stringent pull tests after the foam liberated and hit the orbiter during STS-127.[16] The STS-128's tank initially exhibited no concerns while the STS-127 case was determined to be a one off case due to surface contamination prior to foam application.[17][18]
The main change from previous missions is the change of the Ground Umbilical Carrier Plate (GUCP) vent housing. The quick release vents exhibited leaks during STS-119 and STS-127, which were determined to be due to a misalignment in the vent. This led to the one part rigid seal in the external tank being replaced with a two part flexible seal.[19]
Discovery later rolled out from the VAB to Launch Complex 39A on Tuesday, August 4, 2009, in a slow drive on the top of the Crawler-transporter. The 3.4-mile (5.5 km) rollout began at 2:07 am ET, and ended with the launch platform secured in place at about 1:50 pm ET. The move took longer than expected due to adverse weather conditions, which included lightning warnings. The crawler also had to pause occasionally so mud could be removed from its treads and bearings. Technicians then quickly prepared the shuttle to host the crew’s countdown dress rehearsal known as the Terminal Countdown Demonstration Test, or TCDT.[20] Discovery’s seven astronauts flew to Kennedy on Wednesday for the training activity which concludes later in the week with a complete practice countdown, minus liftoff, involving the crew and the launch team.[21] Meanwhile, in an unprecedented operation, modifications were made to the left Solid rocket booster on the pad.[22] The modifications involved replacement of a check valve filter assembly in the booster which was found to have broken.[23] In a potentially delaying factor, in depth testing of the external tank with X-ray revealed voids in the foam which might have formed during the injection molding of the foam. This has also been decided as a suspect factor in the foam shedding during STS-127. The air in the voids could have expanded due to the high temperatures generated during ascent thus breaking the foam. The reviews considered a rollback as an option since the defect could not be set right in the pad.[23][24][25] Later, the tank was cleared for launch as is without any additional inspections.[26]
Launch attempts
The first launch attempt was delayed by 24 hours due to weather concerns including multiple weather violations in NASA's launch rules beginning over 2 hours before the scheduled launch.[4][5][6] During the second attempt on Wednesday morning, a problem with a LH2 fill-and-drain fuel valve inside space shuttle Discovery's aft compartment led to another scrubbing. The problem arose when sensors did not detect the closure of the valve when commanded to do so. The issue was thought to be with the sensors rather than the valve itself.[7][8][9] After inerting the orbiter's tank, which involved draining it, tests were conducted on the valves. Despite the valves working normally, another delay was called for to have more confidence in the system, and to give the console operators who performed the test some rest.[27][28][29] The launch team evaluated the issue, passing on a possible launch window Friday, August 28, at 12:22 AM. The launch was delayed till 11:59pm Friday, August 28, to allow the engineers to be fully satisfied with the vehicle.[30] Later the mission was cleared for launch which involved a flight rule waiver for cycling the valve and a discussion to analyze the test failure of an Ares-1 booster that was similar to the SRBs used for the mission.[31] NASA feared another delay when storms formed near the Kennedy Space Center on Friday, August 28, but the weather cleared in time for a successful launch of Discovery at 11:59 pm.[32][33][34][35]
Attempt | Planned | Result | Turnaround | Reason | Decision point | Weather go (%) | Notes |
---|---|---|---|---|---|---|---|
1 | 25 Aug 2009, 1:36:05 am | Scrubbed | — | Weather | 25 Aug 2009, 1:25 am (T−9:00 hold) | 80%[36] | Precipitation and lightning in launch and landing area[4][5][6] |
2 | 26 Aug 2009, 12:22:07 am | Scrubbed | 0 days 22 hours 46 minutes | Technical | 25 Aug 2009, 5:52 pm | 70%[36] | Failure indicator on LH2 inboard fill and drain valve[27][28][29] |
3 | 28 Aug 2009, 11:59:37 pm | Successful | 2 days 23 hours 38 minutes | 60%; later 80%[37] | [38] |
Mission timeline
Aug. 28 (Flight Day 1 – Launch)
After launch at 23:59 EDT, Discovery opened her payload bay doors. Once the doors were opened the crew deployed the Ku-band antenna and activated the Shuttle Remote Manipulator System (SRMS). Once the Ku-band antenna was deployed and activated the crew then down-linked photos from the External Tank Umbilical Well Camera system, so controllers on the ground could see how the tank performed and how much if any foam was shed during ascent.
Aug. 29 (Flight Day 2 – TPS Survey)
During Discovery's first full day on orbit, the crew used the SRMS to grapple the Orbiter Boom Sensor System (OBSS) and survey the wing leading edges, nose and other parts of the Thermal Protection System (TPS), as well as the Orbital Maneuvering System (OMS) Pods. During this time some of the crew were preparing the space suits that will be used during the 3 Extra-vehicular activities (EVA) and setting up the tools that will be used during the docking. This includes installing the Centerline Camera and extending the Orbiter Docking system Ring Extension.
Aug. 30 (Flight Day 3 – Docking)
Discovery docked with the Pressurized Mating Adapter (PMA) 2 on the front of the Harmony connecting module. Before the shuttle docked Commander Rick Sturckow performed what is known as the Rendezvous Pitch Maneuver (RPM), while Expedition 20 Commander Gennady Padalka and Flight Engineer Michael Barret took photos of the shuttles belly. The photos were down-linked to mission control for review. After docking, Nicole Stott and Tim Kopra switched Soyuz seat liners, making Stott an Expedition 20 Flight Engineer and Tim Kopra an STS-128 Mission Specialist. The joint crews also performed some transfers from the shuttle mid-deck and checked on the pressure in the MPLM Leonardo.
Aug. 31 (Flight Day 4 – MPLM Berthing)
During flight day 4 the MPLM Leonardo was berthed to the Nadir or earth facing port on Harmony using the Space Station Remote Manipulator System (SSRMS). Once it was berthed, the crews activated it and opened the hatch for ingress. Some more items were transferred from the shuttle mid-deck including the MDS experiment and the space suits Danny Olivas and Nicole Stott will use during EVA 1. The pair also prepared all the tools that will be used during the EVA with some help from Tim Kopra. Later on during the night when the crews were asleep, the team of ground controllers vented the Port 1 (P1) Ammonia Tank Assembly (ATA) Nitrogen Vent lines, in preparation for the ATA to be removed during EVA 1.
Sept. 1 (Flight Day 5 – EVA 1)
EVA 1 was performed, and saw the removal of the empty Ammonia Tank Assembly, and the removal and stowage of the EuTeff and MISEE 6 experiments. While the spacewalk was going on crew members inside were transferring the Crew Quarters, C.O.L.B.E.R.T treadmill and the Node 3 Air Revitalization System rack (ARS). The treadmill and ARS were temporarily stowed, while the crew Quarters was installed in the Kibo Module where setup and activation was begun.
Sept. 2 (Flight Day 6)
During flight day 6 the joint crews continued the activation of the new crew quarters. The last of the major transfer items, the Fluids Integrated Rack (FIR), Materials Science Research Rack and the Minus Eighty Laboratory Freezer ISS 2 (MELFI-2) were transferred from the Multi-Purpose Logistics Module (MPLM) Leonardo. Astronauts Danny Olivas and José Hernández answered some questions submitted on Youtube and Twitter. Olivas along with Christer Fuglesang also prepared for the second EVA and "camped out" in the air lock at a lower pressure to help get ready for EVA 2 on flight day 7.
Sept. 3 (Flight Day 7 – EVA 2)
On flight day 7, Danny Olivas and Christer Fuglesang performed the second spacewalk of the STS-128 mission. Olivas and Fuglesang installed and connected the new Ammonia Tank Assembly (ATA), and also performed two get aheads. The get ahead tasks included installing protective lens covers on the Space Station Remote Manipulator System (SSRMS) End B cameras . Once the ATA was installed, the tank was integrated into the cooling loop. While Olivas and Fugelsang were outside, the rest of the crew continued on transferring items to and from both the shuttle mid-deck and MPLM.
Sept. 4 (Flight Day 8)
The first part of the crew day was spent off duty. The crews enjoyed a meal, took a crew photo and took part in a PAO event. More transfer was completed by both crews. The space station crew calibrated the Oxygen Generation System (OGS) H2 sensor. Timothy Kopra and Nicole Stott continued their hand over activities, helping Stott who is taking over from Kopra. Danny Olivas and Christer Fuglesang got their space suits ready for the third and final space walk. The pair spent the night in the Quest Joint Airlock, at a lower pressure of 10.2 psi instead of 14.7 psi.
Sept. 5 (Flight Day 9 - EVA 3)
During flight day 9 Danny Olivas and Christer Fuglesang performed EVA 3. The pair completed all tasks that were to be done, including installing two GPS antennas and deploying the Starboard 3 (S3) Payload Attach System (PAS), a new Rate Gyro Assembly (RGA) 2 and routing of Node 3 Avionics cables. The joint crew also completed more transfer, mostly transfer for return to earth in the MPLM and space shuttle mid-deck. The ISS crew also replaced a bolt on the Common Berthing Mechanism (CBM) so that the MPLM won't get stuck, and also to ensure correct capture of the HTV.
Sept. 6 (Flight Day 10 - Off duty)
Flight day 10 saw the joint crews transfer samples from the space station to the shuttle freezer known as Glacier. The samples will be returned to earth for examination by scientists who will develop ways to prevent bone and muscle loss in space as well as cures for other illnesses on earth. The crews also completed some close outs of the Multi-Purpose Logistics Module Leonardo. The last portion of the crew day was spent off duty.
Sept. 7 (Flight Day 11 - Hatch closure)
On flight day 11 the joint ISS/shuttle crews completed transfers and closed the hatches with the MPLM. Once the hatches were closed, the MPLM was deactivated, demated and berthed back in the payload bay of the space shuttle. During this process José Hernández and Nicole Stott took part in a PAO event. The end of the crews work days saw the two crews say goodbye in a farewell ceremony and close the hatches between the shuttle and ISS. Once the hatches were closed, the Pressurized Mating Adapter 2 was depressurized, in advance of undocking. The shuttle crew setup and checked out the rendezvous tools before going to bed.
Sept. 8 (Flight Day 12 - Undocking)
On flight day 12, space shuttle Discovery successfully undocked from the International Space Station at 19:26 UTC. After undocking, the shuttle backed out and performed a fly around of the ISS. The space shuttle then performed 2 separation burns using its thrusters. After the separation burns, astronauts Kevin Ford, José Hernández and Christer Fuglesang used the Orbiter Boom Sensor System (OBSS) to inspect the shuttle's Thermal Protection System (TPS). When they completed that task the OBSS was berthed on the starboard sill of the payload bay and the Shuttle Remote Manipulator System (SRMS) was powered down.
Sept. 9 (Flight Day 13 - End Of Mission Prep)
On flight day 13 the space shuttle crew began stowing items for landing. During the course of the day commander Frederick W. Sturckow and pilot Kevin A. Ford performed standard checks of the Flight Control Systems (FCS), Reaction Control System (RCS) jets and communications with the ground. The crew also deactivated the Wing Leading Edge System (WLES), stowed the Ku-band antenna, and reviewed landing procedures.
Sept. 10 (Flight Day 14 - Landing Postponed)
On flight day 14, Discovery was scheduled to land at Kennedy Space Center at 19:04 EDT (23:04 UTC) which was postponed due to weather conditions, the second opportunity at 20:40 EDT (00:40 UTC) was also postponed due to weather conditions.
Sept. 11 (Flight Day 15 - Landing)
On flight day 15 at 19:47 EDT (23:47 UTC), Discovery started the de-orbit burn for landing at Edwards Air Force Base after two landing attempts at Kennedy Space Center were waved off. Discovery touched down at 20:53 EDT (00:53 UTC).
Spacewalks
Each spacewalk was planned to last approximately 6.5 hours.[39]
EVA # | Spacewalkers | Start (UTC) | End (UTC) | Duration |
---|---|---|---|---|
EVA 1 |
John D. Olivas Nicole Stott |
September 1 21:49 UTC |
September 2 04:24 UTC |
6 hours, 35 minutes |
Prepared for the replacement of an empty ammonia tank on the station’s port truss by releasing its bolts. Retrieved the Materials International Space Station Experiment and European Technology Exposure Facility mounted outside the Columbus laboratory, and stowed them in Discovery’s cargo bay for their return to Earth. :Robotic Arm Operators: Ford and Thirsk[2] | ||||
EVA 2 |
John D. Olivas Christer Fuglesang |
September 3 22:13 UTC |
September 4 04:51UTC[40] |
6 hours, 39 minutes |
Removed the new ammonia tank from the shuttle's payload bay and replaced it with the used tank from the station. The new tank, weighing about 1,800 pounds (820 kg), was the most mass ever moved by spacewalking astronauts.
With this spacewalk, ESA astronaut Fuglesang became the first person, who is not from either an American or Russian space program, to have participated in four or more spacewalks. | ||||
EVA 3 |
John D. Olivas Christer Fuglesang |
September 5 20:39 UTC |
September 6 03:40 UTC |
7 hours, 01 minutes |
Preparations for the arrival of the Tranquility node by attaching cables between the starboard truss and the Unity node, the area where Tranquility will be installed. Tranquility is targeted to arrive on STS-130 in February 2010. The spacewalkers also replaced a communications sensor device, installed two new GPS antennas, and replaced a circuit breaker. |
Wake-up calls
A tradition for NASA human spaceflights since the days of Gemini, mission crews are played a special musical track at the start of each day in space. Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[41][42]
Media
-
Discovery on the pad August 6, 2009
-
Discovery poised for lift-off
-
Launch from 180 miles away (long exposure)
-
STS-128 as seen from Bartram Springs in Jacksonville, FL
-
Long exposure picture of STS-128 launching
-
Video of launch
-
Olivas(left) and Stott (right) during EVA 1.
-
Leonardo is placed back in Discovery's payload bay.
See also
- 2009 in spaceflight
- List of ISS spacewalks
- List of space shuttle missions
- List of spacewalks since 2000
- List of human spaceflights
References
- ^ Ryba, Jeanne (August 25, 2009). "Latest Shutle News – Launch Team Targets Aug. 28 Launch". NASA.gov. Retrieved August 26, 2009.
- ^ a b c d NASA: STS-128 Press Kit
- ^ a b Smith, Yvette (16 July 2008). "NASA Assigns Crew for Equipment Delivery Mission to Space Station". NASA. Retrieved 5 August 2009.
- ^ a b c Bergin, Chris (2009-08-24). "STS-128 Scrubbed due to unacceptable weather – 24 hour turnaround". nasaspaceflight.com. Retrieved 2009-08-26.
- ^ a b c Harwood, William (2009-08-25). "Weather scrubs shuttle Discovery's late-night launch". Spaceflightnow.com for CBS. Retrieved 2009-08-26.
- ^ a b c Simantov, Matthew (August 25, 2009). "Space shuttle Discovery launch attempt scrubbed due to weather". Orlando Sentinel. Retrieved 2009-08-25.
- ^ a b Harwood, William (2009-08-25). "Another scrub for space shuttle Discovery's launch". Spaceflightnow.com for CBS. Retrieved 2009-08-26.
- ^ a b Bergin, Chris (2009-08-25). "SCRUB: Second STS-128 launch attempt scrubbed due to valve issue". nasaspaceflight.com. Retrieved 2009-08-26.
- ^ a b http://www.foxnews.com/story/0,2933,542641,00.html
- ^ Curie, Michael (3 March 2009). "NASA Announces Change for Return of Station Crew Members" (Press release). NASA. Retrieved 23 August 2009.
{{cite press release}}
: Check date values in:|accessdate=
and|date=
(help) - ^ "Name and logo unveiled for Christer Fuglesang's mission to the ISS" (Press release). European Space Agency. 3 August 2009. Retrieved 23 August 2009.
{{cite press release}}
: Check date values in:|accessdate=
and|date=
(help) - ^ "Space Flight Systems Directorate Activities Report March 23 - April 3, 2009" (PDF). NASA. 2003. Retrieved August 10 2009.
{{cite web}}
: Check date values in:|accessdate=
(help) - ^ Bergin, Chris (22 June 2009). "Discovery handed special heatshield coating DTO on behalf of Orion". NASAspaceflight.com. Retrieved 5 August 2009.
- ^ Bergin, Chris (25 July 2009). "STS-128: Discovery rolls to VAB on Sunday following ET-132 clearance". NASAspaceflight.com. Retrieved 5 August 2009.
- ^ Bergin, Chris (30 July 2009). "Endeavour tracking KSC return on Friday – TPS cleared for entry". NASAspaceflight.com. Retrieved 5 August 2009.
- ^ Bergin, Chris (21 July 2009). "STS-128: Completed ET-132 intertank pull tests show positive results". NASAspaceflight.com. Retrieved 5 August 2009.
- ^ Bergin, Chris (29 July 2009). "Endeavour completes Late Inspections – Candidate found for ET-131 foam loss". NASAspaceflight.com. Retrieved 5 August 2009.
- ^ Bergin, Chris (2 August 2009). "Understanding ET-131's rogue foam liberations leads to ET-132 confidence". NASAspaceflight.com. Retrieved 5 August 2009.
- ^ Bergin, Chris (13 July 2009). "Bad weather scrubs fifth attempt for STS-127 – GUCP investigation results". NASAspaceflight.com. Retrieved 5 August 2009.
- ^ Ryba, Jeanne (5 August 2009). "NASA - Archive". NASA. Retrieved 5 August 2009.
- ^ "Discovery astronauts in town for practice countdown". spaceflightnow.com. 2009-08-05. Retrieved 2009-08-12.
- ^ Bergin, Chris (3 August 2009). "Discovery completes dramatic rollout – Unique SRB repairs to take place at Pad". NASAspaceflight.com. Retrieved 5 August 2009.
- ^ a b Bergin, Chris (2009-08-07). "Risk assessment debate for STS-128 tank – Rollback is a potential option". nasaspaceflight.com. Retrieved 2009-08-12.
- ^ Bergin, Chris (2009-08-10). "STS-128: Managers head into FRR debate – Void in suspect IFR highlighted". nasaspaceflight.com. Retrieved 2009-08-12.
- ^ Harwood, William (2009-08-07). "Engineers continue to assess shuttle fuel tank foam". spaceflightnow.com from CBS. Retrieved 2009-08-12.
- ^ Harwood, William (2009-08-18). "Discovery's fuel tank cleared for launch after foam debate". Spaceflightnow.com from CBS. Retrieved 2009-08-19.
- ^ a b Harwood, William (2009-08-26). "Discovery testing finds no problem with suspect valve". spaceflightnow.com for CBS. Retrieved 2009-08-27.
- ^ a b Bergin, Chris (2009-08-26). "STS-128: PV12 troubleshooting begins ahead of MMT launch decision". nasaspaceflight.com. Retrieved 2009-08-27.
- ^ a b Bergin, Chris (2009-08-27). "STS-128 held a further 24 hours for PV12 data gathering". nasaspaceflight.com. Retrieved 2009-08-27.
- ^ Harwood, William (2009-08-27). "Shuttle Discovery's launch pushed back to Friday night". spaceflightnow.com for CBS. Retrieved 2009-08-31.
- ^ "Management team clears Discovery for launch". spaceflightnow.com for CBS. 2009-08-28. Retrieved 2009-08-31.
- ^ "STS-128 MCC Status Report #01". NASA. 2009-08-28. Retrieved 2009-08-31.
- ^ Harwood, William (2009-08-28). "Discovery en route to space station for delivery mission". spaceflightnow.om for CBS. Retrieved 2009-08-31.
- ^ Bergin, Chrisz (2009-08-28). "Discovery launches after smooth countdown". nasaspaceflight.com. Retrieved 2009-08-31.
- ^ "Third time lucky for space shuttle Discovery in dramatic midnight launch Read more: http://www.dailymail.co.uk/news/worldnews/article-1209856/Third-time-lucky-space-shuttle-Discovery-dramatic-midnight-launch.html#ixzz0PZmS1Kol". Daily Mail. Retrieved 2009-08-29.
{{cite news}}
: External link in
(help)|title=
- ^ a b "Update: Shuttle countdown on tap; weather 70 percent 'go' for Tuesday launch". CBS News. 2009-08-21. Retrieved 2009-08-29.
- ^ "Update: Mission Management Team clears shuttle Discovery for Friday night launch try". CBS News. 2009-08-28. Retrieved 2009-08-29.
- ^ Cite error: The named reference
launch 3
was invoked but never defined (see the help page). - ^ "STS-128 factsheet" (PDF). NASA. 1 August 2009. Retrieved 5 August 2009.
- ^ "Spaceflight Now STS-128 Mission Status Center". Spaceflightnow. 2009-09-03. Retrieved 2009-09-03.
- ^ Fries, Colin (June 25, 2007). "Chronology of Wakeup Calls" (PDF). NASA. Retrieved 2007-08-13.
- ^ "STS-127 Wakeup Calls". NASA. May 11, 2009. Retrieved May 11, 2009.
External links
- NASA's space shuttle page
- NASA's Consolidated Launch Manifest
- christerfuglesang.se Swedish language website detailing the role of Christer Fuglesang in the mission.
- STS-128 press kit from NASA
- STS-128 official flight kit manifest