Line 10 (Shanghai Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:42, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 10
Overview
Other name(s)M1 (planned name)
StatusOperational, extension to Jilong Road under construction
LocaleMinhang, Changning, Xuhui, Huangpu, Jing'an, Hongkou, and Yangpu districts
Shanghai
Termini
Stations37
Service
TypeRapid transit
SystemShanghai Metro
Daily ridership1.085 million (2019 peak)[1]
History
OpenedApril 10, 2010; 14 years ago (2010-04-10)
Technical
Line length45 km (27.96 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts DC)
Operating speed80 km/h (49.71 mph)
Route map
Line 10 (十号线)

Line 10 is a southwest-northeast line of the Shanghai Metro network. It officially opened for service on April 10, 2010.[2][3] The line runs from Template:SHM stations to Template:SHM stations, with a branch line from Template:SHM stations to Template:SHM stations. It connects the Hongqiao International Airport with the downtown core of Shanghai, and also the dense residential districts of Yangpu and Hongkou.[4]

The line is fully automated and driverless. It is the only line in the system with numbered station codes, and is colored lilac on system maps.

To scale map of Shanghai Metro Line 10

Stations

Service
routes[5]
Station
Station name Connections Distance
km
Location
English Chinese
L10/01 Template:SHM stations 虹桥火车站  2   17  Shanghai Hongqiao railway station AOH 0.00 0.00 Minhang
L10/02 Template:SHM stations 虹桥2号航站楼  2  Shanghai Hongqiao International Airport SHA 0.56 0.56
L10/03 Template:SHM stations 虹桥1号航站楼 Shanghai Hongqiao International Airport SHA 1.93 2.49
L10/04 Template:SHM stations 上海动物园 1.96 4.45 Changning
L10/05-3 Template:SHM stations 航中路 1.03 5.48 Minhang
L10/05-2 Template:SHM stations 紫藤路 1.19 6.67
L10/05-1 Template:SHM stations 龙柏新村 2.38 9.05
L10/05 Template:SHM stations 龙溪路 1.27 10.32 Changning
L10/06 Template:SHM stations 水城路 1.27 11.59
L10/07 Template:SHM stations 伊犁路 1.25 12.84
L10/08 Template:SHM stations 宋园路 0.81 13.65
L10/09 Template:SHM stations 虹桥路  3   4  0.99 14.64 Xuhui
L10/10 Template:SHM stations 交通大学  11  1.27 15.91
L10/11 Template:SHM stations 上海图书馆 1.18 17.09
L10/12 Template:SHM stations 陕西南路  1   12  1.54 18.63 Huangpu
L10/13 Template:SHM stations 新天地  13  1.68 20.31
L10/14 Template:SHM stations 老西门  8  0.86 21.17
L10/15 Template:SHM stations 豫园 1.35 22.52
L10/16 Template:SHM stations 南京东路  2  1.17 23.69
L10/17 Template:SHM stations 天潼路  12  0.71 24.40 Jing'an
L10/18 Template:SHM stations 四川北路 0.92 25.32 Hongkou
L10/19 Template:SHM stations 海伦路  4  0.92 26.24
L10/20 Template:SHM stations 邮电新村 1.19 27.43
L10/21 Template:SHM stations 四平路  8  1.01 28.44
L10/22 Template:SHM stations 同济大学 0.97 29.41 Yangpu
L10/23 Template:SHM stations 国权路 0.84 30.25
L10/24 Template:SHM stations 五角场 1.02 31.27
L10/25 Template:SHM stations 江湾体育场 0.60 31.87
L10/26 Template:SHM stations 三门路 1.26 33.13
L10/27 Template:SHM stations 殷高东路 1.00 34.13
L10/28 Template:SHM stations 新江湾城 0.79 34.92
L10/29 Template:SHM stations 国帆路 1.54 36.46 Yangpu
L10/30 Template:SHM stations 双江路 3.25 39.71 Pudong
L10/31 Template:SHM stations 高桥西 1.35 41.06
L10/32 Template:SHM stations 高桥 1.20 42.26
L10/33 Template:SHM stations 港城路  6  0.99 43.25
L10/34 Template:SHM stations 基隆路 1.69 44.94

Note: Eastbound trains from Hongqiao Railway Station may terminate at Jiangwan Stadium.

Important stations

History

Segment Commencement Length Station(s) Name
Longxi Road — Xinjiangwancheng 10 April 2010 24.76 km (15.39 mi) 24 Phase I (1st section)
Hangzhong Road — Longxi Road 4.84 km (3.01 mi) 3
Hongqiao Railway Station — Longxi Road 30 November 2010 5.8 km (3.60 mi) 4 Phase I (2nd section)

Future

The second phase, under construction, is a northern extension of the first phase of Line 10 from Template:SHM stations to Template:SHM stations. This phase will be completed by 2020.

Rolling stock

Type Time of manufacturing Series Sets Assembly Notes
Type A 2009-2010 10A01 41 Tc+Mp+M+M+Mp+Tc Manufactured by Alstom and CSR Puzhen.
Type A 2017- 10A02 26 Tc+Mp+M+M+Mp+Tc Manufactured by CSR Puzhen.

References

  1. ^ 2019最后一天上海地铁运送客流【1303.35万人次】跨年夜延时加开63列次 (in Chinese). 上海地铁shmetro. 2020-01-02. Retrieved 2020-01-09.
  2. ^ 10号线4月10日提前开通试运营. Shanghai Metro. Retrieved 9 April 2010.
  3. ^ "组图:轨道交通10号线10日提前开通试运营_世博频道_腾讯网". 2010.qq.com.
  4. ^ "Shanghai metro reaches Hongqiao Airport". Railway Gazette International. 2010-03-16.
  5. ^ "10号线9月25日起增设小交路 夜间加开定点加班车".