Baku Olympic Stadium

Coordinates: 40°25′47″N 49°55′11″E / 40.429766°N 49.91979°E / 40.429766; 49.91979
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by RHaworth (talk | contribs) at 12:18, 8 April 2016 (RHaworth moved page Baku Olympic Stadium (BOS) to Baku Olympic Stadium). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Baku Olympic Stadium
UEFA Category 4 Stadium
Map
LocationBaku, Azerbaijan
OwnerAssociation of Football Federations of Azerbaijan
Capacity68,700
SurfaceGrass
Construction
Broke ground6 June 2011
Opened6 March 2015
ArchitectHeerim, ROSSETTI (Sports Architect)
Structural engineerThornton Tomasetti
General contractorTekfen Construction, Turkey
Tenants
Azerbaijan national football team
2015 European Games
UEFA Euro 2020

Baku Olympic Stadium is a 68,700-seat stadium, designed and constructed to meet the international standards for stadiums set by the Union of European Football Associations (UEFA), the International Federation of Association Football (FIFA) and the International Association of Athletics Federations (IAAF).

Construction of the 225,000-square-meter stadium on a 650,000-square-meter site was completed in February 2015. The six-story, 65.7 meter structure near Boyukshor Lake, Baku, Azerbaijan, opened on 6 March 2015.[1] The main tenant of the stadium is Azerbaijan's national football team, who moved from their previous home at the Tofiq Bahramov Stadium. In June 2015 the stadium served as the main venue for the European Games, hosting the opening and closing ceremonies, and the athletic games. The venue is intended to host the quarterfinals and three of the group games for Euro 2020. A green area is being developed around the stadium, which is accessible via public transport.

History

The ceremony of laying the foundation

June 6, 2011 in celebration of the 100th anniversary of Azerbaijani football was held a ceremony of laying the foundation of the Baku Olympic Stadium. The ceremony was attended by President of Azerbaijan Ilham Aliyev and his spouse Mehriban Aliyeva, and FIFA President Joseph Blatter and UEFA President Michel Platini, prominent members of the global football community, heads of various federations, football veterans and other guests. Azerbaijani President Ilham Aliyev was informed about the future plans for the construction of the stadium. Speaking at the ceremony, FIFA President Joseph S. Blatter said:

"This is really beautiful, grand building, and more than 60 thousand football fans coming to the stadium will be able to enjoy football. "

Then Ilham Aliyev put a symbolic metal capsule inside the ball. The son of the president, Heydar Aliyev, scoring a goal in a symbolic gate, dropped it into the foundation. Later, President Ilham Aliyev, FIFA President Joseph S. Blatter and UEFA President Michel Platini, switched on the installation of concrete pouring and signed on a soccer ball, which will be stored in the memory of the ceremony

Construction

Despite the groundbreaking ceremony took place in 2011, the construction of the stadium has started only in November 2012 with the excavation and backfilling of the stadium area.

In February 2013, it began full-scale construction of the stadium. The work was done in accordance with the International Standard construction (IBC), UEFA and FIFA standards and Azerbaijani construction regulations.

The opening of the stadium took place on March 6, 2015, President Ilham Aliyev participated in the opening ceremony.

Location : Baku, Azerbaijan Client  : State Oil Company of Azerbaijan Republic (SOCAR) Contractor : TEKFEN Construction and Installation Co., INC.

Scope : Turn Key Design and Build of Baku Olympic Stadium Project

Commencement : 27.02.2013

Completion : 28.02.2015

Total Layout Area : 617,000m²

Stadium Capacity : 68,000 ea Seating

Seats at the Warm-up Stadium : 1,800 Other Buildings : MEP Building, Info center and Two External Toilet Buildings

Baku is ready for hosting the European Olympic Games and The Olympic Stadium Project is the most important and prestigious project of this organization. Main Stadium layout area is 87,000 m2, Total Confined Space 215,000 m2, Maximum Height from ground 60.08 m2, 6-Levels Building, Total Car Parking Area Capacity 3,078 cars and VVIP Suites with 126, VIP Suites with 500 spectator’s capacity. • Total 7,000,000 m³ soil movement completed • Piles: 2,469 pcs (Length: 35m, Diameter: 1.2m) • Total 360,000 m³ concrete poured • Reinforcement Steel: 55,000 tons • Formwork: 415,000² • Structural Steel: 21,000tons • Precast Concrete Elements: 8,186pcs • Cable: 2,000,000 m • Sanitary and Fire Piping: 120,000 m • Air Duct: 42,000 m² • Aerated Concrete Wall: 55,000 m² • Aluminum Joinery: 10,000 m² • Total 3300 trucks of materials had been transported • Total 60,000m² Façade and Roof Covering with ETFE • Total 400,000m3 Scaffolding

Improving the ecological status of the lake Boyukshor

According to international experts, the lake Boyukshor, which is built near the stadium, considered one of the most polluted lakes in the world. From the point of view of the fact that most of the activities of the first European Games had to be held on the eastern shore of Lake Boyukshor, in a newly built complex of the Baku Olympic Stadium, and that this area had to receive numerous guests, athletes and tourists was important complex ecological restoration of the lake Boyukhore and surrounding areas. According to the Minister of Economy and Industry Shahin Mustafayev improve environmental conditions and protect the lake Boyukshor planned in the framework of an action plan to improve the ecological status of 9 lakes of the Apsheron Peninsula, "State Program on socio-economic development of Baku and its settlements in 2014–2016".

The project of ecological restoration of the lake will be implemented in two stages. The first stage covered the years 2014–2015. At this stage, the territory was restored lake area of nearly 300 hectares, located near the place where the Olympic Stadium was built. At this stage it was separated and isolated by a dam north of the historic area of the lake contaminated with oil from the coastline. Thus, it blocked the path of oil contaminated waters and floating waste. The dam is designed as a six-lane highway and represents the western border area. In addition, the direction of the stadium installed sewers and built along the waterfront promenade boulevard and go to the stadium. The second phase of the full restoration of the lake Boyukshor cover the years 2015–2020, with the result that the lake will be returned to its natural historical track will adjust the level of the water is restored ecosystem.

On February 28, 2014, President Ilham Aliyev got acquainted with the work on integrated environmental restoration of Lake Boyukshor and surrounding areas.

Construction

Construction of the stadium in Baku

The project is being funded by the SOCAR. A Turkish company Tekfen Construction and Installation Co.,Inc, were given a Design&Build contract.[2][3]

Along with the stadium, there were built a number of hotels, parking venue (total 3,617 car places), and green space (81,574 square meters).[4]

Tekfen Construction successfully completed turn-key design and construction of the project in 24 months and delivered to the client as planned at the commencement of the Project. Completed at an accelerated pace with exceptionally concentrated work and the project was finished after accident-free 20.5 million safe man-hours.[citation needed]

Stadium contains VVIP, VIP - CIP Suites total 127 each with 720 spectator's capacity, total special area of interior 25,200 m2 and Total Car Parking Area Capacity 3,078 cars. 1,800 Seating Capacity Warm Up Area, MEP Building, Info Centre and Two External Buildings are other building of Projects. Design and Engineering Service, Procurement and Logistic Services, Over All Turn Key Coordination Services, HSE Management Service, QA/QC Management Service, Construction Supervision Services and Planning and Project Controls Service.

Events

Baku Stadium

The venue will host games for the Azerbaijan national football team as well as concerts. Baku Olympic Stadium fulfils FIFA's and UEFA's highest technical recommendations and elite stadium obligations for football stadiums and is automatically qualified to arrange tournaments and qualification games in European Football Championships. The stadium hosted athletics, ceremonies during 2015 European Games and Quarter-finals and Group stage during UEFA Euro 2020.

See also

References

  1. ^ "БАКИНСКИЙ ОЛИМПИЙСКИЙ СТАДИОН СДАН В ЭКСПЛУАТАЦИЮ". rekord.az (in Russian). Retrieved 7 March 2015.
  2. ^ Bakıda böyük stadion tikintisi planlaşdırılır Template:Az icon
  3. ^ Ölkədə ən böyük stadionun tikintisinə başlanacaq Template:Az icon
  4. ^ "Bakıdakı yeni stadionda 41 lift və 3617 avtomobil 7 dayanacaq olacaq". Ayna.az. Archived from the original on 8 July 2011. Retrieved 6 June 2011. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)

40°25′47″N 49°55′11″E / 40.429766°N 49.91979°E / 40.429766; 49.91979