This is an old revision of this page, as edited by CaradhrasAiguo(talk | contribs) at 15:28, 13 July 2018(Remove coordinates missing template for rapid transit lines (which do not require coords) using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 15:28, 13 July 2018 by CaradhrasAiguo(talk | contribs)(Remove coordinates missing template for rapid transit lines (which do not require coords) using AWB)
At Jiujiang, the railway will connect with the Wuhan–Jiujiang Passenger Railway (presently under construction; estimated time of completion, 2017), which will provide a continuous high-speed line between Nanchang and Wuhan.