A contract for the construction and operation of Line 1 was awarded to the [[Midland Metro#Economics|Altram]] consortium in August 1995, and construction began three months later.<ref>{{cite web |url= http://www.publications.parliament.uk/pa/cm199596/cmhansrd/vo951120/debtext/51120-27.htm |title=House of Commons Debates (pt 27) |date= 20 November 1995 |publisher=UK Parliament}}</ref> The targeted completion date of August 1998 was missed by ten months, leading to compensation being paid by Altram.<ref>{{cite news |url= http://www.nce.co.uk/big-bill-for-late-midland-metro/832833.article |title=Big bill for late Midland metro |date=11 March 1999 |work=New Civil Engineer |location =London}}</ref>
A contract for the construction and operation of Line 1 was awarded to the [[Midland Metro#Economics|Altram]] consortium in August 1995, and construction began three months later.<ref>{{cite web |url= http://www.publications.parliament.uk/pa/cm199596/cmhansrd/vo951120/debtext/51120-27.htm |title=House of Commons Debates (pt 27) |date= 20 November 1995 |publisher=UK Parliament}}</ref> The targeted completion date of August 1998 was missed by ten months, leading to compensation being paid by Altram.<ref>{{cite news |url= http://www.nce.co.uk/big-bill-for-late-midland-metro/832833.article |title=Big bill for late Midland metro |date=11 March 1999 |work=New Civil Engineer |location =London}}</ref>


The estimated construction cost in 1995 was £145 million (approximately £236 million in 2012 prices).<ref>[http://www.bankofengland.co.uk/education/Pages/inflation/calculator/flash/default.aspx ]{{dead link|date=July 2016}}</ref> Of this, loans and grants from central government accounted for £80m, the [[European Regional Development Fund]] contributed £31m, while the West Midlands Passenger Transport Authority provided £17.1m and Altram contributed £11.4m.<ref name="railway-technology.com">{{cite web |url= http://www.railway-technology.com/projects/midland/ |title=Midland Metro Light Rail Network, United Kingdom |publisher=Railway Technology |year=2011}}</ref>
The estimated construction cost in 1995 was £145 million (approximately £236 million in 2012 prices).<ref>{{cite web|url=http://www.bankofengland.co.uk/education/Pages/inflation/calculator/flash/default.aspx |title=Archived copy |accessdate=2012-06-13 |deadurl=yes |archiveurl=http://www.webcitation.org/6NA5SosVg?url=http%3A%2F%2Fwww.bankofengland.co.uk%2Feducation%2FPages%2Finflation%2Fcalculator%2Fflash%2Fdefault.aspx |archivedate=5 February 2014 |df=dmy }}</ref> Of this, loans and grants from central government accounted for £80m, the [[European Regional Development Fund]] contributed £31m, while the West Midlands Passenger Transport Authority provided £17.1m and Altram contributed £11.4m.<ref name="railway-technology.com">{{cite web |url= http://www.railway-technology.com/projects/midland/ |title=Midland Metro Light Rail Network, United Kingdom |publisher=Railway Technology |year=2011}}</ref>


==Line One==
==Line One==
Line 111: Line 111:
{{Midland-Metro-Line-One-Ext}}
{{Midland-Metro-Line-One-Ext}}
[[File:Midland Metro Line 1 Birmingham Extensions Map.png|thumb|350px|Map of Birmingham extensions to Line 1]]
[[File:Midland Metro Line 1 Birmingham Extensions Map.png|thumb|350px|Map of Birmingham extensions to Line 1]]
The fact that the existing line did not run into [[Birmingham City Centre]] was identified as one of the reasons why it failed to attract the predicted patronage.<ref name=callformetro/> The Birmingham City Centre Extension (BCCE) has extended Line 1 into the streets of central Birmingham. Originally it was planned to terminate the extension at Stephenson Street, adjacent to [[Birmingham New Street railway station|New Street railway station]].<ref>{{cite web|title=Birmingham City Centre Extension and Fleet Replacement|url=http://www.centro.org.uk/metro/CityCentreExtension.aspx|publisher=Centro.org.uk|accessdate=13 February 2013}}</ref> In September 2013, Centro started consultation on proposals to extend the city-centre extension from New Street station to [[Centenary Square tram stop|Centenary Square]]. This would be another stage towards extending the line to [[Five Ways, Birmingham|Five Ways]] the original planned destination.<ref>{{cite web|title=Centro unveils plans to extend the Metro to Centenary Square|url=http://www.thebusinessdesk.com/westmidlands/news/512501-centro-unveils-plans-to-extend-the-metro-to-centenary-square.html#|publisher=The Business Desk|accessdate=15 October 2013}}</ref> The plan was approved by Birmingham City Council in October, allowing the line to add an additional stop at [[Birmingham Town Hall tram stop|Birmingham Town Hall]].<ref>{{cite news |url= http://www.birminghampost.co.uk/news/local-news/major-step-forward-midland-metro-6184070 |title= Major step forward for Midland Metro plans |author= Brown, Graeme |date=15 October 2013 |work= Birmingham Post}}</ref>
The fact that the existing line did not run into [[Birmingham City Centre]] was identified as one of the reasons why it failed to attract the predicted patronage.<ref name=callformetro/> The Birmingham City Centre Extension (BCCE) has extended Line 1 into the streets of central Birmingham. Originally it was planned to terminate the extension at Stephenson Street, adjacent to [[Birmingham New Street railway station|New Street railway station]].<ref>{{cite web|title=Birmingham City Centre Extension and Fleet Replacement |url=http://www.centro.org.uk/metro/CityCentreExtension.aspx |publisher=Centro.org.uk |accessdate=13 February 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20130301092209/http://www.centro.org.uk:80/metro/CityCentreExtension.aspx |archivedate=1 March 2013 |df=dmy }}</ref> In September 2013, Centro started consultation on proposals to extend the city-centre extension from New Street station to [[Centenary Square tram stop|Centenary Square]]. This would be another stage towards extending the line to [[Five Ways, Birmingham|Five Ways]] the original planned destination.<ref>{{cite web|title=Centro unveils plans to extend the Metro to Centenary Square|url=http://www.thebusinessdesk.com/westmidlands/news/512501-centro-unveils-plans-to-extend-the-metro-to-centenary-square.html#|publisher=The Business Desk|accessdate=15 October 2013}}</ref> The plan was approved by Birmingham City Council in October, allowing the line to add an additional stop at [[Birmingham Town Hall tram stop|Birmingham Town Hall]].<ref>{{cite news |url= http://www.birminghampost.co.uk/news/local-news/major-step-forward-midland-metro-6184070 |title= Major step forward for Midland Metro plans |author= Brown, Graeme |date=15 October 2013 |work= Birmingham Post}}</ref>


The extension diverges from the previous line between Snow Hill and St Paul's stops. A viaduct has been constructed that carries the line into the streets.<ref>{{cite web |url= http://www.centro.org.uk/nmsruntime/saveasdialog.aspx?lID=2531&sID=4972 |title= Strategic Case |publisher=Centro}}</ref> The existing terminus at Snow Hill has been closed, which has allowed a fourth platform at Snow Hill to be reinstated for railway use.<ref>{{cite web |url= http://www.networkrail.co.uk/browse%20documents/StrategicBusinessPlan/RoutePlans/2009/Route%2017%20-%20West%20Midlands.pdf |title=Connecting Local Communities |publisher=Network Rail |year=2009}}</ref> It was replaced by a new stop further west near Snow Hill station's second entrance on Livery Street, allowing continued interchange with National Rail services.<ref>{{cite news |url= http://www.rail.co/2011/03/31/new-rail-station-entrance-boosts-access-to-birmingham/ |title= New rail station entrance boosts access to Birmingham |last1=Samuel |first1=A. |date=31 March 2011 |work= Rail.co |accessdate=31 March 2011}}</ref>
The extension diverges from the previous line between Snow Hill and St Paul's stops. A viaduct has been constructed that carries the line into the streets.<ref>{{cite web |url= http://www.centro.org.uk/nmsruntime/saveasdialog.aspx?lID=2531&sID=4972 |title= Strategic Case |publisher=Centro}}</ref> The existing terminus at Snow Hill has been closed, which has allowed a fourth platform at Snow Hill to be reinstated for railway use.<ref>{{cite web |url= http://www.networkrail.co.uk/browse%20documents/StrategicBusinessPlan/RoutePlans/2009/Route%2017%20-%20West%20Midlands.pdf |title=Connecting Local Communities |publisher=Network Rail |year=2009}}</ref> It was replaced by a new stop further west near Snow Hill station's second entrance on Livery Street, allowing continued interchange with National Rail services.<ref>{{cite news|url=http://www.rail.co/2011/03/31/new-rail-station-entrance-boosts-access-to-birmingham/ |title=New rail station entrance boosts access to Birmingham |last1=Samuel |first1=A. |date=31 March 2011 |work=Rail.co |accessdate=31 March 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20120320215236/http://www.rail.co/2011/03/31/new-rail-station-entrance-boosts-access-to-birmingham/ |archivedate=20 March 2012 |df=dmy }}</ref>


[[File:Midland Metro - track laying - Upper Bull Street - Birmingham 01.JPG|thumb|left|The first tracks of the extension, laid in upper Bull Street, seen in November 2013]]
[[File:Midland Metro - track laying - Upper Bull Street - Birmingham 01.JPG|thumb|left|The first tracks of the extension, laid in upper Bull Street, seen in November 2013]]
Line 120: Line 120:
[[File:MMreversing.jpg|right|thumb|In June 2016, shortly after the opening of the extension to Grand Central (New Street Station), a tram stands on the reversing spur in Stephenson Street. The extension to Centenary Square will continue to the right behind the tram along Pinfold Street.]]
[[File:MMreversing.jpg|right|thumb|In June 2016, shortly after the opening of the extension to Grand Central (New Street Station), a tram stands on the reversing spur in Stephenson Street. The extension to Centenary Square will continue to the right behind the tram along Pinfold Street.]]


An order authorising the BCCE was made in July 2005.<ref>{{cite web |url= http://www.opsi.gov.uk/si/si2005/20051794.htm |title=The Midland Metro (Birmingham City Centre Extension, etc.) Order 2005 |publisher=[[Office of Public Sector Information]] |year=2005}}</ref> Government approval was given on 16 February 2012 for the extension, a new fleet of trams and a new depot at Wednesbury; the sanctioned sum is £128m, of which £75.4m will be provided by the Department for Transport. The first new tram is scheduled to come into service on the existing line in February 2014, while the enlarged depot will be available in August 2013. The extension as far as New Street station and the full new tram fleet were scheduled to be in service from March 2015 (although the service had still not commenced by 19 November 2015 when [[Elizabeth II|The Queen]] visited Birmingham and named one of the new trams),<ref>{{cite web|url=http://www.bbc.co.uk/news/uk-england-birmingham-34865657 |title=Queen officially reopens New Street station on Birmingham tour |publisher=BBC News |accessdate=2016-07-21}}</ref> with the further extension to Centenary Square in operation from 2017.<ref>{{cite news |url= http://www.birminghammail.net/news/top-stories/2012/02/16/128m-birmingham-midland-metro-extension-from-snow-hill-station-to-new-street-station-set-to-create-1-300-jobs-gets-go-ahead-97319-30343973/ |title=£128m Birmingham Midland Metro extension from Snow Hill Station to New Street Station set to create 1,300 jobs gets go-ahead |first=Jonathan |last=Walker |work=Birmingham Mail |date=16 February 2012 |accessdate=16 February 2012}}</ref><ref>{{cite press release |title=Construction of Midland Metro extension to begin |publisher=Department for Transport |date=16 February 2012 |url= http://nds.coi.gov.uk/content/detail.aspx?NewsAreaId=2&ReleaseID=423315&SubjectId=2 |accessdate=16 February 2012 }}</ref> On 14 June 2012 works on the extension officially began. Initial works include the relocation of underground services on Bull Street and Corporation Street.<ref name=bp>{{cite news |title= Transport minister launches scheme to extend Midland Metro to Birmingham New Street |url= http://www.birminghampost.net/news/west-midlands-transport-news/2012/06/14/transport-minister-launches-scheme-to-extend-the-midland-metro-to-birmingham-new-street-65233-31178982/|date=14 June 2012 |work=Birmingham Post |accessdate=14 June 2012 |first=Matt |last=Lloyd}}</ref>
An order authorising the BCCE was made in July 2005.<ref>{{cite web|url=http://www.opsi.gov.uk/si/si2005/20051794.htm |title=The Midland Metro (Birmingham City Centre Extension, etc.) Order 2005 |publisher=[[Office of Public Sector Information]] |year=2005 |deadurl=yes |archiveurl=https://web.archive.org/web/20080123114603/http://www.opsi.gov.uk:80/si/si2005/20051794.htm |archivedate=23 January 2008 |df=dmy }}</ref> Government approval was given on 16 February 2012 for the extension, a new fleet of trams and a new depot at Wednesbury; the sanctioned sum is £128m, of which £75.4m will be provided by the Department for Transport. The first new tram is scheduled to come into service on the existing line in February 2014, while the enlarged depot will be available in August 2013. The extension as far as New Street station and the full new tram fleet were scheduled to be in service from March 2015 (although the service had still not commenced by 19 November 2015 when [[Elizabeth II|The Queen]] visited Birmingham and named one of the new trams),<ref>{{cite web|url=http://www.bbc.co.uk/news/uk-england-birmingham-34865657 |title=Queen officially reopens New Street station on Birmingham tour |publisher=BBC News |accessdate=2016-07-21}}</ref> with the further extension to Centenary Square in operation from 2017.<ref>{{cite news |url= http://www.birminghammail.net/news/top-stories/2012/02/16/128m-birmingham-midland-metro-extension-from-snow-hill-station-to-new-street-station-set-to-create-1-300-jobs-gets-go-ahead-97319-30343973/ |title=£128m Birmingham Midland Metro extension from Snow Hill Station to New Street Station set to create 1,300 jobs gets go-ahead |first=Jonathan |last=Walker |work=Birmingham Mail |date=16 February 2012 |accessdate=16 February 2012}}</ref><ref>{{cite press release |title=Construction of Midland Metro extension to begin |publisher=Department for Transport |date=16 February 2012 |url= http://nds.coi.gov.uk/content/detail.aspx?NewsAreaId=2&ReleaseID=423315&SubjectId=2 |accessdate=16 February 2012 }}</ref> On 14 June 2012 works on the extension officially began. Initial works include the relocation of underground services on Bull Street and Corporation Street.<ref name=bp>{{cite news |title= Transport minister launches scheme to extend Midland Metro to Birmingham New Street |url= http://www.birminghampost.net/news/west-midlands-transport-news/2012/06/14/transport-minister-launches-scheme-to-extend-the-midland-metro-to-birmingham-new-street-65233-31178982/|date=14 June 2012 |work=Birmingham Post |accessdate=14 June 2012 |first=Matt |last=Lloyd}}</ref>
{{Midland-Metro-Edgbaston}}
{{Midland-Metro-Edgbaston}}


Line 154: Line 154:
In November 2013, Birmingham City Council leader [[Albert Bore]] announced that a task group was considering the construction of a second metro line from Birmingham City Centre, along Fazeley Street to Birmingham Airport and terminating at Coventry. Simultaneously, Centro released a proposed map of the route, taking in a loop between the interchange at the airport, Small Heath and Lea Hall.<ref>{{cite news |title=Tram line could link Coventry and Birmingham |url= http://www.bbc.co.uk/news/uk-england-coventry-warwickshire-24899547 |work=BBC News |date=12 November 2013 |accessdate=13 November 2013}}</ref> The line would spread the benefits of integrated transport beyond the centre of Birmingham and was part of a wider initiative to better connect both cities to the proposed [[High Speed 2]] interchange at [[Curzon Street Station|Curzon Street]].<ref>{{cite news |title= Birmingham to Coventry Metro Line Being Considered |url= http://www.birminghampost.co.uk/news/birmingham-coventry-metro-line-being-6287104 |work=Birmingham Post |author=Elkes, Neil |date=8 November 2013 |accessdate=11 November 2013}}</ref>
In November 2013, Birmingham City Council leader [[Albert Bore]] announced that a task group was considering the construction of a second metro line from Birmingham City Centre, along Fazeley Street to Birmingham Airport and terminating at Coventry. Simultaneously, Centro released a proposed map of the route, taking in a loop between the interchange at the airport, Small Heath and Lea Hall.<ref>{{cite news |title=Tram line could link Coventry and Birmingham |url= http://www.bbc.co.uk/news/uk-england-coventry-warwickshire-24899547 |work=BBC News |date=12 November 2013 |accessdate=13 November 2013}}</ref> The line would spread the benefits of integrated transport beyond the centre of Birmingham and was part of a wider initiative to better connect both cities to the proposed [[High Speed 2]] interchange at [[Curzon Street Station|Curzon Street]].<ref>{{cite news |title= Birmingham to Coventry Metro Line Being Considered |url= http://www.birminghampost.co.uk/news/birmingham-coventry-metro-line-being-6287104 |work=Birmingham Post |author=Elkes, Neil |date=8 November 2013 |accessdate=11 November 2013}}</ref>


In February 2014, it was announced that funding had been secured for the first phase of Midland Metro's Line Two extension to Eastside, including three new stops at either Moor Street or Albert Street, and Curzon Street,<ref name="birminghampost.co.uk">{{cite news|last=Brown |first=Graeme |url=http://www.birminghampost.co.uk/business/business-news/50m-invested-take-midland-metro-6750287 |title=£50m invested to take Midland Metro to Curzon Street |newspaper=[[Birmingham Post]] |date=2014-02-27 |accessdate=2016-07-21}}</ref> before a terminus at Adderley Street.<ref name="birminghampost.co.uk"/> Centro are currently undertaking public consultation of two proposed routes, with both proposals aiming to join the existing Line One at a junction between Bull St and Corporation St.<ref>[http://www.centro.org.uk/metro/other-metro-extensions/birmingham-eastside/the-details/ ]{{dead link|date=July 2016}}</ref> The main aim of the consultation is to establish whether commuters would prefer a shorter, and therefore quicker, route through to Curzon Street from New Street, or if a slightly longer route with a tram stop directly outside [[Moor Street railway station|Moor Street]] would be more agreeable. If the latter option were favoured, it would mark the achievement of what has long been regarded as a major aim for the Metro, namely to connect all three (four when Curzon St reopens) city-centre stations by rapid transit. Any extension would have to be completed before the projected commencement of [[High Speed 2]] services in 2026.
In February 2014, it was announced that funding had been secured for the first phase of Midland Metro's Line Two extension to Eastside, including three new stops at either Moor Street or Albert Street, and Curzon Street,<ref name="birminghampost.co.uk">{{cite news|last=Brown |first=Graeme |url=http://www.birminghampost.co.uk/business/business-news/50m-invested-take-midland-metro-6750287 |title=£50m invested to take Midland Metro to Curzon Street |newspaper=[[Birmingham Post]] |date=2014-02-27 |accessdate=2016-07-21}}</ref> before a terminus at Adderley Street.<ref name="birminghampost.co.uk"/> Centro are currently undertaking public consultation of two proposed routes, with both proposals aiming to join the existing Line One at a junction between Bull St and Corporation St.<ref>{{cite web|url=http://www.centro.org.uk/metro/other-metro-extensions/birmingham-eastside/the-details/ |title=Archived copy |accessdate=2014-03-15 |deadurl=yes |archiveurl=https://web.archive.org/web/20140316021020/http://www.centro.org.uk/metro/other-metro-extensions/birmingham-eastside/the-details/ |archivedate=16 March 2014 |df=dmy }}</ref> The main aim of the consultation is to establish whether commuters would prefer a shorter, and therefore quicker, route through to Curzon Street from New Street, or if a slightly longer route with a tram stop directly outside [[Moor Street railway station|Moor Street]] would be more agreeable. If the latter option were favoured, it would mark the achievement of what has long been regarded as a major aim for the Metro, namely to connect all three (four when Curzon St reopens) city-centre stations by rapid transit. Any extension would have to be completed before the projected commencement of [[High Speed 2]] services in 2026.


====Present confirmed expansion plans====
====Present confirmed expansion plans====
Line 195: Line 195:
==Sprint==
==Sprint==
{{SprintQuinton}}
{{SprintQuinton}}
In July 2014, it was announced that a new [[Bus rapid transit|BRT]] bus-tram service named Sprint would be introduced on the [[Hagley Road]], from which it would connect with the western end of [[Midland Metro#Line One (Birmingham City Centre) Extension|Midland Metro's Line One extension]].<ref>{{cite news|last=Brown |first=Graeme |url=http://www.birminghampost.co.uk/business/business-news/sprint-buses-down-hagley-road-7529015 |title=Sprint buses down Hagley Road by 2016 under £15m plans |newspaper=[[Birmingham Post]] |date=2014-07-30 |accessdate=2016-07-21}}</ref> Viewed as 'Metro's Little Sister', Sprint is intended to offer a higher level of service quality than standard bus services, and will feature some bus priority measures, like bus lanes and priority signalling to speed up service. Sprint should grow demand, and improve connectivity in areas which do not yet fully justify Metro access.<ref>[http://www.railpro.co.uk/magazine/?idArticles=612 ]{{dead link|date=July 2016}}</ref> Centro themselves have stated that the new Birmingham-Quinton route was chosen primarily for its potential for economic growth.<ref>{{cite web|url=http://www.centro.org.uk/transport/sprint/sprint-network-vision/ |title=Sprint Network Vision - Sprint |website=Centro.org.uk |date=2016-06-17 |accessdate=2016-07-21}}</ref> The route will have 16 stops.<ref>{{cite web|url=http://bearwoodblog.files.wordpress.com/2014/07/may14044-sprint-leaflet.pdf |format=PDF |title=Sprint : Metro's Little Sister |website=Bearwoodblog.files.wordpress.com |accessdate=2016-07-21}}</ref>
In July 2014, it was announced that a new [[Bus rapid transit|BRT]] bus-tram service named Sprint would be introduced on the [[Hagley Road]], from which it would connect with the western end of [[Midland Metro#Line One (Birmingham City Centre) Extension|Midland Metro's Line One extension]].<ref>{{cite news|last=Brown |first=Graeme |url=http://www.birminghampost.co.uk/business/business-news/sprint-buses-down-hagley-road-7529015 |title=Sprint buses down Hagley Road by 2016 under £15m plans |newspaper=[[Birmingham Post]] |date=2014-07-30 |accessdate=2016-07-21}}</ref> Viewed as 'Metro's Little Sister', Sprint is intended to offer a higher level of service quality than standard bus services, and will feature some bus priority measures, like bus lanes and priority signalling to speed up service. Sprint should grow demand, and improve connectivity in areas which do not yet fully justify Metro access.<ref>{{cite web|url=http://www.railpro.co.uk/magazine/?idArticles%3D612 |title=Archived copy |accessdate=2013-02-14 |deadurl=yes |archiveurl=https://web.archive.org/web/20140808044716/http://www.railpro.co.uk/magazine/?idArticles=612 |archivedate=8 August 2014 |df=dmy }}</ref> Centro themselves have stated that the new Birmingham-Quinton route was chosen primarily for its potential for economic growth.<ref>{{cite web|url=http://www.centro.org.uk/transport/sprint/sprint-network-vision/ |title=Sprint Network Vision - Sprint |website=Centro.org.uk |date=2016-06-17 |accessdate=2016-07-21}}</ref> The route will have 16 stops.<ref>{{cite web|url=http://bearwoodblog.files.wordpress.com/2014/07/may14044-sprint-leaflet.pdf |format=PDF |title=Sprint : Metro's Little Sister |website=Bearwoodblog.files.wordpress.com |accessdate=2016-07-21}}</ref>


If the Quinton line is successful, there are plans to expand Sprint by running a service down the [[Coventry Road]] to the airport, connecting with the existing Sprint service in the city, thereby providing a cross-city connection which is currently not offered by bus or Metro.
If the Quinton line is successful, there are plans to expand Sprint by running a service down the [[Coventry Road]] to the airport, connecting with the existing Sprint service in the city, thereby providing a cross-city connection which is currently not offered by bus or Metro.

Revision as of 04:10, 9 November 2016

Midland Metro
File:2016 Midland Metro logo.svg
Urbos 3 trams at the Midland Metro depot in Wednesbury
Urbos 3 trams at the Midland Metro depot in Wednesbury
Overview
OwnerTransport for West Midlands
Area servedBirmingham, Wolverhampton
LocaleWest Midlands county
Transit typeTram/Light rail
Number of lines1
Number of stations26
(9 more awaiting construction)
Annual ridership4.8 million (2015/16)[1]
Websitenxbus.co.uk/the-metro/
Operation
Began operation30 May 1999
Operator(s)National Express Midland Metro
Number of vehicles21 Urbos 3
Technical
System length13 miles (21 km)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead line (750 V DC)
Top speed43.5 miles per hour (70.0 km/h)

The Midland Metro is a light-rail/tram line in the West Midlands of England operating between Birmingham and Wolverhampton via West Bromwich and Wednesbury. It is owned and promoted by Transport for West Midlands, and operated by National Express Midland Metro,[2] a subsidiary of National Express.

It opened on 30 May 1999, mostly using the former disused Birmingham Snow Hill to Wolverhampton Low Level Line. An extension into Birmingham City Centre was approved in 2012, and is now operational. Various other extensions, including entirely new lines, are currently under construction.

History

Birmingham once had an extensive tram network run by Birmingham Corporation Tramways. However, as in most British cities, the network was abandoned, with the last tram running in 1953.[3]

1984 proposals

There had been proposals for a light rail or Metro system in Birmingham and the Black Country put forward as early as the 1950s and 1960s, ironically at a time when some of the region's lines and services were beginning to be cut back.[4] However, serious inquiry into the possibility started in 1981 when the West Midlands County Council and the West Midlands Passenger Transport Executive formed a joint planning committee to look at light rail as a means of solving the conurbation's congestion problems. In the summer of 1984 they produced a report entitled "Rapid Transit for the West Midlands" which set out ambitious proposals for a £500 million network of ten light rail routes which would be predominantly street running, but would include some underground sections in Birmingham city centre. One of the proposed routes would have used part of the existing line as far as West Bromwich.[5]

The scheme suffered from several drawbacks, one being that three of the proposed routes, from Birmingham to Sutton Coldfield, Shirley, and Dorridge would take over existing railways, and would have included the conversion into a tramway of the Cross-City Line, between Aston and Blake Street, ending direct rail services to Lichfield. The northern section of the North Warwickshire Line was also to be converted as far as Shirley station, leaving a question mark over existing train services to Stratford-upon-Avon. Tram tracks would also run alongside the existing line to Solihull and Dorridge, with local train services ended.[5]

The most serious drawback however, which proved fatal to the scheme, was that the first proposed route of the network, between Five Ways and Castle Bromwich via the city centre would have involved the demolition of 238 properties. This invoked strong opposition from local residents. The scheme was spearheaded by Wednesfield Labour councillor Phil Bateman,[5] but was eventually abandoned in late 1985 in the face of public opposition, and the Transport Executive was unable to find a Member of Parliament willing to sponsor an enabling Bill.[6]

1988 proposals

T-69 on the former Birmingham Snow Hill to Wolverhampton Low Level Line

Following the abolition of the West Midlands County Council and establishment of a new Passenger Transport Authority in 1986, a new light-rail scheme under the present name "Midland Metro" was revived with a different set of lines. The first of up to 15 lines was intended be operating by the end of 1993, and a network of 200 kilometres was planned to be in use by 2000.[7]

In February 1988, it was announced that the first route, Line 1 would be between Birmingham and Wolverhampton, using much of the disused trackbed of the former Birmingham Snow Hill to Wolverhampton Low Level Line, a route not included in the 1984 recommended network, partly as at that stage the section between Wednesbury and Bilston was still in use, not closing until 1992. The Wednesbury to Birmingham section had closed back in 1972, and the section between Bilston and Wolverhampton was last used in 1983.

A Bill to give Centro powers to build the line was deposited in Parliament in November 1988, and became an Act of Parliament a year later, with completion expected by the mid 1990s.[8]

A three line network was initially planned, and powers were also obtained to build two further routes. Firstly an extension of Line 1 through the city-centre to Five Ways, then a second line, Midland Metro Line 2, running to Chelmsley Wood, and then Birmingham Airport.[9] A third line, Line 3 was also proposed, running from Line 1 at Wolverhampton to Walsall, using much of the disused trackbed of the Wolverhampton and Walsall Railway, and then, using the Wednesbury to Brierley Hill trackbed of the South Staffordshire Line (which would close in 1993) running southwards to Dudley intersecting with Line 1 along the route. This would provide a direct link with the new Merry Hill Shopping Centre, which was built between 1984 and 1989.[8]

Some 25 years later, Line 2 and Line 3 have not been built. In 1997 Centro accepted that they were unable to get funding for the proposed lines, and therefore adopted a strategy of expanding the system in "bite-sized chunks", with the city-centre extension of Line 1 as the first priority. The intention was that the first decade of the 21st century would see the completion of the first of these projects.[8][10]

Work on the Birmingham Metro tram extension began in June 2012, launched by transport minister Norman Baker. The dig was begun at the junction of Corporation Street and Bull Street, with work to move water pipes and power cables.

On Sunday 6 December 2015, Trams entered service on the extension to Bull Street.

Construction

A contract for the construction and operation of Line 1 was awarded to the Altram consortium in August 1995, and construction began three months later.[11] The targeted completion date of August 1998 was missed by ten months, leading to compensation being paid by Altram.[12]

The estimated construction cost in 1995 was £145 million (approximately £236 million in 2012 prices).[13] Of this, loans and grants from central government accounted for £80m, the European Regional Development Fund contributed £31m, while the West Midlands Passenger Transport Authority provided £17.1m and Altram contributed £11.4m.[14]

Line One

Template:Midland-Metro-Line-One

The route of Line One, shown in red

Line 1, the 12.5-mile (20.1 km) Birmingham to Wolverhampton route, was originally opened on 31 May 1999, and runs mostly along the trackbed of the former Great Western Railway line between the two cities which was closed in 1972. Of the 23 tram stops, 11 roughly or directly match former railway stations.[15] Originally, the line terminated at Birmingham Snow Hill station, using the space of one of the former rail platforms. However, in 2015-16, the line was extended across Birmingham city-centre to terminate at Birmingham New Street station.

At the southern end the terminus is Grand Central New Street Station tram stop, which allows interchange with the National Rail network at Birmingham New Street station, it then runs on street through the city-centre to Birmingham Snow Hill station. From there, the line runs north-west, and for the first few miles it runs alongside the Birmingham to Worcester railway line, before the two diverge. Two stations on this stretch (Jewellery Quarter and The Hawthorns) are also tram/railway interchange stations.[16]

At the northern end trams leave the railway trackbed at Priestfield to run along Bilston Road to St Georges terminus in Bilston Street, Wolverhampton city centre. St Georges has no direct interchange with other public transport, but the bus and railway stations can be reached on foot in a few minutes.

The original proposal was to run into the former Wolverhampton Low Level station, but this was abandoned, giving the terminus a link to the very centre of Wolverhampton.[17]

Service pattern

Mondays to Saturdays, services run at eight-minute intervals during the day, and at fifteen-minute intervals during the evenings and on Sundays.[18] Trams take 35 minutes to complete the route.[19]

Fares

Cash fares are distance-related. The scale was originally intended to be broadly comparable with buses, but this proved to be unfinanceable.[20] In January 2013 the adult single fare from Birmingham to Wolverhampton was £2 by bus and £3.60 by tram, although the tram journey is much quicker even when the bus routes are congestion-free. By 2016 the tram fare had risen to £4.[21] In November 2013 Birmingham City Council indicated plans to introduce a smart-card system (similar to London's Oyster Card) to improve access, alongside a range of measures including a new Tube-style map and electric bus networks.[22] This has now launched and is called the Swift card.

Usage

Usage averages about five million passengers annually, and this number appears to have reached a plateau.[23]

Infrastructure

Track, signalling and depot

Line 1 is a standard gauge double-track tramway. Trams are driven manually under a mix of line-of-sight and signals. Turnback crossovers along the line, including in the street section, have point indicators.

On the trackbed section Birmingham to Priestfield, signals are at Black Lake level crossing, and Wednesbury Parkway and Metro Centre. The street section has signals at every set of traffic lights, tied into the road signals to allow tram priority.

The Metro Centre control room, stabling point and depot is near Wednesbury, Great Western Street tram stop, and occupies land once used as railway sidings.

Power

The line is electrified at 750 V DC using overhead lines. The system was renewed in 2010/11, requiring short-term closures.[24][25]

Stops

The tram stops are unstaffed raised platforms with two open-fronted cantilever shelters equipped with seats, a 'live' digital display of services, closed circuit television, and an intercom linked to Metro Centre.[14]

Current extension works

An extension of Line One into Birmingham city centre has been approved, with an extension through Wolverhampton city centre proposed.

Phase one expansion

Line One (Birmingham City Centre) extension

Template:Midland-Metro-Line-One-Ext

Map of Birmingham extensions to Line 1

The fact that the existing line did not run into Birmingham City Centre was identified as one of the reasons why it failed to attract the predicted patronage.[26] The Birmingham City Centre Extension (BCCE) has extended Line 1 into the streets of central Birmingham. Originally it was planned to terminate the extension at Stephenson Street, adjacent to New Street railway station.[27] In September 2013, Centro started consultation on proposals to extend the city-centre extension from New Street station to Centenary Square. This would be another stage towards extending the line to Five Ways the original planned destination.[28] The plan was approved by Birmingham City Council in October, allowing the line to add an additional stop at Birmingham Town Hall.[29]

The extension diverges from the previous line between Snow Hill and St Paul's stops. A viaduct has been constructed that carries the line into the streets.[30] The existing terminus at Snow Hill has been closed, which has allowed a fourth platform at Snow Hill to be reinstated for railway use.[31] It was replaced by a new stop further west near Snow Hill station's second entrance on Livery Street, allowing continued interchange with National Rail services.[32]

The first tracks of the extension, laid in upper Bull Street, seen in November 2013

From Snow Hill the tramway runs along Colmore Circus, Upper Bull Street, Corporation Street and Stephenson Street, with three stops. The second phase of the extension to Centenary Square will then run from Stephenson Street along Pinfold Street, turning into Victoria Square where a new stop will be located alongside the Town Hall. It will then run along Paradise Street to Paradise Circus then turn onto Broad Street, where it will continue to its terminus on Centenary Square.[33]

In June 2016, shortly after the opening of the extension to Grand Central (New Street Station), a tram stands on the reversing spur in Stephenson Street. The extension to Centenary Square will continue to the right behind the tram along Pinfold Street.

An order authorising the BCCE was made in July 2005.[34] Government approval was given on 16 February 2012 for the extension, a new fleet of trams and a new depot at Wednesbury; the sanctioned sum is £128m, of which £75.4m will be provided by the Department for Transport. The first new tram is scheduled to come into service on the existing line in February 2014, while the enlarged depot will be available in August 2013. The extension as far as New Street station and the full new tram fleet were scheduled to be in service from March 2015 (although the service had still not commenced by 19 November 2015 when The Queen visited Birmingham and named one of the new trams),[35] with the further extension to Centenary Square in operation from 2017.[36][37] On 14 June 2012 works on the extension officially began. Initial works include the relocation of underground services on Bull Street and Corporation Street.[38] Template:Midland-Metro-Edgbaston

The first section of the extension to Bull Street tram stop was opened on 6 December 2015. The rest of the extension to New Street was due to open on 22 May 2016, but this was delayed to allow further track alignment work. The extension eventually opened on 30 May 2016, with revisions to the timetable.[39] The track extends past the New Street Station tram stop, almost to the junction with Pinfold Street, providing a spur to allow trams arriving from the Wolverhampton direction to reverse and switch to the opposite track for the return journey.

The stated aim of Line One has always been to terminate at Five Ways.[40] On 6 July 2014 it was announced that the LEP[clarification needed] would supply over 88% of the funding needed for the Edgbaston extension to the new terminus on the south side of Hagley Road adjacent to the 54 Hagley Road office building,[41] all but guaranteeing its implementation after 2015.[42] However, there is a possibility that at the stop at Five Ways Island it will head south-east down Lee Bank Middleway then south down Pershore Road as it resurfaces from the tunnel. Then a stop placed outside the Warwickshire County Cricket Club and then divert onto Bristol Road with a stop situated near University of Birmingham and the Queen Elizabeth II hospital. But these plans have been put on the back burner due to a lack of funding.[citation needed]

Previously, Birmingham City Council looked at the possibility of constructing an underground railway. Mike Whitby, leader of the council from 2004[43] at one stage spoke in favour of an underground railway, which he claimed would be faster and much cheaper to operate.[44] In February 2005, Liberal Democrat councillor Paul Tilsley, who became deputy leader of the council later that year, stated that a proper underground was needed, and that people would not stand for the mayhem that building a street tramway would cause.[45]

The council commissioned Jacobs Engineering[46] and Deloitte to look into the feasibility of underground trams, but in June 2005 the Birmingham Post reported that tunnelling would be unaffordable and not meet government funding criteria. Mr Whitby stated that he would challenge the way the studies had been carried out,[44] but the eventual outcome was acceptance of a street tramway. By September 2008, the council's interest had shifted from the full BCCE[43] to a shortened version between New Street and Snow Hill stations, which do not have connecting trains.

Centenary Square tram stop

Centenary Square is a stop for the planned extension of Line one of the Midland Metro into Birmingham City Centre in the United Kingdom.[47] Transport for West Midlands have issued a plan of route showing this as their stop outside the new Library of Birmingham on Broad Street, a major thoroughfare of the city.

Brindleyplace tram stop

Brindleyplace is a proposed tram stop on the Edgbaston extension of the Midland Metro. Centro have drawn up plans that show the stop near Brindleyplace on Broad Street. It is presently planned to be opened by 2021, as part of the third phase of the Birmingham extension of Line 1, after the New Street to Centenary Square extension has been finished. Funding has been earmarked for the extension, and the Greater Birmingham and Solihull Local Enterprise Partnership will be supplying funding.[48][49][50]

Edgbaston tram stop

Edgbaston is a proposed stop for the planned extension of Line 1 of the Midland Metro into Birmingham City Centre in the United Kingdom. Network West Midlands have issued a plan of route showing this as their stop on Hagley Road, a major thoroughfare of the city, in the constituency of Edgbaston, located outside the city centre. This is the last proposed stop to be built on line 1. It is presently planned for the stop to be opened by 2021, as part of the third phase of the Birmingham extension of Line 1, after the New Street to Centenary Square extension has been finished. Funding has been earmarked for the extension.[51][52][53]

Line One Wolverhampton City Centre loop

Template:Midland-Metro-Line-One+Ext An extension from the existing terminus in Wolverhampton running through Market Street and Lichfield Street and then serving Wolverhampton bus station and Wolverhampton railway station, part of the Phase Two Extensions, was made a separate project following stagnation of the project to build a line to Walsall. It was to take the form of a mainly single-track loop-and-spur extension to Line 1, with an estimated cost of £30 million.[54] By July 2009, the loop had gained funding preference over the Stourbridge route via Dudley and Brierley Hill, and a leaflet gave basic details of the proposal.[55]

Centro hoped to complete the scheme by 2014,[56] but in May 2010 Wolverhampton councillor Paddy Bradley stated it was "on the back burner". Although the 2009 leaflet included a route plan and stops, Centro's spokesman Steve Swingler said "We expect to announce the preferred route later in the summer".[57]

The plan entailed southbound trams from Wolverhampton first going around the city centre to the railway station. In July 2010, Centro Director General Geoff Inskip hinted that the scheme would be reworked by taking it to "places people need to go, such as the University", and not taking passengers to the railway station and back "if they don't actually need to go there".[58] The reworked scheme, costing £50 million instead of £30 million, might be routed over part of the ring road.[58] In 2012 Centro announced that they would be pressing ahead with a cut down version of the original scheme, which they hoped would take place before 2015. The cut down version would create a branch running from the existing terminus at St. George's, connecting the bus and rail stations, with the creation of a loop through Market Street and Lichfield Street happening at a later date.[59]

In March 2014, it was announced that the Wolverhampton Extension would go ahead as part of a £2bn connectivity package. The new line would see two new stops built at Piper's Row and Wolverhampton Railway Station, which will see trams terminate alternately at the Rail station and at the existing St George's stop. The new stops will be constructed between 2015 and 2019. Though the Extension to Wolverhampton railway station has been said to be completed by the end of 2015.[60] The Transport and Works Act Order was approved by Secretary of State Patrick McLoughlin in 2016.[61]

Line Two eastside extension

Template:Midland-Metro-Line-Two-Coventry In November 2013, Birmingham City Council leader Albert Bore announced that a task group was considering the construction of a second metro line from Birmingham City Centre, along Fazeley Street to Birmingham Airport and terminating at Coventry. Simultaneously, Centro released a proposed map of the route, taking in a loop between the interchange at the airport, Small Heath and Lea Hall.[62] The line would spread the benefits of integrated transport beyond the centre of Birmingham and was part of a wider initiative to better connect both cities to the proposed High Speed 2 interchange at Curzon Street.[63]

In February 2014, it was announced that funding had been secured for the first phase of Midland Metro's Line Two extension to Eastside, including three new stops at either Moor Street or Albert Street, and Curzon Street,[64] before a terminus at Adderley Street.[64] Centro are currently undertaking public consultation of two proposed routes, with both proposals aiming to join the existing Line One at a junction between Bull St and Corporation St.[65] The main aim of the consultation is to establish whether commuters would prefer a shorter, and therefore quicker, route through to Curzon Street from New Street, or if a slightly longer route with a tram stop directly outside Moor Street would be more agreeable. If the latter option were favoured, it would mark the achievement of what has long been regarded as a major aim for the Metro, namely to connect all three (four when Curzon St reopens) city-centre stations by rapid transit. Any extension would have to be completed before the projected commencement of High Speed 2 services in 2026.

Present confirmed expansion plans

The extension projects with confirmed funding will produce a network as follows:

Template:Midland Metro Combined

Rolling stock

An original T-69 tram alongside a Urbos 3 at Wolverhampton

The Midland Metro is operated by a fleet of 21 Urbos 3 trams, constructed by the Spanish manufacturer CAF. The present fleet was introduced into service during 2014-15, replacing the original fleet of 16 Italian-built Ansaldobreda T-69 trams.[66]

Urbos 3 tram on display at Wolverhampton

In February 2012, Centro announced that it was planning a £44.2-million replacement of the entire tram fleet.[67] CAF was named preferred bidder for 19 to 25 Urbos 3 trams.[68] A £40 million order for 20 was signed, with options for five more.[69] The new fleet provides an increased service of 10 trams per hour in each direction, with an increased capacity of 210 passengers per tram, compared with the 156 passengers on the former T69 trams. The Urbos 3 trams are 33 metres long; 9 metres longer than the former T69 stock, and have a maximum operating speed of 70 km/h (43 mph).[70]

The first of the new trams was unveiled at the Wednesbury depot in October 2013,[71] with the first four entering service on 5 September 2014, they replaced all of the T-69s in August 2015.[72]

Four T-69s (01, 07, 03 & 04) have been transferred to the tram test centre at Long Marston in October 2014.[73]

Extension proposals

Wednesbury – Merry Hill extension

West Midlands Metro
Wednesbury to Brierley Hill extension
Line One
Tame Valley Canal
Golds Hill
Walsall Canal
Great Bridge
Horseley Road
Dudley Port National Rail Parking
Sedgley Road East
Birmingham New Road
Tipton Road
Dudley Castle
Dudley Town Centre
Flood Street
New Road
Cinder Bank
Pedmore Road
Canal Street
Waterfront
Merry Hill
Brierley Hill Parking

From Line 1 in Wednesbury, the Brierley Hill Extension (WBHE) would follow the disused South Staffordshire Line, through Tipton to the vicinity of the former Dudley Town station (which closed in 1964 and was later the site of a freightliner terminal), then on-street into Dudley town centre. It would leave Dudley alongside the Southern Bypass to access the railway corridor, leaving it at the approach to the Waterfront/Merry Hill area and Brierley Hill and then on to Stourbridge.[74]

Centro has stated that the WBHE would provide 10 trams per hour, alternately serving Wolverhampton and Birmingham. Journey time from Brierley Hill to West Bromwich was stated as 31 minutes.[75]

However, these plans have been complicated by the desire of Network Rail to reopen the South Staffordshire Line for the use of freight trains, which last used the route in 1993. Various proposals have been put forward as to how trams and freight trains could coexist on the same corridor, early proposals involved trams and freight trains using different tracks. But since 2008 Centro has favoured the use of tram-trains, which can share the tracks with freight trains.[76]

In October 2010, the 'Black Country Joint Core Strategy'[77] cast doubt on implementation of the WBHE, claiming it may not be delivered by 2026.[78]

In March 2011, the business plan for the reopening of the South Staffordshire Line between Walsall and Stourbridge for the Midland Metro was submitted to Network Rail.[79] Trams would share the line with freight trains, and a decision from Network Rail on the scheme between Stourbridge and Walsall was due in the summer. In December 2012, Centro stated that they intended to build the line in phases to make the scheme more affordable, with the first stretch running from Wednesbury to Dudley. No time scale has been put on the latest plans.[80]

Sprint

Sprint
Quinton Road
Birmingham
Colmore Row/Snow Hill
National Rail Tram interchange
Edmund Street
Centenary Square Tram interchange
Broad Street Tram interchange
Edgbaston Tram interchange
Hagley Road
Hagley Road/Chad Road
Hagley Road
Hagley Road/Apollo Hotel
Hagley Road/Sandon Road
Hagley Road West/
Bearwood Bus Interchange
Bus interchange
Hagley Road West
Hagley Road West/
Wolverhampton Road
Hagley Road West/
Innkeeper's Lodge
Hagley Road West/
Quinton Church
Ridgeway Avenue

In July 2014, it was announced that a new BRT bus-tram service named Sprint would be introduced on the Hagley Road, from which it would connect with the western end of Midland Metro's Line One extension.[81] Viewed as 'Metro's Little Sister', Sprint is intended to offer a higher level of service quality than standard bus services, and will feature some bus priority measures, like bus lanes and priority signalling to speed up service. Sprint should grow demand, and improve connectivity in areas which do not yet fully justify Metro access.[82] Centro themselves have stated that the new Birmingham-Quinton route was chosen primarily for its potential for economic growth.[83] The route will have 16 stops.[84]

If the Quinton line is successful, there are plans to expand Sprint by running a service down the Coventry Road to the airport, connecting with the existing Sprint service in the city, thereby providing a cross-city connection which is currently not offered by bus or Metro.

Historic planned extensions

In 2004, the proposed Phase Two expansion included five routes:[85]

Birmingham City Centre to Great Barr

A 10 kilometres (6.2 mi), 17-stop route from the city centre through Lancaster Circus and along the A34 corridor to the Birmingham/Walsall boundary, terminating near the M6 motorway junction 7.

Birmingham City Centre to Quinton

A 7.5 kilometres (4.7 mi) route from the BCCE terminus at Five Ways along the Hagley Road to Quinton.

Wolverhampton City Centre to Wednesfield, Willenhall, Walsall and Wednesbury

This 20.4 kilometres (12.7 mi) "5Ws" route would connect Wolverhampton city centre to Wednesfield, Willenhall, Walsall and Wednesbury, and provide direct access to New Cross and Manor Hospitals, partially using the trackbed of the former Wolverhampton and Walsall Railway. This link was officially declared dead in the Express & Star on October 23, 2015.[86]

Birmingham City Centre to Birmingham Airport

  • (A45)- A 14 kilometres (8.7 mi) route from Birmingham Airport/ National Exhibition Centre and serving suburbs along the A45 road. Journey time from central Birmingham (Bull Street) to the airport was estimated at 29 minutes. This proposal has now been incorporated into the proposals for Line Two.[87]
  • (A47)- In September 2010, the Birmingham Post reported that a "£425 million rapid transit system" between Birmingham city centre and the airport "could involve a new light rail scheme".[88] Centro strategy director Alex Burrows stated "the Birmingham City Centre to Birmingham Airport Rapid Transit plan will deliver connectivity between the city centre, Birmingham Business Park and Chelmsley Wood".[89]

Accidents and service disruptions

There have been several instances of trams colliding with road vehicles at crossings, including one collision in February 2003 in Wolverhampton where the car driver was killed.[90] There has been at least one collision between trams, including one in December 2006 near Benson Road station, in which 16 people sustained minor injuries.[91][92]

Technical and maintenance failures, severe weather and vandalism have led to some service disruptions. In summer 2001 the Wolverhampton section was temporarily closed because of a risk of electrocution posed by drooping power cables.[93]

Evaluations of success

Two T-69 trams on the existing street running section in Wolverhampton

Since its opening in 1999, Midland Metro's existing line has not been as successful as hoped, attracting far fewer passengers than initially predicted.[26][94] At the planning stage it was projected that the line would carry 14 to 20 million passengers per year, but it has actually carried around five million.[94][95]

Numerous reasons have been suggested for the relative under performance of the line, including that the line has lacked visibility, being confined to Snow Hill station at the edge of Birmingham city centre, and is therefore relatively unknown. Other grounds for the line's underwhelming performance include the fact that there are quicker trains running between Birmingham and Wolverhampton and that the line does not serve New Street station, or any of Birmingham's major visitor attractions except for the Jewellery Quarter, which is already well-served by suburban trains.[26][94] Nonetheless, overcrowding has sometimes occurred on trams at peak hours.[96] It is hoped that the extension of Line One to New Street will greatly increase the number of passengers using the tram service to other destinations between Birmingham and Wolverhampton.

Economics

At Line 1's opening, it was operated by a for-profit company Altram owned by John Laing, Ansaldo, and National Express. Soon after opening it became evident to all three partners that operating revenue would not cover costs.[95] In February 2003, The Times reported that the Metro's auditors had refused to sign off its accounts as a going concern.[97]

Ansaldo and Laing decided to withdraw from involvement in the Midland Metro, which they felt would not be profitable, and had ceased practical involvement as early as 2003, but their official exit took place in 2006.[95] Day-to-day operation has since been in the hands of National Express Midland Metro, with losses largely covered by cross-subsidies from other parts of National Express's business.[95]

The Commission for Integrated Transport (CfIT) gave an overall cost estimate for British systems of £3.79 per light-rail vehicle-kilometre in 2003–2004, compared with £0.94 per bus kilometre in 2002–2003, according to Rapid Transit Monitor 2004. CfIT estimated that the fare required for Midland Metro to break even was twice that of Manchester Metrolink, London Tramlink and the Tyne and Wear Metro.[98]

References

  1. ^ "Light Rail and Tram Statistics: England 2015/16" (PDF). www.gov.uk. Department for Transport. 7 June 2016.
  2. ^ 21st July 2016 09:12 (1 July 2016). "National Express Midland Metro". Nxbus.co.uk. GB-BIR. Retrieved 21 July 2016.{{cite web}}: CS1 maint: numeric names: authors list (link)
  3. ^ "Birmingham Corporation Transport The Tramways 1872-1953". Archived from the original on 12 February 2013. Retrieved 18 March 2013. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  4. ^ Boynton 2001, pp. 72.
  5. ^ a b c Boynton 2001, pp. 73.
  6. ^ Boynton 2001, pp. 74.
  7. ^ Annual Report 1988–1989. West Midlands PTE.
  8. ^ a b c "Midland Metro, The Metro Project". Light Rail Transit Association. Retrieved 25 March 2012.
  9. ^ Midland Metro Line 2 map (Map). WMPTE.
  10. ^ "Midland Metro – City Centre Extension & Fleet Replacement Strategic Case, October 2009". www.centro.org.uk. Retrieved 7 March 2013.
  11. ^ "House of Commons Debates (pt 27)". UK Parliament. 20 November 1995.
  12. ^ "Big bill for late Midland metro". New Civil Engineer. London. 11 March 1999.
  13. ^ "Archived copy". Archived from the original on 5 February 2014. Retrieved 2012-06-13. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)CS1 maint: archived copy as title (link)
  14. ^ a b "Midland Metro Light Rail Network, United Kingdom". Railway Technology. 2011.
  15. ^ "Midland Metro". Rail Around Birmingham and the West Midlands.
  16. ^ "Midland Metro : Tram Stops". thetrams.co.uk. Retrieved 16 March 2013.
  17. ^ "Wolverhampton Low Level". Subterranea Britannica.
  18. ^ "Metro". Network West Midlands. Retrieved 14 November 2013.
  19. ^ West Midlands Planning And Transportation Subcommittee (31 July 2009). "Public Transport Update".
  20. ^ "Huge losses hit Metro". BBC News. 7 February 2003. Retrieved 12 May 2010.
  21. ^ Created by One Black Bear (2 January 2016). "Purchasing tickets | Tickets & prices | National Express Midland Metro". Nxbus.co.uk. GB-BIR. Retrieved 21 July 2016.
  22. ^ "Historic Plans to Change Transport in Birmingham". Birmingham Post. 11 November 2013. Retrieved 11 November 2013.
  23. ^ "Midland Metro – City Centre Extension & Fleet Replacement – Strategic Case" (PDF). Centro. October 2009. p. 21.
  24. ^ "Midland Metro to shut for two weeks". Express and Star. Wolverhampton. 11 July 2010.
  25. ^ "Metro upgrage work taking place later this year". Centro. 2010. Archived from the original on 28 July 2010.
  26. ^ a b c "Call for Metro to reach to city centre". Birmingham Post. 24 May 2005. Retrieved 17 March 2013.
  27. ^ "Birmingham City Centre Extension and Fleet Replacement". Centro.org.uk. Archived from the original on 1 March 2013. Retrieved 13 February 2013. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  28. ^ "Centro unveils plans to extend the Metro to Centenary Square". The Business Desk. Retrieved 15 October 2013.
  29. ^ Brown, Graeme (15 October 2013). "Major step forward for Midland Metro plans". Birmingham Post.
  30. ^ "Strategic Case". Centro.
  31. ^ "Connecting Local Communities" (PDF). Network Rail. 2009.
  32. ^ Samuel, A. (31 March 2011). "New rail station entrance boosts access to Birmingham". Rail.co. Archived from the original on 20 March 2012. Retrieved 31 March 2011. {{cite news}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  33. ^ "Midland Metro, Birmingham Centenary Square Extension". Centro. Retrieved 24 November 2013.
  34. ^ "The Midland Metro (Birmingham City Centre Extension, etc.) Order 2005". Office of Public Sector Information. 2005. Archived from the original on 23 January 2008. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  35. ^ "Queen officially reopens New Street station on Birmingham tour". BBC News. Retrieved 21 July 2016.
  36. ^ Walker, Jonathan (16 February 2012). "£128m Birmingham Midland Metro extension from Snow Hill Station to New Street Station set to create 1,300 jobs gets go-ahead". Birmingham Mail. Retrieved 16 February 2012.
  37. ^ "Construction of Midland Metro extension to begin" (Press release). Department for Transport. 16 February 2012. Retrieved 16 February 2012.
  38. ^ Lloyd, Matt (14 June 2012). "Transport minister launches scheme to extend Midland Metro to Birmingham New Street". Birmingham Post. Retrieved 14 June 2012.
  39. ^ "Metro - Metro". Centro.org.uk. 17 June 2016. Retrieved 21 July 2016.
  40. ^ "Birmingham City Council Midland Metro". 27 June 2014.
  41. ^ "Midland Metro Extension – Centenary Square to Edgbaston" (PDF). Centreofenterprise.com. Retrieved 21 July 2016.
  42. ^ "Midland Metro – Extension to Edgbaston (Birmingham) | GBSLEP". Centreofenterprise.com. 30 June 2016. Retrieved 21 July 2016.
  43. ^ a b Dale, Paul (23 September 2008). "Whatever happened to the Midland Metro extension?". Birmingham Post Newsblog.
  44. ^ a b "City metro still on track". Birmingham Post. 13 June 2005.
  45. ^ "Metro on the wrong track". Birmingham Post. 2 February 2005.
  46. ^ "Company to study plan for city tube". Birmingham Post. 2 November 2004.
  47. ^ Baker, S.K. (2015). Rail Atlas of Great Britain and Ireland (14 ed.). p. 94. ISBN 978-0-86093-669-5.
  48. ^ "Midland Metro Grand Central extension opens". British Trams Online. Retrieved 10 June 2016.
  49. ^ "Birmingham New Street tram extension opens". Rail News. Retrieved 10 June 2016.
  50. ^ http://centreofenterprise.com/wp-content/uploads/2014/03/32-Business-Case.pdf
  51. ^ "Midland Metro Grand Central extension opens". British Trams Online. Retrieved 10 June 2016.
  52. ^ "Birmingham New Street tram extension opens". Rail News. Retrieved 10 June 2016.
  53. ^ http://centreofenterprise.com/wp-content/uploads/2014/03/32-Business-Case.pdf
  54. ^ "Tram bid prioritises New St and Wolverhampton links". Transport Briefing. 17 March 2009.
  55. ^ Wolverhampton Loop – Extending Metro through the City Centre. Centro.
  56. ^ "Wolverhamptop Loop Consultation". Centro.
  57. ^ "£30m Midland Metro plan put on hold". Express and Star. Wolverhampton. 26 May 2010.
  58. ^ a b Wainwright, Daniel (3 July 2010). "Midland Metro extension to cost £50m". Express and Star. Wolverhampton.
  59. ^ "£30m Midland Metro extension plan revived". Express & Star. Wolverhampton. 2 May 2012. Retrieved 15 March 2013.
  60. ^ Brown, Graeme (12 March 2014). "MIPIM 2014: £2bn Greater Birmingham transport plans take centre stage". Birmingham Post. Retrieved 21 July 2016.
  61. ^ "Wolves Metro Extension Approved". Modern Railways. 73 (815). Railway Study Association: 21. August 2016. {{cite journal}}: |access-date= requires |url= (help)
  62. ^ "Tram line could link Coventry and Birmingham". BBC News. 12 November 2013. Retrieved 13 November 2013.
  63. ^ Elkes, Neil (8 November 2013). "Birmingham to Coventry Metro Line Being Considered". Birmingham Post. Retrieved 11 November 2013.
  64. ^ a b Brown, Graeme (27 February 2014). "£50m invested to take Midland Metro to Curzon Street". Birmingham Post. Retrieved 21 July 2016.
  65. ^ "Archived copy". Archived from the original on 16 March 2014. Retrieved 2014-03-15. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)CS1 maint: archived copy as title (link)
  66. ^ Boynton (2001), p.80.
  67. ^ "Midland Metro – City Centre Extension & Fleet Replacement: Delivery, Commercial & Financial Case" (PDF). Centro. October 2009.
  68. ^ "CAF named preferred bidder to supply new Midland Metro trams". Railway Gazette International. London. 2 February 2012.
  69. ^ "Work begins on £128m Midland Metro expansion project". Railway Gazette International. London. 22 March 2012.
  70. ^ Rackley, Stuart (3 May 2013). "CAF trams for Midland Metro Expansion Project". The Rail Engineer. Coalville. Retrieved 19 November 2013.
  71. ^ "Midland Metro unveils first CAF tram". Railway Gazette International. London. 16 October 2013.
  72. ^ "New Midland Metro trams launched into service". Centro. 5 September 2014. Retrieved 5 September 2014.
  73. ^ "Midland Metro Fleet List". British Trams Online. Retrieved 21 July 2016.
  74. ^ "The Route" (Press release). Centro. Archived from the original on 17 January 2016. {{cite press release}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  75. ^ "Wednesbury to Brierley Hill Extension Information". Centro. Retrieved 24 March 2012.
  76. ^ "Midland Metro track-share proposals gather pace" (Press release). Centro. 22 August 2008. Retrieved 7 March 2013.
  77. ^ "Black Country Joint Core Strategy". Dudley Council.
  78. ^ "Midland Metro expansion is 'unrealistic'". Express and Star. Wolverhampton. 7 November 2010. Retrieved 21 July 2016.
  79. ^ "Tram-train line work could launch in 2014". Express & Star. Wolverhampton. 21 March 2011. Retrieved 21 July 2016.
  80. ^ "Second line of Midland Metro to be built in phases". Express & Star. Wolverhampton. 24 December 2012. Retrieved 7 March 2013.
  81. ^ Brown, Graeme (30 July 2014). "Sprint buses down Hagley Road by 2016 under £15m plans". Birmingham Post. Retrieved 21 July 2016.
  82. ^ "Archived copy". Archived from the original on 8 August 2014. Retrieved 2013-02-14. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)CS1 maint: archived copy as title (link)
  83. ^ "Sprint Network Vision - Sprint". Centro.org.uk. 17 June 2016. Retrieved 21 July 2016.
  84. ^ "Sprint : Metro's Little Sister" (PDF). Bearwoodblog.files.wordpress.com. Retrieved 21 July 2016.
  85. ^ "Local Transport Plan, Light Rail Strategy". Centro. Retrieved 21 July 2016.
  86. ^ "Walsall and Black Country Metro tram link declared dead « Express & Star". Expressandstar.com. Retrieved 21 July 2016.
  87. ^ "Airport Route". Centro. Retrieved 21 July 2016.
  88. ^ Walker, Jonathan (24 September 2010). "Loans for big city transport schemes back on the agenda". Birmingham Post. Retrieved 21 July 2016.
  89. ^ "Centro in joint call over Tax Increment Financing" (Press release). Centro. 6 October 2010. Retrieved 21 July 2016.
  90. ^ "Man killed as car and tram collide". BBC News. 9 February 2003. Retrieved 21 July 2016.
  91. ^ "Tram collision causes minor injuries". BBC News. 19 December 2006. Retrieved 21 July 2016.
  92. ^ "Report released into a tram collision at Soho Benson Road on Midland Metro". Rail Accident Investigation Branch. 7 June 2007.
  93. ^ "Electrocution risk closes tram line". BBC News. 4 July 2001.
  94. ^ a b c Leigh, Stephen. "Midland Metro, A Personal Farewell". British Trams Online. Retrieved 17 March 2013.
  95. ^ a b c d "Anticipated acquisition by West Midlands Travel Limited of the joint venture shares of Laing Infrastructure Holdings Limited and Ansaldo Transporti Sistema Ferroviari SpA in Altram LRT Limited" (PDF). Office of Fair Trading. 2 March 2006.
  96. ^ Bentley, David (14 February 2013). "Midland Metro line from Birmingham to Wolverhampton to close at Easter for £128m revamp". Birmingham Mail. Retrieved 17 March 2013.
  97. ^ Court, Mark (12 February 2003). "Auditors at Midland Metro refuse to sign off accounts". The Times. London. Retrieved 12 May 2010. (subscription required)
  98. ^ "Affordable mass transit – guidance". Commission for Integrated Transport. 2005.

Bibliography

  • Boynton, John (2001). Main Line to Metro: Train and tram on the Great Western route: Birmingham Snow Hill – Wolverhampton. Kidderminster: Mid England Books. ISBN 978-0-9522248-9-1. {{cite book}}: Invalid |ref=harv (help)